Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

001593E2.001

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

.  INTEGRATED PLANNING ACT 1997                                                                         IDAS Assessment Checklist, Version 19.0, 2 March 2007
                  State-controlled road matters            2.   The application involves: (tick appicable box/es)
                  TR MONE ISTE SE EE      Cadets                [1 (i)   development on land contiguous’ to a State controlled road and for -
                  Unless you answered “none of the above" to Q2,                       .                                   .             .
                  the application triggers referral to the Department    (C1 (a) material change of use assessable against the planning scheme;
                 of Main Roads (DMR) as a referral agency.               C1 (b) reconfiguring a jot unless -
                  In certain circumstances OMR wilt be an advice                                            :     .         .
                  agency, while in other circumstances DMR will                 « the total number of lots is not increased; and
                  be a concurrence agency.                                      + the total number of lots abutting the State-controlled road is not increased:
                 - Schedule 2 of ihe IP Regulation will assist you to                   :                      :     ‘          .                              :
                  determine where DMR is an advice or                    EF] {c) operational work (not associated with a material change of use assessable against the
                  concurtence agency for the application.                        planning scheme or reconfiguring a lot mentioned in (b) above)-
                                                                                * associated with access to a State-controlled road; or
                                                                                « for filling of excavation: or
                                                                                * involving the redirection or intensification of site stormwater from the land, through a
                                                                                   pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                                   State-controlled road.
                                                                LC  (ii) development on land not contiguous to a State-controlled road and -
                                                                         (J (a) material change of use -
                                                                               » assessable against the local government's planning scheme; and
                                                                               * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
.                                                                                 that schedule;
                                                                         (J (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
                                                                                 and exceeding the thresholds set by that schedule:                                    @
                                                                         LJ {c)  operational work (not associated with a material change of use assessable against the          '
                                                                                 planning scheme or reconfiguring a lot mentioned in (b) above}—
                                                                               ¢ assessable against the local government's planning scheme; and
                                                                               « mentioned in schedute 5 of the IP Regulation and exceeding the thresholds set by
                                                                                  that schedule.
                                                                    (iii) none of the above
                  Clearing vegetation                      3.   The application involves: (tick applicable boxes)
                  Fox more information refer to Guide 12.       q (i) material change of use—
                  Unless you answered “none of the above” to Q3,                               .             :            .
                  the application requires assessment by the              (a)  assessable against the planning scheme;
                  Department of Natural Resources and Water                                  ining —
                  (NRW).                                                  (b) on alot containing         /
                  If an agency other than NRWis the assessment                 ¢ acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
                  manager for the application, NRW is a ;                      + if there is no property map of assessable vegetation for the lot - remnant vegetation;
                 rothis matter     forthe application in relation         (c)  where the existing use of the land is a rural or environmental use; and
                  if you ticked 3(i) or (i), your application requires    (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
                  referral to NRW for assessment regardless of  0 ti)     reconfiguring a lot—                                                  .
                  whether vegetation clearing is proposed or noi.           :                .,
                                                                         (a)  on alot containing a category 1, 2 or 3 area shown on a property map of
                                                                           -  assessable vegetation or, if there is no property map of assessable vegetation for
                                                                              the lot, remnant vegetation;                                                             ©
                                                                          (b}  where the size of the lot before the reconfiguration is 2 hectares or larger:
                                                                          (c}  where 2 or more lots are created; and
                                                                         (d)   where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                                (J (iii)  operational work -
                                                                         (a)   for the clearing of native vegetation where the vegetation clearing is made
                                                                               assessable under Schedule 8 of the IPA; and
                                                                         (b)   not associated with a material change of use assessable against the planning
                                                                               scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
                                                                               Form 1
                                                                    {iv) none of the above.
                  Strategic port land                     4.   The application involves:
                  he vated) te. a to     are vis                (1 (i) development on strategic port tand as defined in the Transport Infrastructure Act 1994 (T|
                  you tis   i) - ihe relevant uthority is the
                  4       nt manager for the application.              Act) - complete Part | of Form 1
                  If you ticked (ji} Queensland Transport is a  [1 {ii) a material change of use that is inconsistent with the land use plan approved under the
                 concurrence agency for the application.               Ti Act for the strategic port land - complete Part | of Form 1
                                                                   {iii) none of the above

                 4  Land contiguous to a State-controlied road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlied toad; or that is part of a future State-
                    controlled road.
                                                                                              Page 2

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001593E2.001.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.