INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 2 FEBRUARY 2016
SECTION RECENT ACHIEVEMENTS CURRENT PRIORITIES LOOKING AHEAD
Comprehensive safety inspection of Clean up of Windows Explorer drives Undertake tour of similar facilities to
stadium ceiling structure completed with and folders and subsequent migration learn about others’ operations and what
old D-shackle brackets replaced and of files to refined N drive we may be able to bring back and
upgraded to enhance patron safety. Develop plan for a retail offering within implement at NLC to improve operations
Group fitness survey conducted with the redesigned foyer area. The aim Development of a succinct operational
approx. 50 responses received. Insights being that these retail sales will improve plan for the facility which ties back to the
garnered through this process will inform bottom line performance without adding priorities outlined in the recently
future programing any additional labour or overhead costs developed Community Facilities
Noosa ‘Contender of the Codes’, an strategic overview
amateur boxing event, was held at NLC
on 21 November. Over 400 attendees
with funds raised going to support local
sporting clubs and the Sunshine
Butterflies
Internal ‘pulse check’ completed with
findings to feed into a set of
recommendations for the CF branch
Noosa Aquatic Centre NAC service review nearing completion Preparation of 2016/17 draft budget Completion of capital works projects
and presentation to review panel Appoint contractor to complete a (heat pump replacement and re-grout
Busy period over school holidays with detailed inspection and assessment of and re-caulk of program pool) in April.
inflatable and intensive learn to swim pool plant and develop comprehensive Reinforce ramp at same time following
sessions happening throughout maintenance schedules, asset registers recent damage in some parts
Internal ‘pulse check’ completed with and capital renewal plans Replacement of gym equipment via
findings to feed into a set of Clean up of Windows Explorer drives operational lease to spread the cost over
recommendations for the CF branch and folders and subsequent migration several years
of files to refined N drive. Undertake tour of similar facilities to
Resumption of normal operations at the learn about others’ operations and what
beginning of Term 1 following summer we may be able to bring back and
school holidays implement at the NAC to improve
operations
Implementation of service review
recommendations
Development of long-term Asset
Management Plan
Page 36 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.