Council archive · source document
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published] · 172009.1654
INTEGRATED PLANNING ACT 1997
Eat. COC GSE palioaliet bers
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following appl
[] the application seeks a preliminary approval only;
{] the application is Not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is onty for a change of use, or for the following types of work carried out Solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controling weeds or pests); :
[jal costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
1 the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submt a OLeeve Nolification and Payment Form {no payment required if owner-builder, permit number Steled). The receipted form must be
@ Sighted by the assessment manager before a development permit can be gen.
<
if. ts Payment of a PLSL levy applicable to this application? (Refer to Q10 and ihe Advice below for more information)?
[] No - Endorpeaa
Yes - Answer Q12 below
12, Has the PLSL levy beén paid?’ . ,
No - (NOTE: An application can be lodged prior to payment of the
the Assessment Managér before a development permit
Notification and Payment Form to QLeave. )
applicable PLSL levy. However, the levy must be paid and the receipted orm sighted by
may be given for this application. To pay the levy you will need to complete and submit a
oO Yes - Complete Table J and submit, with the application, the "yellow" (Local Government's (Council) / Private Cattifier’s) copy of the receipted OLeave Sorm
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier} (Optional)
Ps Leena, | Et) 09) nore |
eee
Receiving officer's
Fee ($) 41: Date received [ae Pe name
FEA RENERTS:
VORENGAGEMEN T:
1
Privacy Statement :
The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP} in accordance with the processing and assessment of your Application.
Your personal details will nol be disclosed for a Purpose outside of the IDAS process, except where required by legislation {including the Freedom of Information Act 1 992) or as
required by Parliament. This information may be stored in a DIP database. The infomation collected will be retained as required by the Public Records Act 2002.
Advice for completing Part A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1654 - Preliminary Building Works Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.