Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2021-09-13 General Committee Meeting Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   13 SEPTEMBER 2021




                                                       Attachment 1




                                                        Page 58 of 135

€       dient sign-off                           date:                                                                                                        x        =        nied | Sete                                                                                                       Sketch Design          _)

                                                                                                                                                           Oo                                                                                                                                                         Attachment                     1

                         Lot 22, part of Lot 3/ SP 246584 Proposed Details:
                         Class:
                         Building Class 5 (office)
                         Building Class Ga (medical) TBC
                           te Area's                                                        Via                                                                                                   i                    i
                         a       .                                                               Po ee.
                         Land Area:       3,831m2                                                                                                                                                                      i
                        083! Cov          715m2                                               \                                                             or                                                ZA
                         Easement AB        745m2                                               \                                                                                                          -           ——     ae
                         Land for Dev:      2,371m2                                              x                                                                                                A, er                |         ~
                        Plot Ratio:        08                                                                          rl                                                                                                                                                                                  eee
                        Max GFA:          3,085m2                                                   “e                                                                                  |                              |
                                                                                                                  a                    a                   a                      a                                    ‘
                        Proposed GFA's:                                                                   Ww          %                                                                g       é                       |
                        Ground:            4,119m2                                                         :                   OS                                                        j                             j
                        First:            4,088m2                                                          \.           \           N                                                                                  |
                                                                                                               \          \            ~                                                                               |
                        Total:             2,207m2                                                               .        \               \                       fs"             /
                                                                                                                  \        \                 ~~                 t tye)         /                                       1
                        Parking:                                                                                   3        \                   '                           of                                         |                                                                                                  ‘
                                                                                                                    Cee                              >                                                                 |
                         Basement 2:      48                                                                          .       \                                                                          ENT AB        |                                                                                                 a7
                        Basement 1:       48                                                                          \      \                   /                                                                     :
                        Ground:            13 (+ emergency services bay TBC)                                           .      i\                ze                                                                     |
                        MiBikes:           46 (counts as 4 cars)                                                        \ee    \\                                                                                      j
                        Total:             11                                                                            \e     \\        ze                          /        i                                       |
                                                                                                                         . a   \\           Z                             ;
                        Cars required      2,207m2/20= 110                                                                eh            /                                                                              |
                         MWibikes required: TBC based on use area                                                         \       eZ                                                                                   !
                        Bicycles achieved: 14                                                                              -        V4                                                                                 |
                        Bicycles required: 13 (1/50m2 up to 500 then 4 for every 500)                                       \                                                  v                                       :
                         Landscaped Area: 1,238m2 (32%)                                                                        A                                                    I¢            !                    |
                        Requirec:          575m2 (15%)                                                                           .                                                                |
                                                                                                                                 \.                                                               I                    |
                                                                                                                                     N.          :                                                |                    |
                                                                                                                                         \                                                        !                    i
                                        \                     |                                                                                 a                       |            | @          th                   j
                                       \                WY  74                                                                              See   psy                  fe   tee]         pedo
                                             a ri
                                 \              TU        .

                        landscaping key plan

                                                                                                                                                               OFS

             -_                                                              FReegReawommnpmnmenerme                                                                                                                                                                 SOOT                                   CCC           ON
          J                                                       =                                                                                                                                                                                                                                               /        \      \
         {s parks           architects                                              .                                       Lot 22, Noosa Civic                                     Stockwell Development Group            176        MC          Site Plan                                           SD 3.1      (        )      }
         \                                                                             ee       oan                        project                                                  client                                 job no     drawn       drawing                                             dwg no.     Mest            /
Document SetiD:-21574645-                                    —                          -                                 -                                                       1                                      |                      u                                                   |                        ad
Version: 1, Version Date: 30/07/2021
                                                                                                                                                                                                                                                                                                                          Page 58 of 135
Log in to download the original file

2021-09-13 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.