Skip to the record
Every meeting, every word.

Original source · versioned page text

2017-11-07 Services & Organisation Committee Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                       7 NOVEMBER 2017


BRANCH ACTIVITIES                       RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
Infrastructure Planning, Design &
Delivery
Signage Policy                             Policy adopted by Council                   Seeking feedback on guidelines and          Collating feedback on guidelines and
to implement the signage guidelines        Developed draft guidelines and                criteria.                                     criteria.
and design criteria                          criteria and distributed for feedback.

Hinterland Playground Plan Plan and        Survey completed                            Developing concept for consultation         Engage design consultant to prepare
design (subject to Grant Funding) an       Overarching concept plan developed          Continue market sounding to                   formal design concepts for public
iconic playground in Cooroy                Peer consultation of overarching              engage an appropriately skilled               consultation.
                                             concept plan.                                 design consultant.                          Commence public consultation.
                                           Market sounding for design to
                                             identify suitable candidates for
                                             developing design.
                                           Preliminary consultation with local
                                             interest groups commenced.
Rufous St digital hub project              Construction is 75% complete                Monitor construction of electrical and      Manage completion and handover
Construction of the Rufous St digital                                                      information technology elements of            process.
hub project                                                                                building

Investigate key transport strategies       Advertised for Project Manager.             Engage client expert.                       Engage consultants for key
Recruit a Project Manager and              Expressions of interest for client          Recruit Project Manager                       Transport Strategy priorities.
commence investigation of the five           expert issued.                              Councillor workshop to provide an           Advise successful applicants to the
prioritised strategies in the Noosa        EOI responses received.                       update on the Transport Strategy.             ‘Walk and Ride to School’ program
Transport Strategy 2017-2027               Engaged consultant to investigate           Invite local schools to participate in      Appoint Transport Strategy Project
                                             priority transport lanes.                     the ‘Walk and Ride to School’                 Manager.
                                           Commenced discussions with key                program.                                    Review client expert reports.
                                             industry specialists.
Streetscape Plans commence work            Survey work in Cooroy precinct.             Commence concept plan for raised         
on streetscape plans for three                                                             crossing in Maple St Cooroy
precincts

Infrastructure, Planning Design &          Improved business processes to              Monitor the implementation of               Ongoing implementation through
Delivery                                     include consideration of Design               business processes                            staff inductions, consultant briefings,
Ensure Noosa's Design Principles and         Principles.                                                                                 design checklists.
the Noosa Style are considered in the
planning of future projects



                                                                                             Page 86 of 135
Log in to download the original file

2017-11-07 Services & Organisation Committee Agenda(PDF, 18MB).pdf · 19.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.