Skip to the record
Every meeting, every word.

Original source · versioned page text

2021-09-13 General Committee Meeting Agenda

of 135

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                 13 SEPTEMBER 2021


The pertinent issues arising out of the assessment are discussed below:

Criteria                   Planning Scheme            Proposal                               Complies
Site Area combined         n/a                        2539m²                                 
Gross floor area or        0.8:1 up to 2000m² and     1515m2 - residential                   
Plot ratio                 0.3:1 for balance           198 m2– commercial                    
                           Total = 1761.7 m² max      1713m² - Total                         


Site cover                 No Acceptable outcome      Performance outcomes                   
Building height
storeys                    2 storeys max              3 storeys in part                      x
metres                     10 metres                  8.2m                                   
Boundary setbacks
Frontage                   6 metres                   Stairs - 2.5m to stairs                X
                                                      Awnings – 4.5m,                        X
                                                      Main building - 6 metres               


Side (west)                0 metres min               2m                                     



Side (east)                0 metres min               3.5m                                   
Rear                       0 metres min               0m – gatehouse (frontage to Sidoni     X
                                                      Lane
A portion of frontage to   6 metres min
Sidoni Lane                                           0m basement (carpark frontage not      
                                                      Sidoni Lane)


                                                      5m – roof to main building to Sidoni   X
                                                      Lane
                                                      5m – roof to main building to          X
                                                      Freehold land
Length of wall             15 metres max              < 15 metres                            
Landscaped open space      10% (254m²)                19% (480m²) Soft landscaping plus      
Soft landscaping                                      61m² hard landscaping on podium        
Landscaping Setbacks                                  Total = 20% (514m²)

Private open space (for    9m2 above ground level     9.6m² - 22.2 m2                        
each unit) – above         Minimum width of 2.5m                                             
ground level
                                                      2 x 14m² areas for communal open
                                                      space on podium
Carparking                 20 covered - residential   33 covered                             
                           10 - commercial
                           12 - motorcycle            12 motorcycle                          
Bicycle Spaces             14 bicycle spaces          7 bicycle spaces + basement storage X
                                                      areas assigned to each unit
End of Trip Facilities*
*(required only where 5 + 7 locker and;               7 lockers                              
spaces are required)      2 shower cubicle with       0 shower cubicles                      X
                          ancillary change room

                                                                                        Page 86 of 135
Log in to download the original file

2021-09-13 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.