Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

001593E2.001

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                    IDAS Assessment Checklist, Version 19.0, 2 March 2007
  Integration of land use and public     22.  The application involves: (tick the applicable box/es}—
  ranspo ration refer to Guide 23, schedute     1] (i) a material change of use assessable against the planning scheme for a purpose
 8A of ihe IPA, & schedule 2 of ihe IP Requlation.    mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
  Unless you answered "none of the above’, the        schedule.                                                                    ‘
  application triggers referral to QT as a                                        ,
  concurrence agency.                         L) (ii) reconfiguring a lot~
                                                       (J (a)    on tand that is completely or partly within a public transport corridor, and the
                                                                 total number of lots increases;
                                                       [1 (b)    on land that is completely or partly within a future public transport corridor or
                                                                 an airport's public safety area;
                                                       [J (c)    on land that is within 400m of a public passenger transport facility or a future
                                                                 public passenger transport facility, and the total site area is 5000m:? or greater;
:                                                      [J (d)    for a residential purpose within the 25 ANEF contour for an airport;
                                                       [1 (e)    for aresidential purpose resulting in 100 or more allotments,
                                              ( (iii) operational work assessable against the planning scheme, but not associated with a
                                                      material change of use mentioned in (i) above or reconfiguring a lot mentioned in {ii)
                                                      above, on land that—
                                                       [J (a)    is completely or partly within a public transport corridor or a future public
                                                                 transport corridor;
                                              d,       [7] (b)   will result in work that encroaches into an airport's operational airspace.
                                         :        {iv) none of the above.                                                                        @
  Railway safety and efficiency          23.  The application involves: (tick the applicable box/es)—
  aoe IPe backed     2h         sormoule      [1 (i) a material change of use assessable against the planning scheme for a purpose
                   :       ——e—en                     mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
  Unless you answered “none of the above", the
  application triggers referral to QT as a            schedule.
  concurrence agency.                         [| (ii) reconfiguring a lot—
                                                       [] (a)    on tand that is completely or partly within a future public transport corridor,          ‘
                                                                 future railway land or a railway tunnel easement;
                                                       [J {b)    on land that is within 400m of a Citytrain passenger railway station or a future
                                                                 Citytrain passenger railway station, and the total site area is 5000m? or
                                                                 greater;
                                                       (J (c) — onland that abuts rail corridor land, commercial corridor land or future railway
                                                                 land, and the total number of lots increases;
                                                       [1 (4)    on tand that abuts rail corridor land, commercial corridor land or future railway
                                                                 land and an easement abutting the corridor or future railway land is created;
          ;                                            (J (e)    on land that is completely or partly within 100m of, and abutting an approach
                                                                 to, a railway level crossing, and the total number of lots increases;
                                                       [_](f)    for a residential purpose resulting in 100 or more allotments.                   :
                                              L_] {iii) operational work assessable against the planning scheme, but not associated with a
     .              .                                material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)     ©
                                                     above, involving extracting, excavating or filling greater than 50m, on land that—
                                                       L (a)     is completely or partly within rail corridor land or commercial corridor land, and
                                                                 the work is not for rail transport infrastructure or other rail infrastructure;
               .                                       (_] (b)   is completely or partly within future railway land, or a railway tunnel easement:
                                                       {](c)     abuts rail corridor land, commercial corridor land or future railway land, and
                                              A                  the work is within 25m of the railway boundary.                                    ,
                                                  {iv) none of the above.
 Moonie to Brisbane pipeline            24.  The application involves the easement for the construction or operation of the Moonie to
 For more information refer to schedule 2o! the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es}—
 Begeicien        .              .            (_] (i) a material change of use assessable against the planning scheme and not associated
 apnicaton (ingen wtehal tothe hover of              with reconfiguring a lot, and any structure or work will be located wholly or partly in the
 pipeline licence No 1 issued under the Petroleum    easement.
 Act 1923, currently Santos QNT Pty Ltd, for    | (ii) reconfiguring alot
                                               J (iii) operational work assessable against the planning scheme, that is filling, excavation,
                                                     compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
                                               dh    work is located wholly or partly in the easement.
                                                  (iv) none of the above.

                                                      .                    Page 8                                     ,

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001593E2.001.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.