Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

001593E2.001

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

Scienta Hesse
     ee                                         errr ee eee reece cee eer eee                                           a,
        From:                      Trish Sweeney
       Sent:                       Tuesday, 3 April 2007 12:12 PM                              :
       To:                         Scienta Hesse
        Subject:                   07/481 is now properly made..........

 ;     as of 2/04/07 - 2nd owner's consent received
       Trish Sweeney
       Administrative Officer - Land Use
        Noosa Council                                                                                                             .
        Ph: 07 5449 5293 Fax: 07 5447 1062
       [email protected]

|    @                                                           |

                                                                  1
Full text of the other 25 sections

Section 2

es            NE@rOw ewe              Checklist - Applications Involving Land
                                            Development & Land Use Sections
                                            IDAS APPLICATION
          This checklist should be used for any IDAS application. Please check each of the following items before accepting an
          application at the counter.
          4.     APPLICATION FORMS                  CO                        OO                          _                 4
                 1.1.  Form’ PartA
                       1.1.1  Ensure that the form is fully completed.                                                 [7]
                       1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
                              1.4.2.1  If there are multiple owners, the consent of each qiteryreaine    a          J ule [=1
                                                      .                                 af.        .
                              4.1.2.2 — If the owner of the land is a company, either ACN No“or Company Seal required.
                 1.2.  Form1 Part B-O Supporting Information
                       1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.
                              1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed.           [7]
          2.     REFERRALINFORMATION               ©      | 2    0                                                        ES
©                2.1.  Ensure that items 1-23 have been checked and/or completed with regard to referrals.             [4
          3.     ENVIRONMENTALLY RELEVANT ACTIVITIES =                      = os               SE
                 3.1.  Ensure that Part G is completed if EPA referral is required.
                 3.2   Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
                       fee is paid and recorded on the application.
          4.     FORM 2 - REQUEST TO CHANGE APPROVAL                            Co                             2
                 4.1.  Ensure that items 1-28 have been checked and/or completed including information regarding
                       applicant details and owners consent.
          5.     PLANS      |                         —                       a                -         eo.           RL
                 5.4   Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa!    Ly¥]
                       Works) accompanies the application. In addition ensure that each set is complete.
                 5.2   Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is         [4
                       unbound.
          6.     SUPPORTING INFORMATION                   .                ..                  .                 m          Lo
                 6.4   Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration   [ -]
                       and Operational Works). If the application is accompanied by a covering letter, ensure that it is
                       capable of reproduction.
                 6.2. _ In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
          7.     FEE           °                                               oo                     oe              Oo,
                 7.1.  Ensure that the application fee, as determined from the Council's adopted scale of fees,
                       accompanies the application or has been paid.
                 7.2   Ensure that the fee which has been paid is recorded on the application form.                      |
                                 L                                                  le
           Receiving Officer  4.0.4.    GMT TT           epee             Date vo     LR&ED avs
           Having completed this form and accepted theApplication, please deliver both to the following IDAS Application Receiving
          trays:-
          e    {f the application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.
          e    {f the application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
          e    if the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
               Land Development Section.
          ¢    In all other circumstances — AOP1's desk in the Land Use Section.
           Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

          SEP! g:\ani\VYorms\application checklist.doc

Section 3

DEVON MINCHIN                            ID     8.6 7
     N6asA Shvce hore og
                     Ke      Lot /,     No08/t 4 | nee he On_{ he.
©      Py Cor firm     aD hate SPO 0 be eis o>    +e    De Ada,
       LD Lich    4 Ace kha. d —pévow Dreher               “ti?
                           .           low       mel
                                            br anf? Ar prtbrian

                                                       Lhe
                                                  i j
                                                  ~~    b
                                               cov   Received
                                              Fe   _ 4 APB 9007          |
                                              CA, NOUSASHIRE COUN IL és)
                                                 X7)          oy
                                                 Can     i
                  51 Wyuna Drive, NOOSAVILLE, QLD. 4566 AUSTRALIA
           TEL: 61 7 5474 1426 Fax: 61 7 5474 0671 EMAIL: [email protected]

Section 4

POLE
Ma 5 :
  a
  S
  >
  AY

Section 5

Trish Sweeney, 07 5449 5293
                                                             Email: [email protected]
                                                             Application Ref: 2007/481

              27 March 2007

              Viva la Body Pty Ltd                                         |
              PO Box 2374
              NOOSA HEADS QLD 4567

               Dear Sir,                                        .
©              Re:  Application for a Development Approval for a Retail Business Type 2 - Shop
                    situated at 29 David Low Way Noosa Heads described as Lot 1 BUP 7515
               Further to my phone call of 16 March if relation to the above application Council advise            .
               that it is not a properly made application, as defined by Section 3.2.1(6) of the
               Integrated Planning Act. Specifically,
               °     Written consent of all registered proprietors has not been received. (that is
                     Margaret Minchin’s signature is also required)
               Please arrange for the submission of the outstanding item such that processing of the
               application may commence.
               Yours faithfully,           ,

©              Trish Sweeney
               ADMINISTRATION OFFICER - LAND USE                                   .

                   Award Winner - Australian Clean Beach
                      Challenge 2004 Litter Prevention

Section 6

INTEGRATED PLANNING ACT 1997                      :                                                            ‘    Part A, Version 2.4, 29 May 2006
              7                      Form 1        Development Application                                                                     idas         &

                                                                                  details                                          —

         Fe
             The completion of afl applicable questions on Part A is mandatory for all appfications. Part A must be accompanied by the completed IDAS Assessment Checktist if
                 required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.qid.gov.au.
           Any information requested in the form may be provided in an attachment to the application. For further information about completing the folowing details, refer to Guide 1.
           Description of land                     1.   Street address: fnctudinghouse number, street name, suburb/ocality name & postcode) (if applicable)
         : etteemamenas
        "identified. However, a description of the land és not              A
         Cee en Roem actey EA                      2.   Name of water body or watercourse, within which the development is proposed: (f applicable)
           development is proposed within denne or                                                                        -
          watecourse.                      .       3.   Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates:
   @       seers
           ertedy alt npn design. Thee deta
           oseneionisaliaaiaaal   ents or trough 6 14   The above description is for: (tick applicable box)
           However, ifthe land on which the development is (J (the fand.on which the development is proposed; or                                   .
           PO      ee oe one neterbodor fie              (71 (i) the land adjoining the water body or watercourse, within which the development is
           watercourse) provide —                                proposed; or
           0   te   anlascrsdieiaaias                    [_] (iii) the water body or watercourse.
           a etinrfadacent ard ‘on Moreton Bay).    5.   Shop / tenancy number:         6.   Storey / level:            7.   Total area of land: (m? or ha):
           sectemmacnal                       vemmanete| [P|                                                                                                    |
           development is within a water body or ao roe                                           Zz                             ! 2 ‘3
          ES A                a porearenl aca.      8.   Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (f applicable)
           Ravaenramngrmrermeagren |                     (|
           loca! government's area unless provided for under the                       7        :
          Local Government Act 1993.                9.   Port authority for the strategic port land or strategic port land tidal area on which the
          Adtvice for completing Q9 - 09 it                                        .            .
                     oroteting i soar a                  development is proposed: (eg. Port of Brisbane, Port of Townsville} (if applicable)
           pita rommmwrireme |                           Ed
           Proposal details                         40. Existing use of the land: (eg. vacant, single house, shop etc.)
         mer ir rin ee ey                                       EAViCe                 SHOP                 PdoToeRAPHic
   ©                                                11.  Proposed use of the land: (eg. 6 unit apartment buiiding, 30 lot residential subdivision, ERA for aquacutture in
.       .                                                ponds with a total area of 7 ha for which wastes are released into waters etc).
                                                                   PE      2       SH + SAro,                         - Bony             Pes Docs
           a res                                   |     pT
           Other applicable parts of Form 1         12.  Other parts of Form 1 completed as part of this application: (eg. Part D, Part I, etc)
           completed parts of Form 1. For information about
           when a part of Form 1 may apply refer to Guide 1.
           Applicant details                        13. Applicant's name:                               15.  Contact person:    —
  |       Sa eee) rere toomertelend.                       VIVA        CA      Boeoy           Pm)              [Lmicco          saginaski
           When signing and lodging this application 14. Contact number:                                16.  Facsimile number/e-mail address:
           ifomaion prodded conect The asess                                                                  [micke Dv iWalybudys&
            information provided is correct. The assessment        6                                                       Et        a     Pod           vey
            manager, any referral agency & the Chief Executive                 .                                         :                                :
   .       (where appacetey) wf rely on this information when | 17. Postal address:
             th aguacantieacommagy cori   peren           [Po @cxy                      23 7¥                Noosa           HeAd                   6
           Fieatcanteacomaansacoet
           must be stown.                           448. Signature,                                                    49.  Date: -
                                                      | fi

