Original source · versioned page text
2021-09-13 General Committee Meeting Agenda
The original of this document is very large (21.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 13 SEPTEMBER 2021 7.2. Site Description The site is part of Lot 3 SP 246584 located at 28 Eenie Creek Road, Noosaville. The lot is irregularly shaped and approximately 31.73ha in area. The following image is of the current title: Figure 11 – Current title The site has frontages to Eenie Creek Road (approximately 730m) and Walter Hay Drive (approximately 1,030m), which both form part of the major road network identified by The Noosa Plan. Neither of the roads are State controlled. Vehicular access to the site is currently provided from Eenie Creek Road, Walter Hay Drive and Hofmann Drive, with both intersections functioning as roundabouts. An additional roundabout intersection has been constructed on Walter Hay Drive at the southern end of the site in anticipation of future development. Pedestrian and cyclist access to the site is primarily provided via a path from the Eenie Creek Road frontage, with pedestrian/cycle tunnels constructed under both Eenie Creek Road and Walter Hay Drive. The site is within a few kilometres of secondary activity centres at Tewantin, Noosaville and Noosa Junction. The Noosaville industrial estate is located to the immediate west of the site, with a large retirement village located to the north, with the North Weyba section of the Noosa National Park and Lake Weyba to the east. At a regional scale, the site is located approximately 27km north of Maroochydore, the primary activity centre. The proposed development is situated on Lot 22 of the recently approved reconfiguration. A plan seal application has not been lodged, with the works required for the subdivision currently under construction and accordingly the lot is yet to be created. The following image details the approved reconfiguration layout. Page 49 of 135
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.