Original source · versioned page text
2017-11-07 Services & Organisation Committee Agenda
The original of this document is very large (19.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 7 NOVEMBER 2017
Areas of key focus for the group in the coming year will be:
Disaster exercise
Spontaneous volunteers guideline
Get Ready program.
9. Recovery Sub-Committee
The Recovery Sub-Committee is chaired by Councillor Jurisevic in his role as the Deputy Chair of
the LDMG. It comprises the Chairs of each of the four Recovery functional groups – Economic,
Environment, Human-Social and Infrastructure, all of whom are Council officers, and
representatives of the State Government departments with lead agency responsibility for
recovery.
The Recovery Sub-Committee met twice in 2016/2017, once at the beginning of the storm
season and once at the end of the season. It was not required to stand up in response to Ex TC
Debbie.
10. SES Support
The Noosa SES consists of four units comprising approximately 70 volunteers. The units are
located at Tewantin, Cooroy, Pomona and Boreen Point.
Following the retirement of Stan Ryan in March 2017, Pauline Eglington became the Acting Local
Controller and was subsequently appointed to the role of SES Local Controller in September.
Pauline will appoint a Deputy Controller in the near future.
The SES has attended 422 requests for assistance in 2016/2017 with the main responses being
storm damage and sandbagging during Ex TC Debbie, or other rain events. They also assisted
other agencies with traffic control and land searches and undertook community education
programs around the Shire.
Council provides financial support to meet the costs of operating and maintaining the SES
buildings, vehicles, trailers and operational equipment, as well as the purchase of goods and
materials used by the SES during activations (see Finance section for further details).
Purchases and maintenance of significance during the year includes:
Replacement and fit out of Troop Carrier. Partly funded by a $15,000 grant from the State
Emergency Service Non-Recurring Grants
Overhaul of telephone system at Tewantin facility
Repairs to roof at Tewantin facility
11. Additional ALERT flood warning stations
Four new flood warning stations have been installed for the Six Mile Creek at:
Garnet Street, Cooroy
Elm Street, Cooroy
Liane Drive, Lake Macdonald
Subway Park, Pomona (dual gauge to monitor subway underpass and upstream of Hill
Street)
One new flood warning station has been installed for the Noosa River at Kin Kin Gympie Road,
Wahpunga.
12. Community Disaster Management Sub Groups
Three community disaster management sub groups are operating in Noosa Shire at Kin Kin,
Cooran and Pomona. During 2016/2017 meetings were held at Kin Kin and Pomona. The
Pomona group was exercised in November 2016 with the evaluation report presented to the
LDMG. Subsequently a review of the Pomona Disaster Management Sub Plan was conducted
and a further exercise for the Pomona group is planned before the end of 2017.
Page 77 of 135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.