Section 7

INTEGRATED PLANNING ACT 1997                                                                                                 Part A, Version 2.4, 29 May 2006
         Land owner's consent (if applicable)        20.   Land owner's consent to the making of this application:
         seinen,                                | [nme                                   |                                 ste                      te
         application must contain, or be supported by, the                                                            Signature                      Date
         writen consent of We land ownors the sppicaion      @           )                                  VF                      }                                     .
         fi) a materi change of use;                         a     2G).             Ali cf           AL BLL                  rn Aree.             LATS
         fae        cage ce                                   "2                   INCH                Ob                phe                     Js
         in     :                                                                                              O   ES /      .      j
         (@). work on land below high-water mark & not within a (ii)
            ‘canal as defined under the Coastal Protection and            cece cece ee ee cee cesee dbo c cee nese sce cerenc eee e nero ee      eeeepeseeceeeeneee
             Management Act 1995,0r                           aoe
         fiv) work on rail corridor fand defined under the  (iti)
            Transport Infrastructure Act 1994.              oe ee               eee cece enw ne eee eben ee eee nee eee ene e ee ee ence ene eb enn nen ne eeees
          Section 3.8.1(2)(a) of the !PA provides that
          landowners consent is not required for a mobile or {iv)
          For more information refer to Guide 1              (v)
          Resource entitlement (if applicable) -      21.  Does this application involve a State resource prescribed under a regulation (other than involving
         Section 3.2.1(5) of the IPA requires evidence of  quany material on State coastal land under the Coastal Protection and Management Act 1995)?
          resource entitlement be given for applications that WN
         involve a prescribed State resource.                  NO - go to. Q24                       (J YES - goto Q22
          Se Me Bionta be prpoty mode              |  22.  This application is accompanied by evidence: (tick applicable box)
          vee of the mou           uemen                   10)      of the allocation of, or entitlement to, the resource - attach evidence and go to Q23{u)
          Refer to schedule 10 of the integrated Planning - (1 (ii) the chief executive of the department administering the resource is satisfied the
          rocuired by the State in at the  todging ofthis           development is consistent with an allocation of, or entitlement to, the resource          -go
          Regulation 1998 that prescribes the nature of evidence                           H        7               H            :                          _
          development application.                                                                                                              /
                                                       "(1 (ill) the chief executive of the department administering the resource is satisfied the              @
                                                                    development application may proceed in the absence of an allocation of, or
                                                                    entitlement to, the resource — go to Q23                                                           :
         Advice for completing 023       _          | 23,  Evidence of the resource entitlement
         Tre information | OGiame es |                     (i)   Resource entitlement / authority    details             (vii) Official stamp of the department
          The official stamp of the Department of Natural                                                                    administering the resource (if
         Resources, Mines and Water is mandatory where the  -                                                                       He,
          application involves any water or riverine quarry (i)  Name of delegated officer
          material under the Wafer Act 2000. [TT
          Section 3.2.1(5A) allows the resource manager to kit                                          .
               oa ben      moos bre vite   i)              (iii) Position of “eet       officer
          the time the evidence may be used. (vi) must be    7        iti
                           ;                              (iv)    r nature of ~~ gated officer
                                                            (v)   Date        ’
               .                                            (vi)  pet date of evidence —
           Assessment triggers                     _   ]24. 4s We IDAS Assessment Checklist completed and attached to this application?
         Hagia ; 1          Oe      roe romeak it            AW] YES                     Oo NO - the assessment manager may refuse to accept this application on the
          must be complated for all other applications.                                            grounds that the application has not been property made
           Plans / drawings / reports                  25.  Plans/drawings/reports accompanying this application:
           rane                                                     Pan    ren       Report Number
           manager, referral agencies and any person viewing   .                                     .
          the application during public sorutiny or public   (i)    io (          fren
          notification to undeestand the scope of the proposal own nee eh AW 2    beeen cnet ee ne nn nn nne Porno sconce ncn nrce sence ncn ccs cs
   ;       and any potential impact.                           (ii)
.         '                                                  (iii)         ,
                                                      /     |  (iv)                                                             .          ee
           PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
                              and any other relevant part of Form 1.
             ee
      '    OFFICE USE ONLY (applicable to assessment manager's)
            FEM                                               16/3 (27        |e PS Lacon, | womens                                                   (7/68
                                               DATE                             RECEIVING OFFICER'S                             REFERENCE
                                                     Notification of Engagement of Private Certifier (Optional forma k)
            To                                                       Council. I have been engaged ass the private certifier for the building work referred to in this application.
            Date of engagement:   /    '   Accreditation Number:                   ___Name:                               Signature:

Section 8

INTEGRATED PLANNING ACT 1997                                                                                  Part D, Version 2.0, 4 October 2004
         :                  Form 1 Development Application                                                                            idas

                              Material change                                         ofuse                              ~~
    .             assessable against a local government’s planning scheme                                                        |         :

                                                                     LT
                           Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a
                                    material change of use (MCU) assessable against a local govemmments planning scheme.
       Nature of the application            1.   This application is for. (tick 1 or both if applicable}
       A development permit authorises             (J Pretiminary approval for a materia! change of use of premises including conceptual!
      serra 3 top hte apo proves                       design for any associated works that require approval under the planning scheme (ie.
      and does not authorise development to occur. ___ consideration of the proposal concep!)
                                                   AND/OR
                                                   M Development permit for a material change of use of premises including conceptual
@                                                     _design for any associated works that require approval under the planning scheme.
       The subject'tand                     2.   How the subject land is identified in the planning scheme (name the zone, precinct etc.)
       srieainindestmee’ |
       the planning scheme against which the
       appfication will be assessed.
                                            4.   Are there any existing easements on the land?                                       .
                                                      NO
                                                   (11 YES - attach plans of the location and details of the purpose of the easement
       Material change of use details       5.   Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
                                                vacant land fo industry (tyre manufacturing) etc.}
                                                    Eevicg           thee      PHoro       TO          F4ee 2           SHOP SAN

       Associated building works details (if |g  Site cover.   fo]
@ applicable}                                           a                                                                 N
    Fen inet             eae                                         oo
      area’ and “storey” go to the planrting scheme 9. Gross floor area:                                                          A
           acre emsimea                     N19, Numberotonsiecarpaningspaces:             [id
                we         con  wil
                                            11.  Number of storeys / maximum height above natural ground: [
             ae                             12   Wunberotenpiyes             [Td
         4          4           <3                                                                                                                    .
     27         REND              CA        [13  Howsanddaystieusewilopate                (id
    __Assocjated operational works 'detajis | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc f
    Se                                          CC —CCOCCC“‘“WN YS
      >       el, AND USE         RS
       “>                                          |              PLEASE NOTE
            e}               w       This application cannot be accepted unless accompanied by Part A of Form 1.
          Thea    esshtent   €nager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
                                               requested by Part A and any other relevant part of Form 1.
       OFFICE USE ONLY (eppiicabie to assessment manager)
                                                           |    REFERENCE       |
           DATE RECEIVED                                         NUMBERIS                                                                        !

Section 9

INTEGRATED PLANNING ACT 1997                                                                                      IDAS Assessment Checklist, Version 19.0, 2 March 2007

                                                  Form         1   Development Application                                                                                        idas
                                                                                                                          4

                                                                                     Checklist
                                                                                      (Formerly the “Referrals Checklist”)
                   IMPORTANT NOTE FOR ALL APPLICANTS:
                   1.    This checklist was formerty referred to as the “Referrals Checklist". Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
                         “Referrals Checklist’. The name of this checklist was changed from 25 Juty 2005 to more accurately describe its function.
                   2.    Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmentat Protection           .
                         Agency, Dept. of Natural Resources and Water, Queensland Heritage Counct etc.).
                   3.    This checklist is provided to assist applicants to determine when an application requires assessment by a Queenstand State entity and may also assist the applicant to
                         determine the assessment manager’ for the application.                                                                                                                /
                   4.    Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (ether than those requiring the completion of Parts A & 8 only).
                   5. _ Itis the responsibitity of the applicant to accurately complete this checklist.
                  6.     Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
                   7.    Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
                   8.    The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
                         any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
                         application triggers referral coordination?
                   9.    To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.qov.au. Guide 25 explains the role of the IDAS
                         Assessment Checklist in the [DAS application process, and its relationship to the Form 1 development application.
                   10.   Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
                        www ipa.qld.gov.au.                  .
                   11.   Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

                                                   SECTION 1 - STATE ASSESSMENT (completion mandatory)
                   Note:  The following state assessment triggers apply to devetopment other than for building work assessable against the Building Regulation 2006.
                   Environmentally relevant activity             1.    The application involves: (tick applicable box/es)
                  _ FOr more information refer to Guide 4,             (1) (i)   an environmentally relevant activity (ERA) for which a code for environmental compliance
                   Unless you answered ‘none of the above” to Q1,                has not been made - complete Part G of Form 1                     :
                   the application requires assessment by the  |            7           ~                                 .                    .                    .
                   administering authority’.                           (1 (ii)  a mobile or temporary ERA for which a code of environmental compliance has not been
                   If an entity, other than the administering                    Made - complete Part G of Form 1
                   authority, is the assessment manager for the             (iii) none of the above
    ©              application, the administering authority is a
                   concurrence agency for the application in relation
                   to this matter.                                                                                  ;                                      .
                   Note: An application involving ERA 19 and/or 20
                   will also require completion of Part Ky af Farm 1
.                  for approval where an allocation under the Water                                                                                    .
                   Act 2000 is required.
                                                                                                                                                                             Continued overleaf

                         PLEASE NOTE:            The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
                                                                        completed IDAS Assessment Checklist (if applicabte).
                   OFFICE USE ONLY (appiicable to assessment manager)                                                                                                       .
                        DATE RECEIVED                                              |    REFERENCE NUMBERI/S              |                                                          .

