Skip to the record
Every meeting, every word.

Council archive · source document

001593E2.001

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                    IDAS Assessment Checklist, Version 19.0, 2 March 2007
              Development within the limits ofa            12.  Doesthe application invotve development below high water mark'8 and within the limits of a port
              port                                              ungér the Transport Infrastructure Act 1994?
             For more information refer to Guide 18. For             NO
             information about prescribed tidal work refer to
             Guide 24.                                          1 YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work
              If you answered “YES" to Q12, the appiication
             triggers referral to the Port Authority.
              The Port Authority is a concurrence agency i the
             development is —
              © within 200m of a shipping channel or an entry
                and axil shipping corridor for the port
              ¢ within 1000m of a swing basin, a commercial               .
                shipping wharf, a mooring, anchorage or Spoil                                                      .
               grounds;                                                                                                                                                .
              ¢ within 1000m of a planned port facility                                                                                                          .
                 identified in a land use plan approved under
                the Transport Infrastructure Act 1994.
              In ail other situation the Port Authority is an
              advice agency.                                                                                                                 .                  .
              Marinas                                      13.   Does the application involve operational work that is tidal work for a marina’$ with more than 6
              For mare information refer to Guide 18. For        vesg¢i  berths?
              information about whether a marina is prescribed  *
              tidal work refer to Guide 24. The local                 NO
              government is the assessment manager for al        (71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work =~
              prescribed tidat work.
              If you answered “YES’ to Q13, the application                                       :
              tiggers referral to Queensland Fire and Rescue
              Service as an advice agency.
              Tidal works in strategic port land tidal;    14.   Does   the application invoive tidal works within a strategic port land tidal area20?
              areas                                                   NO
              For more information refer to Guide 18.             oO  YES - complete Part M of Form 1
              Unless you answered *NO" to Q14, the relevant
              Port Authority is the assessment manager for the
              application and the Environmental Protection
              Agency (EPA) and Queensland Transpost {QT}
              are Concurrence agencies for the application.
             Heritage                                      15.   Does the application involve development in a heritage registered place as defined under the
              For further information refer to Guide 19.         Qugensiand Heritage Act 1992?
              If you answered "YES" to Q15, the applicatton    Ano
              triggers referral to the Queensiand Heritage
              Council as concurrence agency for the             [1 YES - complete Part C of Form 4
              application.
              Declared catchment areas                     16.   The application is in an area declared to be a catchment area under the Water Act 2000 and
              For more information, including alist of the .     involves: (tick the applicable box/es)                                                                                      ,
              declared  catchment   areas within Queensland,          .                  oe        ,                 :                                 ,
              refer to Guide 3 ae                       ;       [J (i)     reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;
              Untess you answered “none of the above" to        (J) {ii}   development assessable against the planning scheme involving the establishment or
              Q16, the application requires assessment by the              expansion of a waste water disposal system, other than a disposal system for carrying
©}            (NRW).                                                       out an environmentally relevant activity under the Environmental Protection Act 1994;
              Depariment of Natural Resources and Water                                 .                            es                    .        :            :
              If an agency other than NRW is the assessment          {ii)  none of the above                                                                  ,
              manager for the application, NRW is a
              concurrence agency for the application in                        :
              relation to this matter.

              18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
              19 Marina is defined in the Transport Operations (Maritime Pollution) Reguiation 1995.
             20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port jand.
                                                                                                    Page 5

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001593E2.001.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.