Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2016-02-02 Infrastructure & Services Committee Agenda

of 41

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                                                                             2 FEBRUARY 2016


COMMUNITY SERVICES DEPARTMENT
SECTION            RECENT ACHIEVEMENTS                               CURRENT PRIORITIES                                LOOKING AHEAD
Waste Management      Completed the Annual Bulk Rubbish               Preparing the 2016/17 Budget.                   Calling the tender for the next Waste
                        collection 17 October with strong               Interviewing large waste contracting              Management Contract approx. June
                        community support for the initial                 companies as a preliminary step to                2016
                        mattress collection service                       developing the Waste Management                 Reviewing the Asset Management Plan
                      Reported to Council on results and                Contract                                          for Waste Management
                        issues associated with annual bulk              Developing the tender for the next              Development of a bin register in T1
                        rubbish collection service                        Waste Management Contract                         system to record services and collection
                      Reported to Council on Community Jury           Finalising the REMP for the landfill in           days in preparation for the next waste
                        recommendations and Council decided               consultation with DEHP                            contract
                        on a mandated garden waste service to           Completion of 14/15 CAPEX project               Preparing    a    Litter  Management
                        urban areas                                       carryover for water monitoring at landfill        Strategy
                      Advertising the availability of mulch at          - dependant on DEHP finalising the
                        landfill in media was highly successful in        REMP
                        moving large surplus of stockpiled              Advertise the availability of crushed
                        material                                          concrete in the media to assist in
                      Developed         a    draft   Receiving          moving the large stockpile of crushed
                        Environmental Monitoring Program                  material
                        (REMP) for the Eumundi Landfill. Noosa          Developing the next phase of the waste
                        is the first local government in                  education and information program
                        Queensland to use this approach for             Preparing for the disposal of waste into
                        complying         with    the     Landfill        new cell 2.2 at the landfill approx. March
                        Environmental Approval issued by                  2016
                        Dept. of EHP                                    Developing a Waste and Recycling
                      Attendance at the Noosa Show                      Management Plan as required under
                        highlighting         Community       Jury         the Waste Reduction and Recycling Act
                        Recommendations on Organic Waste,               Further report on annual kerbside bulk
                        pest and mosquito management.                     rubbish service and options for
                      Extended        the    Current     Waste          improvement
                        Management Contract (All Separable              Reviewing Hastings Street Waste
                        Portions A,B and C) to 31 August 2017             Collection service and potential
                      Completed audit of garden waste, food             solutions for inclusion in the next
                        waste and recycling bin contents and              contract
                        reported to Council




                                                                                                                                                     Page 33 of 41
Log in to download the original file

2016-02-02 Infrastructure & Services Committee Agenda(PDF, 2MB).pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.