                  1   The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application Is prescribed in schedule 8A of the IPA.
                  2   For additional information refer to Guide 6 ‘Does my application trigger the referral coordination procass?’
                  3   Tha ‘administering authority’ may be elther the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary Industries and
                      Fisheries (for a delegated ERA).
                                                                                                          Page 1

Section 10

.  INTEGRATED PLANNING ACT 1997                                                                         IDAS Assessment Checklist, Version 19.0, 2 March 2007
                  State-controlled road matters            2.   The application involves: (tick appicable box/es)
                  TR MONE ISTE SE EE      Cadets                [1 (i)   development on land contiguous’ to a State controlled road and for -
                  Unless you answered “none of the above" to Q2,                       .                                   .             .
                  the application triggers referral to the Department    (C1 (a) material change of use assessable against the planning scheme;
                 of Main Roads (DMR) as a referral agency.               C1 (b) reconfiguring a jot unless -
                  In certain circumstances OMR wilt be an advice                                            :     .         .
                  agency, while in other circumstances DMR will                 « the total number of lots is not increased; and
                  be a concurrence agency.                                      + the total number of lots abutting the State-controlled road is not increased:
                 - Schedule 2 of ihe IP Regulation will assist you to                   :                      :     ‘          .                              :
                  determine where DMR is an advice or                    EF] {c) operational work (not associated with a material change of use assessable against the
                  concurtence agency for the application.                        planning scheme or reconfiguring a lot mentioned in (b) above)-
                                                                                * associated with access to a State-controlled road; or
                                                                                « for filling of excavation: or
                                                                                * involving the redirection or intensification of site stormwater from the land, through a
                                                                                   pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                                   State-controlled road.
                                                                LC  (ii) development on land not contiguous to a State-controlled road and -
                                                                         (J (a) material change of use -
                                                                               » assessable against the local government's planning scheme; and
                                                                               * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
.                                                                                 that schedule;
                                                                         (J (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
                                                                                 and exceeding the thresholds set by that schedule:                                    @
                                                                         LJ {c)  operational work (not associated with a material change of use assessable against the          '
                                                                                 planning scheme or reconfiguring a lot mentioned in (b) above}—
                                                                               ¢ assessable against the local government's planning scheme; and
                                                                               « mentioned in schedute 5 of the IP Regulation and exceeding the thresholds set by
                                                                                  that schedule.
                                                                    (iii) none of the above
                  Clearing vegetation                      3.   The application involves: (tick applicable boxes)
                  Fox more information refer to Guide 12.       q (i) material change of use—
                  Unless you answered “none of the above” to Q3,                               .             :            .
                  the application requires assessment by the              (a)  assessable against the planning scheme;
                  Department of Natural Resources and Water                                  ining —
                  (NRW).                                                  (b) on alot containing         /
                  If an agency other than NRWis the assessment                 ¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
                  manager for the application, NRW is a ;                      + if there is no property map of assessable vegetation for the lot - remnant vegetation;
                 rothis matter     forthe application in relation         (c)  where the existing use of the land is a rural or environmental use; and
                  if you ticked 3(i) or (i), your application requires    (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
                  referral to NRW for assessment regardless of  0 ti)     reconfiguring a lot—                                                  .
                  whether vegetation clearing is proposed or noi.           :                .,
                                                                         (a)  on alot containing a category 1, 2 or 3 area shown on a property map of
                                                                           -  assessable vegetation or, if there is no property map of assessable vegetation for
                                                                              the lot, remnant vegetation;                                                             ©
                                                                          (b}  where the size of the lot before the reconfiguration is 2 hectares or larger:
                                                                          (c}  where 2 or more lots are created; and
                                                                         (d)   where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                                (J (iii)  operational work -
                                                                         (a)   for the clearing of native vegetation where the vegetation clearing is made
                                                                               assessable under Schedule 8 of the IPA; and
                                                                         (b)   not associated with a material change of use assessable against the planning
                                                                               scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
                                                                               Form 1
                                                                    {iv) none of the above.
                  Strategic port land                     4.   The application involves:
                  he vated) te. a to     are vis                (1 (i) development on strategic port tand as defined in the Transport Infrastructure Act 1994 (T|
                  you tis   i) - ihe relevant uthority is the
                  4       nt manager for the application.              Act) - complete Part | of Form 1
                  If you ticked (ji} Queensland Transport is a  [1 {ii) a material change of use that is inconsistent with the land use plan approved under the
                 concurrence agency for the application.               Ti Act for the strategic port land - complete Part | of Form 1
                                                                   {iii) none of the above

                 4  Land contiguous to a State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlied toad; or that is part of a future State-
                    controlled road.
                                                                                              Page 2

Section 11

INTEGRATED PLANNING ACT 1997                                                                               IDAS Assessment Checklist, Version 19.0, 2 March 2007
 Acid sulfate soils                         5.    The application involves development on land situated in an identified’ local government area
 For more information refer to Guide 10.          and where the surface of the land is: (tick applicable box)
 Unless you answered “none of the above’ to 05,   (J (i)  below 20m AHDS and the development will involve the excavation of 1000m}3 or more of
 Ce        raat ot Natal Recomeee ano Water                  il or   sediment at or below 5m  AHD
De        1       ai Resources and W                      soil or sediment at or    below   5m      OF
 (NRW).                                           CJ (ii)Vat or below 5m AHD and the development will invotve filling the site with 1000m? or more
 If an agency other than NRW is the assessment            of materiat
 manager for tha application, NRW is an advice         a
 agency for the application in relation to this       {iii} none of the above
matter.                                                                                                                                                       ‘
  Major hazard facilities or possible       6.    Does     Me application involve a material change of use for a major hazard facility or possible
  major hazard facilities                         maigt hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
  For more information refer to Guide 17.             NO
  If you answered "YES" to 06, the application
  requires assessment by the Department of        (2 YES - complete Part L of Form 1
 Emergency Services (DES).
  If an agency other than DES is the assessment
  Manager for the application, DES is a
  concurrence agency for the apptication in
  relation to this matter.
  Water related development under the       |7.   The application involves:                                                                  .
  Water Act 2000                                  (1 (i)   operational work, for taking or interfering with water under the Water Act 2000, that is:
  For mare information about items {a} - (f), refer        (tick applicable box/es}
  to Guide 15. For more information about item                      .                               .                    Mee fee                .         ;
  (g), refer to Guide 14 Qoes my appiication               O (a)    in a watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-direction, weir or
  involve assessment of a referable dam?                            dam) - complete Part Kz, Ks, Ka, Ke, of Ka of Form 1 whichever is applicable;
  Unless you answered “none of the above" to Q7,           (Z (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
  the application requires assessment by the                                    .
  Department of Natural Resources and Water                         Kr of Form 1;
  {NRW}.                                                   (J (c)   for a subartesian bore, in declared subartesian area’, or in a certain area covered
  If an agency other than NRW is the assessment                     by a water resource plan, for use for purposes other than stock and/or domestic
 manager for the application, NRW is a                              use        lete Part K; of Form 1:
  concurrence agency for the application in                              ~ complete  Pan A: OF rorm 1, .
  relation to this matter.                                 [J (d)   for a subartesian bore, in certain declared subartesian areas, for use for stock
                                                                    and/or domestic purposes - complete Part K: of Form 1;
                                                           (-] {e)  for taking overland flow water in certain areas covered by a water resource plan
                                                                    - complete Part Ks of Form 1;
                                                           [] (f)   for interfering with overland flow water in a drainage and embankment area -
                                                                    complete Part Ks of Form 7
                              .                            [-] (g)  for constructing a referable damé or works that will increase the storage capacity
                                                                    of a referable dam by more than 10% - complete Part Ks of Form 1; OF
                                                      {ii} none of the above.
  Removal of quarry material froma           |8.  Does the application involve development for the removal of quarry material from a watercourse?
 watercourse                                      requiring an allocation notice under the Water Act 2000?
  For more information refer to Guide 16.              NO
  [f you answered “YES” to Q8, the application
  requires assessment by the Department of         (J YES - complete Parts Ky and G of Form 4
  Natural Resources and Water (NRW).
  if an agency other than NRW is the assessment                                                                                      ‘
  manager for the application, NRW is a
  concurrence agency for the application in
  selation to this matter.
  Note: Part G of Form 7 is required to be
  completed as the activity of removing quarry
  material from a watercourse is also an
  Environmentally Relevant Activity (ERA).

 5 The identified local goverment areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Calms, Calllope, Caloundra, Cardwell, Carpentaria, Cook,
    Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
    Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
 6 Austrafian Height Datum (AHO).
 7   The dectared ground water areas are listed in Guide 13 Development in a declared catchment area.
 8   Referable dam Is defined under the Water Act 2000.
 9   Watercourse is defined in sch 10 of the IPA.                                                                                     :
                                                                                   Page 3

Section 12

"INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 19.0, 2 March 2007
      Operational work that is tidal work or     |9.   The application involves operational work that is: ( tick the applicable box/es)
      Mork in chastal management district |           [7] (i)   tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
      more information about prescribed tidal work in          Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
      local government tidal areas refer to Guide 24, (_] (ii) tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; OF
      Unless you answered “none of the above’ to Q9,       ve       .         wae                                oye
      the application requires assessment by ihe      C1  (iii) carried out within a coastal management district under the Coastal Act and for - complete
     Environmentat Protection Agency (EPA).                    Part M of Form 1 if any box/es (a) to (i) below are ticked.
      fan agency omer ba EPA\s te assessment                   (J {a)    constructing or installing works in a watercourse between MHWS and HAT tie.
     manager for the application, isa                                                          oe                                                       :
      concurrence agency for the application in                          other than those works in tidal water) where the development has been determined not
      relation to this matter.                                           to be assessable against the Water Act 2000 ;
      Local government is the assessment manager               (-] (b)   constructing a canal’? intended to be connected to tidal waters;
      for all prescribed tidal work.                                                :         tp:
                                                               (J (c)    constructing an artificial waterway;
                                                               [1 (4)    reclaiming land under tidal water;
                                                               (J (e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                               (J {f)    interfering with quarry material on State coastal land above high-water mark;
                                                               [J (g)    draining or allowing drainage or flow of water or other matter across State
                                                                         coastal land above high-water mark;
                                                               (J (h)    removing or interfering with coastal dunes on land, other than State coastal land,
                                                                         that is in an erosion prone area and above high-water mark;
                                                               LJ (i)    constructing a bank or bund wail to establish a ponded pasture on land, other             @
                                                                         than State coastal jand, above high-water mark; or
                                                          (iv) none of the above,
      Operational work below high water       | 10.    The application involves operational work that is: { tick the applicable box/es)
      ma      information refer to Guide 18. For       (J (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
      more information about prescribed tidal work in          Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
      local government tidal areas refer to Guide 24.  ["] (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1: or
      Q10, ihe application triggers referral to         J (iii) carried out within a coastal management district'5 under the Coastal Act and for -
      Unless   you answered “none of the above" to          5      .         ae                               se
      Queensland Transport (QT) (Maritime Safety                          i     i                   :             j               Fal in ti         _
      Qld) as a concurrence agency.                              J (a)   disposing of dredge spoil or other solid waste material in tidal water       complete Part
                      ,                                                  M of Form 7;         :                                                                 .
      Local government is the assessment manager .                               :
      for ail prescribed tidal work.                           (_] (b)   reclaiming land under tidal water ~ complete Part M of Form 1; oF
                                                               [1 {c)    constructing a canal’, if the canal is associated with reconfiguring a lot - complete
 .                                                                       Part M of Form 7;
                                                           iv}   none of the above.
      Coastal management                         11.  The application involves: (tick the applicable box/es)
      For more information refer to Guide 18.         LJ{i)      amateriaf change of use assessable under a planning scheme involving operational
      Untess you answered “none of the above" to                           ;                              i                             jetrieti5
      O11, the application requires assessment by the      ;   work carried out completely or partly in a coastal management district
      Environmental Protection Agency (EPA).          CJ (ii)    a material change of use assessable under a planning scheme involving building                    ©
      (fan agency other than EPA is the assessment               work, carried out completely or partly in a coastal management district that is -
      coneurtenes oerey or the application in                    + the construction of a new premises with a GFA" of at least 1000m?                .
             f for the  apptication, EPA i                                       :                  :     .
      relation to this matter.                                   « the enlargement of the GFA of existing premises by more than 1000m?
                                                      CL] (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
            .                                                   completely or partly in a coastal management district
                                                      (CJ (iv)  reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
                                                                the construction of a canal'2 - complete Part M of Form 1
                                                          (v)   none of the above

