Council archive · source document
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654
+ - ESC SRD Gye mete Wye em CoH NOTES: Bia * Slab and Footings a8 per engineers designs a nul Y ] * Provide Termite Proloction as per AS 3560 “ALL Moor levels Lb. onsite Promtnty acour “ALL Hoo joist to be specilied by engineer OPSs uc Ne 173972 ; NOTE SUPGTTITION OF AH STRUCTURAL MEMPERS, SIZES, GRADEB OR ANY VARIATION TO ANY FART OF THE DESIGN MILL RENDER NULL AKD VOD AKY RESPONSIBILTY OF MAGE + OESIGH PTY LID FOR THE STRUCTURAL INTEGRITY AND PERFORMANCE OF THE BULOING building designers association of Ly § queensland inc. 4é 44 IMAGE + a é 4 f DESIGN = BUILDING DESIGNS & OU ORMACt Oe SIH Com AL Jolote to deck @ 450mm ctre se paea era acuta 320 per frame manufacturer Attn ss.658 S120, 3 CCCOYRGHI CESERYED PAR Of tean E TIEOE rpms AEE ? AWECEOCTETY OF MAGE « DEHGH, 2 MENTE Orr nsronen TAKE : ‘BIALCEE TO ATELY Dean siperg : CODIEE IC NONEY CE SCONES OF $ acrceancins omsut vad Sr CESONERS RGCOnAMITIES i THESE Abs PEM AIN Coe 2 tOenED Or ance aves i ASEPAIDULEIAL beam by frame manut./ engincer |. PRCT 100mm 99 post as selected PROPOSED RENOVATION 12 PIPER ST PEREGIAN BEACH BEE C.021109 QAIE 300709 © JOIST LAYOUT IS DIAGRAMMATIC ONLY - ENGINEER TO CONFIRM ALL MEMBERS TO BE SPECIFIED BY ENGINEER OOR JOIST PLAN ALL BEAMS TO BE IN PLANE OF FLOOR JOISTS WHERE POSSIBLE SCALE 1:100 @ @ UPPER FLOOR, JOIST PLAH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.