Original source · versioned page text
2016-02-02 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 2 FEBRUARY 2016
SECTION RECENT ACHIEVEMENTS CURRENT PRIORITIES LOOKING AHEAD
Infrastructure Daintree Estate Flood Mitigation Construction of Dr Pages Road Design of bridge rehabilitation for
Planning & Design Infrastructure – hydraulic modelling, Munna Point Bridge Rehabilitation Sheraton, Doonella, and Witta Bridges.
State Land allocation, design and Rifle Street, Pomona Flood Mitigation Hilton Terrace and Ernest Street
construction. Infrastructure – hydraulic modelling, (Goodchap Street) intersection survey,
Relocation of Tait House property acquisitions, design and planning and design
Dr Pages Road construction awarded construction completion. Poinciana Avenue intersection survey,
Ben Lexcen Drive civil design complete William Street footpath construction planning and design
Draft design for Lake Weyba Drive bus Design support for Dr Pages Road and Road directional signage review
turnaround complete contract construction inspections and Standard Drawings review & update.
Package 1 of DDA bus stop upgrade supervision. Planning for PTAIP 2016/17 bus stop
programme designed for tender Survey and design of PTAIP 2015/16 – disability compliance upgrade
Development of new coastal and rural bus stop disability compliance upgrade programme
bus shelter prototypes program Planning for 2016/17 capital works
Xmas Free Holiday Bus programme Survey, design, consultation and programme
Delivery of Safer Street grant for documentation of Park Road Boardwalk Easter Free Holiday Buses programme
improved lighting and CCTV around NJ Survey, design and documentation of Sandy Creek and Eastern Branch
bus station Cooroy Noosa Road Stages 2-6 culvert upgrades design.
Goodchap Street design upgrade Ben Lexcen Drive school crossing
William Street footpath design complete improvements construction support
Reef Street and Weyba Road
intersection improvements construction
support
Forward Planning Design Programme
Revised pricing of coastal bus shelter
and prototype for Rural Bus Shelter
Electric Bus EOI & tender
Free Buses evaluation
Poinciana Avenue footpath upgrade
design
Main Beach boardwalk missing link
design
Noosa parade corridor upgrade concept
designs
Page 6 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.