     10 Tidal work is defined in sch 10 of the IPA.
     11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
     12 Canal means canal as defined under the Coastal Protection and Management Act 1995
     13 Tidal work is defined in sch 10 of the IPA.
     14 Prescribed tidal work is defined in the Coastat Protection and Management Regulation 2003 and includes certain tidal works completely or party within a focal government tidal area.
     15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area dectared as a
        coastal management district under section 47(2) of that Act.
     16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to caiculated GFA, go to the planning scheme against which the application is being assessed. .
     17 Under s117 of the Coastat Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, Must be
        accompanied by the application for the operational works to Construct the artificial waterway.
                                                                                      Page 4

Section 13

INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 19.0, 2 March 2007
              Development within the limits ofa            12.  Doesthe application invotve development below high water mark'8 and within the limits of a port
              port                                              ungér the Transport Infrastructure Act 1994?
             For more information refer to Guide 18. For             NO
             information about prescribed tidal work refer to
             Guide 24.                                          1 YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work
              If you answered “YES" to Q12, the appiication
             triggers referral to the Port Authority.
              The Port Authority is a concurrence agency i the
             development is —
              © within 200m of a shipping channel or an entry
                and axil shipping corridor for the port
              ¢ within 1000m of a swing basin, a commercial               .
                shipping wharf, a mooring, anchorage or Spoil                                                      .
               grounds;                                                                                                                                                .
              ¢ within 1000m of a planned port facility                                                                                                          .
                 identified in a land use plan approved under
                the Transport Infrastructure Act 1994.
              In ail other situation the Port Authority is an
              advice agency.                                                                                                                 .                  .
              Marinas                                      13.   Does the application involve operational work that is tidal work for a marina’$ with more than 6
              For mare information refer to Guide 18. For        vesg¢i  berths?
              information about whether a marina is prescribed  *
              tidal work refer to Guide 24. The local                 NO
              government is the assessment manager for al        (71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work =~
              prescribed tidat work.
              If you answered “YES’ to Q13, the application                                       :
              tiggers referral to Queensland Fire and Rescue
              Service as an advice agency.
              Tidal works in strategic port land tidal;    14.   Does   the application invoive tidal works within a strategic port land tidal area20?
              areas                                                   NO
              For more information refer to Guide 18.             oO  YES - complete Part M of Form 1
              Unless you answered *NO" to Q14, the relevant
              Port Authority is the assessment manager for the
              application and the Environmental Protection
              Agency (EPA) and Queensland Transpost {QT}
              are Concurrence agencies for the application.
             Heritage                                      15.   Does the application involve development in a heritage registered place as defined under the
              For further information refer to Guide 19.         Qugensiand Heritage Act 1992?
              If you answered "YES" to Q15, the applicatton    Ano
              triggers referral to the Queensiand Heritage
              Council as concurrence agency for the             [1 YES - complete Part C of Form 4
              application.
              Declared catchment areas                     16.   The application is in an area declared to be a catchment area under the Water Act 2000 and
              For more information, including alist of the .     involves: (tick the applicable box/es)                                                                                      ,
              declared  catchment   areas within Queensland,          .                  oe        ,                 :                                 ,
              refer to Guide 3 ae                       ;       [J (i)     reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;
              Untess you answered “none of the above" to        (J) {ii}   development assessable against the planning scheme involving the establishment or
              Q16, the application requires assessment by the              expansion of a waste water disposal system, other than a disposal system for carrying
©}            (NRW).                                                       out an environmentally relevant activity under the Environmental Protection Act 1994;
              Depariment of Natural Resources and Water                                 .                            es                    .        :            :
              If an agency other than NRW is the assessment          {ii)  none of the above                                                                  ,
              manager for the application, NRW is a
              concurrence agency for the application in                        :
              relation to this matter.

              18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
              19 Marina is defined in the Transport Operations (Maritime Pollution) Reguiation 1995.
             20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port jand.
                                                                                                    Page 5

Section 14

INTEGRATED PLANNING ACT 1997                                                                           IDAS Assessment Checklist, Version 19.0, 2 March 2007
             Contaminated land                         17.  The application involves: (tick the applicable box/es)
             Applications involving materia change of use   (J (i)   reconfiguring a lot for which all of part of the premises are -
             and/ or reconfiguring a lot may tigger this                         :         .      .
             teferrat.                                                (a)  premises mentioned in the IPA, schedule 8, part 1, table 2 -
             For more information refer to Guide 5.                      e item 5, including the exemption otherwise provided for by paragraph (d);
             Unless you answered "none of the above" to                  + item 6, including the exemption otherwise provided for by paragraph (e); or
             Q17, the application requires assessment by the             + item 7, including the exemption otherwise provided for a mining activity or petroleum
             Environmental Protection Agency (EPA). If an -                activity: or
             agency other than EPA Is the assessment                       : culty,           .                              :               .
             manager for the application, EPA will be a               (b)  in an area for which an area management advice has been given for unexploded
             concurrence agency for the application in                     ordnance - complete Part N of Form 1
             relation to this matter.                            .            .                        '
                                                            [| (ii)  a material change of use -
                                                                      (a)  made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7: or
                                                                      (b)  assessable against the planning scheme and if all or part of the premises is in an area
                                                                           for which an area management advice has been given for unexploded ordnance -
                                                                           complete Part N of Form 1                                                             ’
                                                                (iii) none of the above                                                                       .
             Electricity infrastructure                18.  The application involves: (tick the applicable box/es)
             FOr more information refer to Schedule 2of the IP CL) (i) reconfiguring a lot where any part of the lot is -
            Unless you answered ‘none of the above" to                * subject to an easement in favour of a distribution entity or transmission entity under the
             Q18, the application triggers referral to the              Electricity Act 1994 and the easement is for a transmission grid or supply network under
  .          agency to which the easement is granted in                 that Act; or
             favour of as advice agency.                              « situated within 100m of a substation site;
                                                            LI (ii)   a material change of use, assessable against a planning scheme and not associated
                                                                      with reconfiguring a lot if -
                                                                      * any part of the premises is subject to an easement in favour of a distribution entity or
                                                                        transmission entity under the Electricity Act 1994 and the easement is for a transmission
.                                                                       grid or supply network under that Act; and
                                                                      * any structure or work that is the natural and ordinary consequence of the use is, or will be,
                                                                        tocated wholly or partly in the easement;
                                       ,                    [_] (iii) a material change of use, assessable against a planning scheme and not associated
                                                                   - with reconfiguring a lot if any part of the premises is situated within 100m of a substation
                                                                   __ Site;
                                                            [-} (iv) operational work that is filling or excavation assessable against the planning scheme,
                                                                      not associated with reconfiguring a lot, if -                                  .
                                                                     * any part of the premises is subject to an easement in favour of a distribution entity or
                                                                        transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
                                                                        the easement;
                     ‘                                      J        « the work is located wholly or partly within 10m of a substation site;
                                                                {v)  none of the above.
             Land designated for community            19.   Does the application involve development assessable against the planning scheme and on land
             infrastructure                                designated for community infrastructure?                                                                  ©
             Applications involving development on land      ye                        .             —            She                                                       -
             designated for community infrastructure may    (i)  intended to be supplied by a public sector entity; and
             trigger this referral.                         (ii) on land not owned by or on behalf of the State; and
             For more information refer to schedule 2 of the
             IP Reaulattion.                                {ii} other than development -
             If you answered “YES” to Q19, the application      {a)  for the designated purpose; or
  :          requires assessment by the chief executive of               j                                   i
             the department acministerina the Act authorising ; fp)  carried oul by, or on behalf of, the designator.
             the development for the designated purpose.        NO
             If an agency other than the designator is the
            assessmeni manager for the application, the     O YES
            designating agency wil be a concurrence
            agency for the application in relation to this
            matier.

