NOTES
GENERAL
1. Wind Classification N3
2. All work to conform to the current Building Code of
Australia- Class 1 & with AS1684.2 Residential Timber
Framed Construction-N4 as applicable to the work.
3. The Builder shall check all dimensions, levels& details
before excavation, construction & ordering. Report
discrepancies to designer.
4. Do not scale drawings.
5. The drawings and specifications shall be considered es 7
complementary, and any work and/or materials absent ia eo
from one but present or implied in the other shall be | Ss
furnished as if they were present in both. ee
6. Drawings shall be read in conjunction with consultants
drawings.
7. All work, materials & associated fixing methods shall
conform to respective manufacturer's specifications & |
Australian Standards as applicable to the work.
8. Construction shall not proceed before approval in writing
has been received from both the Building Certifier & Council
as applicable.
9. It is the obligation of the contractor and / or plumbing
contractor to survey all existing services prior to
construction.
10. No footing, or wall to encroach the title boundary.
11. All proprietary waterproofing systems to be installed in |
accordance with the manufacturers recommendations.
12. Plumbing to be carried out by a licensed plumber and in
accordance with the requirement of local authorities.
the contractor shall be responsible for all permits and
approvals. all hot water lines shall be fully insulated.
Sanitary plumbing shall be connected to existing system
with materials approved by the local authority.
13. Termite protection to be carried out in accordance with
AS3660.1Termite Management- New Building
STORMWATER DRAINAGE
1. All stormwater runoff is to be directed to 100mm dia
PVC downpipes to connect to an approved outlet in
accordance with AS3500.3 or to water tanks as per
Council Guidelines
2. The control of stormwater pollution from the building
site shall be carried out in accordance with the
"Best Practice Guidelines".
Site Plan
- } 1: 1200 7
EXACT POSITION OF BUILDING ON THE SITE
REFERENCE DOCUMENT
EXE25/0009
NOOSA COUNCIL
28 MARCH 2025
TO BE CONFIRMED BY BUILDER IN
ACCORDANCE WITH SURVEY PLAN
PROPERTY DESCRIPTION
Lot 31 on SP149578
Area 6.1949 Ha
NORTH
Engineering & Building Investigation Services
Proposed Alterations / Raising of
Existing Residence
Client - Robert Killeen
SITE PLAN
‘ 3 7 Sheet No. ig
Unit 2/4 Textile Ave. Warana_ PO Box 973 Buddina 4575 at Lot 31 (No. 81) Lake Flat Road — 2 ane A3-220221- 1
Boreen Point Drawn by —
Phone 07 54369199 Fax 07 54369198 fawn by HS | a
Checked by “re A st | Scale 1: 1200
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.