132004.240018.A - Request to change an existing Approval
. ,
Bridge Option Analysis
Consideration has been given to a proposed bridge across Cooroy Creek however, this option has been
dismissed given the flood mitigation measures that are provided by the culverts.
The culverts in their proposed form will reguiate flows to ensure upstream and downstream conditions are
"balanced" to a point where non.worsening of private properties is achieved. The construction of a bridge
effectively removes this mitigation and has the potential to increase flooding downstream of Garnet Street.
Furthermore, given the substantial floodway width across Garnet Street and the physicai constraints of the
Ccoroy Creek alignment, construction of a bridge is not considered a viable option.
Blockage Factors
Queensland Urban Drainage Manual (QUDM - 2013) provides suggested a blockage factor of 0% for a clear
opening greater than 3.0m. Table 10.4.1 - Suggested blockage factars far culverts highlights that a design
blockage value of 20% should be assigned to culverts less than 3.0m in height or less than S.Omwidth.
A 20% blockage factor is considered appropriate given the culvert sizes and site characteristics and has been
adopted for modelling purposes by Hydrology and Water when undertaking the flood modelling analysis.
In accordance with best practice, a sensitivity test has also been carried out using a blockage factor of 50% in
order to gain an understanding of any additional flood risk associated with a higher blockage scenario. This
sensitivity test is documented in the Hydrology and Water report (2014) titled "Garnet Street Culvert Upgrade
Hydraulic Assessment".
Flood Impacts of the Revised Upgrade Design
As part of the Hydrology and Water report (2014) titled "Garnet Street Culvert Upgrade Hydraulic Assessmen('
a series of Peak Flood Level Impact maps have been provided for the 2.Year ARI (39% AEP), 10.Year ARI (10%
AEP) and 100.Year ARI (1% AEP) rainfali events. These maps show the increase and decrease in levels between
the most recent design scenario and existing scenario.
Caples of these results are located in Appendix C of the Hydrology and Water report (2014) and a summary
discussion of these results is provided below.
o The upgrade provides a significant improvement to the flood immunity of the Cooroy Creek crossing. The
current road crossing is un-trafficable in events as frequent as the 2 year ARI, while the revised upgrade
design wili remain trafficable during events up to the 10 year ARI. Road closure times during large flood
events will also be significantly reduced.
o The proposed works are predicted to reduce 2 year ARI flood levels upstream of Garnet Street by
approximately 200mm. Peak 2 year ARI flood leveis immediately downstream of Garnet Street reduce by
up to 90mm.
o The proposed works are predicted to reduce 10 year ARI flood levels upstream of Garnet Street by
approximately 20 to SOmm. Peak 10 year ARI flood levels immediately downstream of the Garnet Street
culverts reduce by up to 1oomm. There is also a localised peak flood level impact of approximately
100mm located over the sporting fields immediately downstream of the proposed western culverts. The
10 year ARI impact map shows flood level increases over Garnet Street which is due to the proposed
raising of this road. It is noted that while flood levels over the road have increased, peak fiood depths over
the road have actually reduced due to the elevated road level.
o There are some localised peak flood level impacts for the 100 year ARI event of up to 20mm upstream of
the Garnet Street road reserve. These impacts are contained over a vacant, low-lying bushland site which
is already subject to peak 100 year ARI depths in the existing case of generally between 0.5 to 1m. There is
also a localised peak flood level impact of approximately 180mm located over the sporting fields
immediately downstream of the proposed western cuiverts.
o The upgraded crossing is not predicted to be trafficable for regular vehicles during a 100 year ARt flood
however, peak depths and velocities over the upgraded crossing during this event are such that it would
be expected to remain trafficable for emergency vehicles.
o The sensitivity testing of the 50% culvert biockage factor predicts that peak 100 year ARI flood levels will
increase by up to approximately 100mm. Generally speaking, this level of flood level impact is not
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132004.240018.A - Request to change an existing ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 4.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.