                                                                                           Page 6

Section 15

INTEGRATED PLANNING ACT 1997                                                                      IDAS Assessment Checklist, Version 19.0, 2 March 2007
             SEQ Regional Plan                      20.  The application involves (tick appicable box/es) -
             For more information refer to schedute 2 of the [-] (i) a material change of use of premises -                  .
             HE Beaviaion                                          (a)   in a Major Development Area in the Urban Footprint for -
            Refer to Chapler 2, part 5A and schedute 10 of                      i           pment
             the Integrated Planning Act 1997, and schedute             C1   (i)   anurban activity -
                                —       rf                                            ;          .        .                                       .
             2 o the Regualory Provisions for relevant                          (1    _sinan area included in a structure plan where the IPA, section 3.1.6
             Unless you answered ‘none of the above" fo                               applies;
            020, ine spelicaton requires ecment by the                          (1    in an area not included in a structure plan where -
             Office of Urban Management  .                                                          .             .             1                   .
                        n  Manenemnat} (OUM)                                         e the IPA, section 3.1.6 applies to the application for the material change
                                 .                                                      of use; or
                                                                                     « the premises exceeds 10,000m2; or
                                                                                     e the gross floor area (GFA) on the premises will exceed 10,000m2; or
                                                                                     e impact assessment is required under the relevant planning scheme
                                                                        LJ   (ii)  intensive animal husbandry, or
                                                                        C1   (iti) residential development involving a rural residential purpose
                                                                    {b) in the Regional Landscape and Rural Production Area for -                             mo,
    .                                                                   (1)   (i)  anurban activity and not specified in section 2.4(2); or
                                                                        C)    (ii) residential development involving a rural residential purpose and not
                                                                             -     specified in section 2.6(2)
@                   ;                                                 (c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
                                                                      (d) in the Investigation Area for -
                                                                        C3   (i)  anurban activity and not specified in section 2.10(2);
                                                                        (]   (i)   residential development involving a rural residential purpose and not
                                                                             specified in section 2.12(2); or
                                                                        L)   (ii)  intensive animal husbandry
                                                          C1     (ii) reconfiguring a fot-
                                      .                            On land in a Major Development Area in the Urban Footprint that is:
                                                                      (a)  not included in a structure plan; and
                                                          d           {b}  not specified in section 3.1(2).
                                                                 (iii) none of the above
             Fisheries matters                       21.  The application involves: {tick the applicable box/es)
            For more information refer to schedule 2of the (P (1) (i) an assessable material change of use for aquaculture - complete Part O: of Form 1;
             Requiation.                                       vs                      .                .               .       we                       .
             Unless you answered “none of the abave" to   CJ {ii)  assessable operational work that is the construction or raising of a waterway barrier -
             Q21, the application requires assessment by the       complete Part Os of Form 1,
            Paper cron of Primary indusiies and Fisheles  C1 (iii)  assessable operational work completely or partly within a declared fish habitat area-
             (fan agency other than DPI&F is the assessment        complete PartOz of Form 1,
            manager for the application, DPI&F is a       [_] {iv} assessable operational work that is the removal, destruction or damage of a marine
             concurrence agency for the application in             plant - complete Part O2 of Form 1;
             telation to items (i) - (iv) and an advice agency                                    '
             in relation to item (v).                     [_]   (¥) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
                                                                   declared fish habitat area;
                                                              (vi) none of the above.                                   ,                          ;

                                                                                        Page 7

Section 16

INTEGRATED PLANNING ACT 1997                                                                    IDAS Assessment Checklist, Version 19.0, 2 March 2007
  Integration of land use and public     22.  The application involves: (tick the applicable box/es}—
  ranspo ration refer to Guide 23, schedute     1] (i) a material change of use assessable against the planning scheme for a purpose
 8A of ihe IPA, & schedule 2 of ihe IP Requlation.    mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
  Unless you answered "none of the above’, the        schedule.                                                                    ‘
  application triggers referral to QT as a                                        ,
  concurrence agency.                         L) (ii) reconfiguring a lot~
                                                       (J (a)    on tand that is completely or partly within a public transport corridor, and the
                                                                 total number of lots increases;
                                                       [1 (b)    on land that is completely or partly within a future public transport corridor or
                                                                 an airport's public safety area;
                                                       [J (c)    on land that is within 400m of a public passenger transport facility or a future
                                                                 public passenger transport facility, and the total site area is 5000m:? or greater;
:                                                      [J (d)    for a residential purpose within the 25 ANEF contour for an airport;
                                                       [1 (e)    for aresidential purpose resulting in 100 or more allotments,
                                              ( (iii) operational work assessable against the planning scheme, but not associated with a
                                                      material change of use mentioned in (i) above or reconfiguring a lot mentioned in {ii)
                                                      above, on land that—
                                                       [J (a)    is completely or partly within a public transport corridor or a future public
                                                                 transport corridor;
                                              d,       [7] (b)   will result in work that encroaches into an airport's operational airspace.
                                         :        {iv) none of the above.                                                                        @
  Railway safety and efficiency          23.  The application involves: (tick the applicable box/es)—
  aoe IPe backed     2h         sormoule      [1 (i) a material change of use assessable against the planning scheme for a purpose
                   :       ——e—en                     mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
  Unless you answered “none of the above", the
  application triggers referral to QT as a            schedule.
  concurrence agency.                         [| (ii) reconfiguring a lot—
                                                       [] (a)    on tand that is completely or partly within a future public transport corridor,          ‘
                                                                 future railway land or a railway tunnel easement;
                                                       [J {b)    on land that is within 400m of a Citytrain passenger railway station or a future
                                                                 Citytrain passenger railway station, and the total site area is 5000m? or
                                                                 greater;
                                                       (J (c) — onland that abuts rail corridor land, commercial corridor land or future railway
                                                                 land, and the total number of lots increases;
                                                       [1 (4)    on tand that abuts rail corridor land, commercial corridor land or future railway
                                                                 land and an easement abutting the corridor or future railway land is created;
          ;                                            (J (e)    on land that is completely or partly within 100m of, and abutting an approach
                                                                 to, a railway level crossing, and the total number of lots increases;
                                                       [_](f)    for a residential purpose resulting in 100 or more allotments.                   :
                                              L_] {iii) operational work assessable against the planning scheme, but not associated with a
     .              .                                material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)     ©
                                                     above, involving extracting, excavating or filling greater than 50m, on land that—
                                                       L (a)     is completely or partly within rail corridor land or commercial corridor land, and
                                                                 the work is not for rail transport infrastructure or other rail infrastructure;
               .                                       (_] (b)   is completely or partly within future railway land, or a railway tunnel easement:
                                                       {](c)     abuts rail corridor land, commercial corridor land or future railway land, and
                                              A                  the work is within 25m of the railway boundary.                                    ,
                                                  {iv) none of the above.
 Moonie to Brisbane pipeline            24.  The application involves the easement for the construction or operation of the Moonie to
 For more information refer to schedule 2o! the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
 Begeicien        .              .            (_] (i) a material change of use assessable against the planning scheme and not associated
 apnicaton (ingen wtehal tothe hover of              with reconfiguring a lot, and any structure or work will be located wholly or partly in the
 pipeline licence No 1 issued under the Petroleum    easement.
 Act 1923, currently Santos QNT Pty Ltd, for    | (ii) reconfiguring alot
                                               J (iii) operational work assessable against the planning scheme, that is filling, excavation,
                                                     compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
                                               dh    work is located wholly or partly in the easement.
                                                  (iv) none of the above.

                                                      .                    Page 8                                     ,

Section 17

INTEGRATED PLANNING ACT 1997                                                                     (DAS Assessment Checklist, Version 19.0, 2 March 2007
              Koala habitat area                    25. The application involves: (tick the applicable box/es)—
              slate Potte  b Reaiatiene                   (] (i) a material change of use of premises in a koala conservation area or koala
              Untess you answered “none of the above", the        sustainability area made assessable under a planning scheme, that 1s not for a domestic
              appiication requires referral to the Envsonmental   activity and will result in —
             Protection Agency as a concurrence agency.            (J (a)  clearing of native vegetation over an area greater than 2500m?;
                                                                   [4 (b) anew building and any reasonably associated structure with a total footprint
                                                                           greater than 1000m2;
                                                                 _ CJ) an extension to an existing building and any reasonably associated structure if
                                                                           the extension has a total footprint greater than 1000m2;
                                                                   [1 (a) extracting gravel, rock or sand from an area greater than 5000m?;
                                                                   CJ (e) excavating or filling an area greater than 5000m?;
                                                                   L_] (f} additional traffic in a koala conservation area or koala sustainability area,
                                   .             :                         between 6p.m. on a day and 6a.m. on the following day.
                                                          (J (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
                                                                   result in —
                                            :                      [J] (a) anincreased number of lots;
                                                                   [_} (b) clearing of native vegetation over an area greater than 2500m?.
                                                        . (J (ili) operational work in a koala conservation area or koala sustainability area made
                                                                   assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
                                                                   reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
 ©                                                                 over an area greater than 2500m?.
                                                          (J {iv) operational work in a koala conservation area or koala sustainability area made
:                                                                  assessable under a planning scheme (not associated with a material change of use
                                                                   mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
                                                                   and will result in —
                            °                                      LJ (a)   clearing of native vegetation over an area greater than 2500m?;
                                                                   J (b) extracting gravel, rock or sand from an area greater than 5000m2;
                                                           f,      (J (c) excavating or filling an area greater than 5000m?.
                                                              {v) none of the above.
              Wild river area                        26.  Does    the application involve development in a wild river area declared under the Wild Rivers Act
              For more information, refer to Guide 27     2007                                                                :
              If you answered YES to Q26, you must also        NO
              complete section 2 of this checklist. This will
              enable you to determine if your application can (J YES
              proceed in a wild siver area and which referral
              agency will assess your application against the
              Wild Rivers Code, or if the proposed
              development is “prohibited” in a wild river area.
              Note: Development can be ‘prohibited’ in a wild        .
              fiver area because the application canno! be
              accepted by the assessment manager.
 @            Referral coordination                  27.  Doeshe application trigger referral coordination?
              An information request requires referral     [4NO
              coordination if the application involves -                         oo
                (i) 3 or more concurrence agencies; or     1 YES, as the application: (tick the applicable box/es)
                {ii) a facility or area assessable under a              .     :                                 a
                    planning scheme and prescribed In              C1 {i)    triggers 3 or more concurrence agencies;
                 te setpmen neh tetas or                           Ci (ii)   involves a material change of use made assessable under a planning
                    application for preliminary approval                     scheme and prescribed in schedule 7 of the IP Regulation;
                    mentioned in s3.1.6 0f the PA,                 C1 (ili)  involves a material change of use (other than a dwelling house, outbuilding
              For more information go to Guide 2 and Guide 6,                or farm building) made assessable under a planning scheme, or
                                                                             reconfiguring a fot, in an area prescribed in schedule 8 of the 1P Regulation;
                                                                   (J (iv) _ is for a preliminary approval mentioned in $3.1.6 of the IPA
              Referral agency responses priorto    | 28.  Did a referral agency give a referral agency response under s3.3.2 of the IPA before the
              lodgement                                   appligation was made to the assessment manager?
              Under $3.3.2 of IPA a referral agency may give a NO                                   :
              referral agency response on a matter within its                                      :
              jurisdiction about a proposal before an      L] YES - attach a copy of the referral agency/s response/s "
              application for the proposal is made to the                                                                                                     .
              assessment manager.
              This is commonly the case where an application
              requires referral to a building referral agency (eg.
              Old Fire and Rescue Service).

                                                                                        Page 9

Section 18

~  4

                       INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 19.0, 2 March 2007
                                                                                                                                       A AsSeSSMEN NECKS, VETSION 19.0, 2 March 2007

                                           (completion mandatory if the proposed development is located in a wild river area)
                                                    a a
                       Wild River Area                              1,    Which wild river area is the development proposed in?
                       It the responsibility of the applicant to                                                                                                                                      .
                       determine if the development is proposed in
                       a wild river area.                                                                                                                   :
                       Information about wild rives areas including the   The proposed development is to be located in: (tick the applicable bowes)
                       geographical focation and position of                  .      .              .
                       management areas in relation to properties, can    [_] i) a high preservation area (HPA);
                       be accessed by contacting the Department of            .                :               .                    .                                                               .
                       Natural Resources and Water (NRW), accessing       LJ ii) @ preservation area (PA) ;
                       et te done tent ctw ai                           LJ i) a wild river floodplain management area (FMA);                                  .                     .
                       the department's website www.nrw.gid.gov.au or         ii      Id  ri             i                                .
                      wild [email protected]                          [_] iv) a wild river nominated waterway;
                       Note on Referrals                                                .
                                               a                            J v) a designated urban area (DUA).
                       Referrals for development in a wild river area
                       (other than for agricultural activities and animal
:                      husbandry activities) are nol changed from the                                                                            .
                       existing referral arrangements.                                                .
                       Notes on development assessable
                       against the Wild Rivers Code                                                                                 .
                       For information regarding development in a wild                                                                                               .
                       tiver area, See the relevant wild river dectaration
                       and Guide 27. The relevani wild river
                       declaration will provide information regarding
                       which types of development must be assessed                                                      .
       .               against the Wild Rivers Code, and in some                                                       :                                                         .
                       cases which types of development are exempt
                       from wild river requirements.
 ,                     The notes on development assessable against
                       the Wild Rivers Code in this section of the                                 ‘
                       checklist provide some guidance however this
                       May vary belween wild river areas. The relevant                                                                                                                    :
                      declaration will provide the information applying
                       to each wild river area.
 .                    Applications for same new developments will not                                        :
                       be accepted if the proposed development is in a
                       high preservation area (HPA). Most applications
                      for development activities which may be made                                                                                                ,
                       including those in a preservation area {PA), must
                       be assessed against and must comply with the
                      Wild Rivers Code where indicated in a relevant
                      wild river declaration.
                       Environmentally relevant activities          |2.   Does the proposed development only involve any of the following environmentally relevant
                      {ERAs) in a designated urban area                   activities (ERAS) in a designated urban area (as mapped in the relevant wild river declaration)?
                      if you answered YES, your application for an        .                            .
                      ERA is exempt from any wild river requirements      i) An ERA 28 or ERA 14; or                                    .
                      and provided there are no other aspects of this     ii) A level 2 ERA except ERA 1,        2, 3, 4, 20, 22 or 59.
                      development that require assessment against
                      wild rivers, you do not need to complete the        CJ NO                 [] YES (ensure you have completed Part G of Form 1)
                      remaining questions in Section 2.                                                                                                        :
                      If you answered NO to Q2, please complete the
                      remaining questions in Section 2.                                                                                                     ,
                      Clearing native vegetation                    3.    Is the application operational work for clearing native vegetation in a HPA?
                      for which an application 1o clear n ‘tive pO       EF] NO                   L] YES (ensure you have completed Part J of Form 1)
                      If YES, there are a jimiled number of purposes
                      vegetalion may be accepted in a HPA. See
                      Guide 27 for alist of relevant purposes for   |4 = [f YES, is the clearing?
                      which an application may be made In a HPA.               .       .                             .               :      .                         .       .
                        YES and you ticked 04 box i) the application     (J i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
                      may be made and is assessable against the Wild           area of agriculture in a HPA (see Guide 27); or
                      Rivers Code. If YES and you ticked Q4 box ii}            aye                .          .                    :
                      the application will nol be accepted.              [     ii) in a HPA outside a registered area of agriculture?
       :              Note: If clearing native vegetation is in a PA,                                         :
                      there are no wild siver requirements and
                      provided there are no ather aspects of this
                      development where wild river requirements                                                                                                                 :
                      apply, do not complete the remaining questions
                      in Section 2.

                                                                                                            Page 10

Section 19

INTEGRATED PLANNING ACT 1997                                                                                 IDAS Assessment Checklist, Version 19.0, 2 March 2007
             Works in tidal areas, coastal               5.   Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
             management districts and fish habitat            Development in a wild river area)
             areas
             If you answered YES to 05, and ticked any        [Jno                     Ll Yes                                                       ,
             boxes in 06), your apptication is required to be
           assessed 2 against and must comply with the Wid 16. The application is for one or more of the following:
                      e.                                           .         =                  .  .                      .                               .  *
             It you answered YES to OS and ticked box i in    C i) Operational works that is tidal works or works in a coastal management district (ensure you
             Q6, your application is required to be referred to     have completed Part M and/or Part P of Form 1); Or                            ‘
             the EPA.                                              -          .                                         .                        .
             Noe: I spectied works re proposed in alocal      (_] ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
            government area, it is prescribed tidal work - the      completed Part O2 of Form 4), OF
             sesasomtent nonager with tha EPA es 8            [1 iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
             relevant local government will be the                 Pn     tdi              :             :             5
             concurrence agency                                                .
              \f you answered YES to 05, and ticked box ii) or
             ff} in Q6, your application requires referral to
             DPIF.
             If you answered NO to QS and ticked box i) in
             Q6, the application wilt not be accepted.                                                  ‘
             if you answered NO ta Q5, ticked box ii} in Q6
             and the development is necessary to install                                                                   .
             authorised works or infrastructure where a
             development permil Is not required, or if a
             required permit is held, the applicatlon must be
             assessed against and must comply with the Wild
             Rivers Code. Applications for purposes other
             than specified works or as described above wilt
             not be accepted.
             If you answered NO at Q5 and ticked box iii) in                                                          :                                                              .
             Q6, the application may be made if the works are
             ina PA. These applications must de assessed   .                                                                                         .
             against and must comply with the Wild Rivers
             Code. The application will not be accepted if the
             development is proposed to be located in a HPA.
             For more information about specified works refer
             to Guide 27
             Residential, commercial or industrial       17.   Is the application for residential, commercial or industrial development in a designated urban
             development                                       area?
             if you answered YES to Q7, your application is
             nat subject to wild fiver requirements. Provided L] NO                    L YES
             there are no other aspects of this development
             acta ee Md Rass Cove, you do ot 8.                If NO, does the application for residential, commercial or industrial development involve:
               vi    aralian Of ¥¥ii IVErs   .
              need to comptete the remaining questions in      L_] i) a material change of use made assessable in a local government planning scheme
              Section 2      ou                                     (ensure you have completed Part D of Form 1); or
              If you answered NO lo Q7 and licked either box        .         .                    .       :              .
              i) or ii) in Q8, the assessing agency is the     CO   ii) operational works associated with reconfiguring a fot (ensure you have completed Part F
              relevant local government. The application must       of Form 1}.
              be assessed against and must comply with the
              Wild Rivers Code.
S             Animal husbandry activities                9.    Does the application involve a material change of use for animal husbandry activities (as defined
              If you answered YES to Q9 your application       under the Wild Rivers Act 2005} in a PA?
              requires assessment against and must comply
              with the Wild Rivers Code.                        [CJ No                 Cc   YES (ensure you have completed Part R of Form 1)
              The assessing agency is NRW,
              Note: Applications for animal husbandry
              activities will nol ba accepted if proposed in a
              HPA. For more details and a definition of animal
              husbandry activities see the Wild Rivers Act
              2005 and refer to Guide 27.
              Agricultural activities                     10.  Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
              If you answered YES to Q10, your application     a PA?
              requires assessment against and must compl
              win the Wild Rivers Code.            My             | NO                 LC] YES (ensure you have completed Part Q of Form 1)
              The assessing agency is NRW.
              Note: Applications for agricultural activities wil | 11. If YES is the application for.
              not be accepted if proposed in a HPA. For more        ,          :                   .
              details and a definition of agricultural activities [_Ji) a material change of use; or
              se the Wild Rivers Act 2005 and refer to Guide [] ii) operational works.
              The production of fodder in a PA, and pasture
              improvement using low impact soil disturbance
              techniques is not an agricultural activity as                                                                                                                                 .
              defined under the Wild Rivers Act 2005. For
              more information see Guide 27.

                                                                                                 Page 11

Section 20

+

          INTEGRATED PLANNING ACT 1997                                                                                   IDAS Assessment Checklist, Version 19.0, 2 March 2007
          Works that take overland flow water          |12.  Does the application involve works that take overland flow water in a HPA or an FMA?
          The relevant wild river declaration will state
          works that take overland flow water are either     [-] No                   [] YES (ensure you have completed Part Ks of Form 1)
          self assessable or assessable, or are exempt
          from wild river requirements.                13.   If YES, is the application for works stated in the relevant wild river declaration to be?
          tf you ticked Q13 i), your application must be          .
          assessed by NRW against the Wiki Rivers Code      LJ i) assessable works                 .
          ancl must comply with the code.                    [1] ii) sel-assessable works
          If you ticked Q13 ii) an application is not required    ss
          to be made however the works must comply with           iti) exempt works
          the retevant self-assessable section of the Wild
          Rivers Code, otherwise the works become
          assessable development for which an apptication
          is required and must be assessed by NRW                                                                                            .
          against the relevant pant of the Wild Rivers Code
          and must comply with the code.
          tf you ticked 013 ii} your application is not
          subject to wild river requirements.
          Applications for development that is other than
          thal stated to be assessable, self-assessable or
          exempt wil! not be accepted.
          Works that interfere with overland           14.   Does the application involve works that interfere with overland flow water in a FMA?
          flow water
          The relevant wild river declaration will state     0 NO                    U        S (ensu eyoun        plete          vant  Part K of Form 1)
                                                                                          YE         TC      ave completed the relevant Part K of Form 1
          works that interfere with overland flow water that                                                                         .              .
          are either self assessable, assessable or exempt! 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
          from wild tiver requiremenis.                      a i) assessable works
          If you ticked Q15 j}, your application must be
          assessed by NRW against the Wild Rivers Code       C ii) self-assessable works
          and must comply with the code.                         .                         .
          {f you ticked 15 ii) an application is not required C) ill} exempt works
          to be made however the works must comply with
          the relevant self-assessable section of the Wild
          Rivers Code, otherwise the works bacome
        "assessable development for which an application
          is required and must be assessed by NRW
          against the relevant part of the Wild Rivers Code
          and must comply with the code.
          If you ticked Q15 iii) your application is not
          Subject to wild river requirements.
          Applications for development that is other than -
          that stated to be assessable, self-assessable or
          exempt will not be accepted.
          Waterway barrier works                       16.  Does the application involve building or raising waterway barrier works in a PA?
          Applications for building or raising walerway
          bartier works in a HPA will not be accepted.       L] NO                   [_] YES (ensure you have completed Part Os of Form 1)
          If you answered YES to Q16, your application
          must be assessed by DPIF against ihe Wild
.         Rivers Code and must comply with the code.
          Aquaculture (non ERA)                        17.  Does the application involve aquaculture in a PA?                                                                 ©
           eee       for aquaculture in @ HPA will not be    CL] NO                 LJ YES (ensure you have completed Part O, of Form 1)
          If you answered YES to Q17, your application
          must be assessed by DPIF against the Wild
          Rivers Code and must comply with the code.
          Works that interfere with water ina       | 18.   Does the application involve operational works that interfere with water in a watercourse that is in
        watercourse                                         a nominated waterway in a PA?
          Note: If the development is proposed in a HPA,
          applications for all works that interfere with water CL] NO                ["] Yes (ensure you have completed the relevant Part K of Form 1)
          in a watercourse (including dams or weirs,
          siream realignment or stream diversion} wili not 19. IFYES
          be accepted.                                              ‘
          In a PA, applications for instream dams and       (J i) The application is for an instream dam or weir; or
          I you licked box ij ir O19, yout apolestonat’ |   C1 4) The application is for operational works that interfere with water in a watercourse, and is
          not be accepted,                                          for development other than a dam or weir.
          Note: Operational works outside a HPA or
          nominated waterway are not subject to wild
          river requirements.
          More information and locations of nominated                                             .            .
          waterways is available by contacl NRW,
          accessing the department's website
          www.nrw.qid.qov.au or contacting the
          department by email on:
        wild [email protected] 12

Section 21

INTEGRATED PLANNING ACT 1997                                                                             IDAS Assessment Checklist, Version 19.0, 2 March 2007
               Environmentally relevant activities     | 20.   Does the application involve an ERA?
               be accepted. Applications which may be made     CJ NO                   [_] YES (ensure you have completed Pat G of Form!)
               Most applications for an ERA in a HPA will not
               require referral to the EPA. The assessment of
               some ERAS is assessed by NRW, othershave / 21,  Is the application for an ERA 20 instream?                                                            .
               been devolved to DPIF, NRW or delegated
               local government (see EPA website for more        | NO                  EC] YES
               information on devolved ERAs)
              ocmete Of 21 . 10. Q20 you donot need to) 22.    Is a quarry allocation notice held for the proposed ERA 20 instream?
               If you answered YES to O20 and tha            C] NO                     CL   YES
               development is in a PA, your apptication must be
               erat ihe td adminisieing auihoriy” ‘om ey |23:  Does the application involve any of the following in a HPA?
               with the code, unless the proposal Is for       i) alevel 2 ERA 11, (and is for specified works or a residential complex
                                                                                                   p                                      p
               development where an application will not be    a                      .                    ‘
               accepted, of Is exempt from wild river          ii) an ERA 19 (dredging)
               Peer    Te ction at ot be acoopted              iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
               for the development by answering Q21 - Q24.            the Wild Rivers Act 2005, and Environmental Protection Act 1994)
               If you answered NO to 021, you do not need to   iv) an ERA 22 (out of stream)
               complete O22. If you answered YES to Q21 you
               are required to complete Q22.                   [JNO                    [_]Yes
               If you answered NO to 022, the application will
               not be accepted. If you answered YES 0.022, | 24. |s the proposed development for ERA 20       (out of  stream)  and;
               the application must be assessed by NRW             .  p FMA:     d       P                 0¢        stream) and,
              " against the Wik¢ Rivers Code and must comply   —   a         , an                                                                                        :
 ©             with the code.                                  —   not low impact; and
              If          ‘ed NO to O23 and the development                      .    :            .                         .
               is proposed in the HPA the application will obo —   not for a residential complex in the area, or for specified works.
               application must be assessed by the EPA or      O NO                    LJ YES
.              accepted. if you answered YES to Q23, the                                                                                                     :
               NRW (as prescribed in schedule BA of the IPA)
        .      against the Wild Rivers Code and must comply
               with the code.
               if you answered YES to Q24 the application wil!
               not be accepted. If you answered NO to 24,
               your application must be assessed by NRW
               against the Wild Rivers Code and must comply
               with the code.
               Exempt ERAs in a designated urban
              area                                                           :
               If the development is proposed in a designated
               urban area ihere may be no wild river
               requirements. See Section 2 Q2.
               Note: All applications that can be accepted must
               be assessed against and must comply with the                                                                    :
               Wild Rivers Code (other than exempt ERAs in a
               designated urban area).
               Documentation                      a       25.  Has documentation been included with the application describing how the applicant proposes to
               It you answered NO to Q25, your application     comply with the mandatory requirements, required outcomes, and/ or performance requirements
               may be subject to an information request and                .                        f the Wild Ri      C     >
 @             processing of the application may be delayed.   as set out in the relevant part/s of the     Wild Rivers  Code?
                                                               [Jno                    C1 yes

                           2 The administering authority may be either the EPA, or if devolved or delegated, the local government, OPIF or NRW.
                                                                                                Page 13

Section 22

INTEGRATED PLANNING ACT 1997                                                                               IDAS Assessment Checklist, Version 19.0, 2 March 2007
 eee se ES                                                                                                                                           Eee
                             SECTION 3 ~ BUILDING REFERRALS (completion not mandatory)
  Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
  Assessment Checklist is provided for advice onty.     This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
  application for building work assessable against the Building Regulation 2006 only.
  Special fire services - generally          1,    An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
  For more Information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the Integrated Planning Regulation 1998
  schedule 2A of the IP Requtlation,               (IP Regutation) or includes an alternative solution assessed against the performance requirements of the
  Assessment period 15 days. No response Is a      Building Code of Australia.
  deemed refusal,
  Fire safety for budget accommodation       {2.   An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
  For more information go to schedule 2 of the IP  the subject of the application requires the installation of a fire safety system for a budget accommodation
Regulation                                         building.
  Spray painting                             3.    An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
  For more information go to schedule 2 of the IP  if the application involves a workplace incorporating spray painting.
  Regulation                                                                                                          .
  Retail meat premises                       4.    An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
  For more information go to schedute 2 of the IP. retail meat premises.
  Regulation
  Private health facilities                  5.    An application may trigger referral to the Department of Health as a concurrence agency if the application
  For more information go to schedule 2 of the iP  involves a private health facility.
  Regulation
 Workplace area less than 2.3m?              6.    An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the ©
 For more information go to schedule 2 of the IP   application involves a work place area less that 2.3m?.
  Regulation
  Land contiguous to a State-controlled      |7.   An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
  road                                             agency if the application involves tand contiguous to a State-controlled road.
 For move information go to schedule 2 of the IP
 Requiation
  Pastoral workers accommodation             |8.   An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
 For more information go to schedule 2 of the |P   if the application involves pastoral workers accommodation.
 Reguiation
  Child care centre                          9.    An application may trigger referral to the Department of Communities as a concurrence agency if the
 For more Intormation go to schedule 2 of the IP   application involves a childcare centre.
 Regulation
 Coastal development                         10.  An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency
 For more information go to schedule 2 of the IP   if the application involves land completely or partly seaward of a coastal building line22,
 Requlation
 Heritage                                    11.  An application may trigger referral to the Heritage Council as a concurrence agency if the application
 For more information go to schedise 2 of the IP   involves a heritage registered place.
 Requiation                                                                                                                                                               .
 Fisheries matters                           12.  An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a
 For more information go to schedule 2 of the IP  concurrence agency if the application involves assessable building work in a declared fish habitat area; or
Regutalion                                        as an advice agency if the application involves assessable building work on land that adjoins a declared fish
                                                  habitat area.                                                                                                 ©
 Integration of land use and public          13.  An application may trigger referral to Queensland Transport as a concurrence agency if the application
 transport                                        involves existing or future public transport corridors, or airport operational airspace?’
 Far more Information go to schedule 2 of the iP
 Regulation
 Railway safety and efficiency               14.  An application may trigger referral to Queensland Transport as a concurrence agency if the application
 For more information go to schedule 2 of the IP  involves future railway land.
 Requlation                                                         :                                              .
  NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS
  The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
  time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
  other applications the assessment period is 15 days. if no response is received from the local government for an application, itis taken to be a deemed
  refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
  response is taken to be a deemed approval.
 Amenity and aesthetic impact of             15.  An application will trigger a referral to the local government if it is :
 particular building work for single              e   for asingte detached class 1 building or class 10 structure; and
 detached class 1 building or class 10            ¢   the local government has declared by resolution the following:
 building or structure                                —   the appearance of the building or structure will have an extremely adverse impact on the amenity of
 For mare information go to schedule 2 table 1 of the     the locality; and
IP Reguiation,                                        —   the appearance of the building or structure would be in extreme conflict with the character of the
 Assessment period 15 days. No sesponse is a              locality
 deemed approval,                                                ‘

 2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995.
    Operational airspace is as defined in State Planning Policy 102 “Development in the Vicinity of Certain Airports and Aviation Facilities’,
                                                                                   Page 14

Section 23

a           *
_f

                 INTEGRATED PLANNING ACT 1997                                                        :                     IDAS Assessment Checklist, Version 19.0, 2 March 2007
                 Whether particular buildings may be | 16.       An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
                 occupied for residential purposes               referral to the local government as the concurrence agency.
                For more information go 10 schedule 2 table 1 of the                                                    :
                iP Reautation,
                Assessment period 15 days. No response is a
                 deemed refusal.
           .     Design and siting                          17.  An application may trigger referral to the local government as the concurrence agency if the building work
                For more information go to schedule 2 table 4 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
                IP Requtation.                              18.  An application may trigger referral to the local government as the concurrence agency if the building work
                 Assessment period 5 days. No response is a      does not comply with the qualitative statement for building clearance and site cover.
                 deemed refusal                             19.  An application may trigger referral to the tocal government as the concurrence agency if the building work
                                                                 does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
                                                                 Development Code, part 14 or 12.
                 Fire safety in particular budget           20.  An application may trigger referral to the local government as the concurrence agency to determine the
                 accommodation buildings                         buitding will comply with the fire safety standard under the Building Act 1975 when the building work has
                 For more information go to schedule 2 table 1 of the been completed.
                IP Regulation.
                 Assessment period 15 days. No response Is a
                 deemed refusal.
                 Higher risk personal appearance            21.  An application may trigger referral to the local government as the concurrence agency to determine if the
                 services                                        building work                                                                    .
                 For more information go to schedule 2 table 1 of the e complies with the performance criteria of the Queensland Development code part 15; and
   ‘             IP Requlation and the QDC part 15.              «    the work does not comply with an acceptable solution stated in the part.
   ©             Assessment period 15 days. No response is a
                 deemed refusal).
                 Building work for residential service | 22.     An application for building work for premises in which residential care service under the Residential
                 For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
                IP Regulation and the QDC part 20,               referral to the local government as the concurrence agency.           :
                 Assessment period 15 days. No response is a
                 deemed refusal.                       :
                 Building work for removal or               23.  An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
                 rebuilding                                      referral to the local government as the concurrence agency.
                 For more information go to schedute 2 table 1 of the
                 IP Requtation. :
                 Assessment period 5 days. No response is a                             .                                                     .
       '         deemed refusal,
                  Building work for rainwater tank in       24.  An application may trigger referral ta the local government as the concurrence agency to determine if the
                 designated rainwater tank area                  building work or structure complies with the relevant performance criteria if -
                 For more information go to schedule 2 table 1 of the ¢ Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
                 IP Regulation and the QDC part 25.                   building work, in a designated rainwater tank area; and
                 Assessment period 15 days. No response is a      *   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
                 deemed refusal                                       solution for a relevant performance criteria.

                                                                                                  Page 15                                                                       .

Section 24

QUEENSLAND LAND REGISTRY                                    SCHEDULE                                               Form 20 Version 2
     and Water Act 2000                                                                                                       g         30
     Land Title Act 1994, Land Act 1994                                                                                    Page 30 of

                                                        Title Reference - 16961123
      wii poe Ee         cna     ”      ™                                                           nnn cam eee een                  ne
      iE
             FORM 20 vosix- i                                                                             QUEENSLAND LANG REQISTAY
             Lang Yene dos 204 al Coed Aat 194                   SCHEDULE                                          Page 31 af 31
                                                    Tite Reference - 14961123 & 18961124
                                                       PLAw 10 SE INSERTED RERE                                :
          ,                                     i A                           EE      RN                 AEN AN A
                                                         Das heiig Unites asd Grosp Tiers Act nee ~ + 9S™
                                  >                      POLY UNITS ABD GROUP VIII REVUILETIONT (SU
                                paces                                  irorm 9)           Regu) utien BCtt
                        zs                                                                drget Ko. Toot 2 gente
                       G33
                       ’ i     Bp
                        et      4                                               _         Cc
                        i 33                                   BULLOIKG WITS PLA Ky. 154 o
                           j    8                                 uve,    AL                           )                           .
                           G    oz
                          a é zt                                                                    ™ H —
                                                       y.            fo                            Seats MeO,
.                                                   Ke      b      Me      A9~         _ 4
                                              (\\     4     ©              =       *, .
                                                     “a                    yl ee       %,?
                                           AVA           KK                7         Owe ees
                                        .                      WY       My   EN (te?
                                          ~              .                S      Baa   }-7
                                                    nell   Ne         :  Sra               go
                       :                                        mt     - ee’  <,
                       t                                                v      “a
                                                                            t          A ;           /
                              as                                            5                           >
                                                                                :    B/
                                                                               k

                                                      Toye    2,                   ‘ ‘
                                                  fonact neu 2"                       v
                                                                ee                   Mm atvabted Neat He snometed pete
                                                       Bration A-b                   of tacts §$ §. 0 ge fecd (> tha stileay
                                                         feats RO.                    ght of Meo                      \
                                       FPiter nreaa are epproxinsty ont y-                                     :
                                       &        oT Rogintorved rege
                                   Z           Peon,       Oo Dnt                                                                              .
                                      Oeven George Minchin    mmrqaret Olive Ainchhy        -             wa
                                      whe Coco Ovok of PH. woenesaae Pty Ika —     SEE               wy  F <
                                      Wenat wade kee              Caicen” FO            Ba,        fe) E
                                      horeunte af fixed by antrocity ©: ean 6:          >                  ye  AY
                                                =         3             be,      «                        ba   £
                                       % Parpctos} iaty wes ot                                           Fae
                                      Piet ONE or                                                    Sasvert
          {_                                                                  NSA Flow a                                        _
                                                                       ,       BAtre Clock                                                   .
                                               ne                              EIEN     the Shige of Massa
                 ‘                                                                     TH                                        eens

Section 25

LAND USE SECTIONFEES._—                                  .
     On        NLOLO hy.        ne                                                      ee
 oo          oo            |              a                  .                      RECEIPT TYPE
  SALE OF DOCUMENTS .                             oo
            Superseded Planning Scheme Documentation                                      520
            Copy of Permit/Approval Letter                                                110.
       .    The Noosa Plan Documentation                                                ‘4110
  APPLICATION FEES ~                                                     :            |
      ;     Material Cha     Use 7Codelimpact             ce
  =               Aconeiste              oo,                          LO}                 82         |         |
                      ofisistent                      ,            ;                      521
       oe   Assessment under Superseded Planning Scheme               _                   §21
           . Modification to a Development Permit                     _                   §21
 .          ‘Extension of a Currency Period                                               521
 @          Operational Works - Landscaping                                               §21
            Bidg Work assessable against the Planning Scheme   ;                 .    -   §24                  oO
 -PRELODGEMENT REVIEW                             |           |           a          |       |        7
            Half Hour                                   ,                                 $22        .
   :        _One'Hour         ;           ,                               .                522
  ADVERTISING                  ae                              CO                         |
         . . Purchase Advertised Applications                                             ‘523
  JETTIES            |                         |                                     .         a
             Jetty Application Fee .            oO              :                          524
            Jetty Bond:           ae                                                "gest (¥)
   BONDS                                               |                  Oo                           |
   ,       * Performance Bond                          a          -      .               - §0                 oo
   SIGNS         SO               =                .               OT                SO                   |
            Registration Fee             ,                                   ,             222
 @ 2c       FEE                      mo               :                        oo            oS
             Search of Land Use Section file .                               _             112               7
             Liquor Licensing Request _    a              .       .                        113           -
         ae                       :      -                   TOTAL     $$  Gey,                            |
   NAMES       Mp ee pln ews SIC                                                             .            oe
   ADDRESS:       Pe        Gee       2 Be                |                .     _            |       SO
    __.                                   a eee 0 ee                     >
   FILE NO:       C7 be ST]                   ____ DATE:      Mof3lo7-
'  RECEIPTNO:-/                         _        . Signature of TP Officer:   3   ¢
   AUTHORITY.NO!                                 _                                    oo

Section 26

:                 CALCULATION OF FEES                 re
                      APPLICATION                       FEE                  “TOTAL          :       -
                                                                             FEES.    .
  MCU - CODE ASSESSMENT
  Details of Development

 {Consistent 1.0                                                                                          .
  Inconsistent 3.0
  FEE CALCULATION          |           :      |

_|MCU-IMPACT ASSESSMENT                         ——                                                  e@
  Details of Development .                                                                           -

  Consistent 1.0                                                          .                .  |
  Inconsistent 3.0
  FEE CALCULATION                          |

  OPERATIONAL WORKS _.                                                                               |
  Details of Development                          a,                                          .      -

  FEECALCULATION                                                                              |    e
 TOTALFEES                               -                      —           ;                           oe

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001593E2.001.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.