Skip to the record
Accept no substitutions.

Original source · versioned page text

DA Form 1 - Operational Works Application

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.

  

Additional aspects of development

D0 Additional aspects of development are relevant to this development application and the details for these aspects
that would be required under Part 3 Section 1 of this form have been attached to this development application

Not required
Is the application for State facilitated development?
O Yes - Has a notice of declaration been given by the Minister?
No

    
 
   
     

 

Section 2 — Further development details
lee] eye)le= lama ela

     

fod mat —mcoll (eI

 
   

 

 

 

 

 

Material change of use (1 Yes - complete division 1 if assessable against a local planning instrument
Reconfiguring a lot C1 Yes — complete division 2

Operational work WYes — complete division 3

Building work (1 Yes - complete DA Form 2 - Building work details

 

Division ils - Material change of use
is only required to be completed if any part of the development application involves a material change of use assessable against a

  
 
  

 

 
   

nge of use
Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor
proposed use (include each definition in a new row) units (if applicable) area (m?)

(if applicable)

   

     

 

 

 

 

 

 

8 2) Does the proposed use involve the use of existing buildings on the premises?

 

 

(1 Yes - provide details below or include details in a schedule to this development application

(No
Provide a general description of the temporary accepted development Specify the stated period dates
under the Planning Regulation

 

 

 

 

 

 

 

Division 2 — Reconfiguring a lot
Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot.

 

 

 

(0 Subdivision (complete 10) (1 Dividing land into parts by agreement (complete 11)
(1 Boundary realignment (complete 12) (1 Creating or changing an easement giving access to a lot
from a constructed road (complete 13)

 

 

   

) Queensland
Government
Log in to download the original file

DA Form 1 - Operational Works Application.pdf · 15.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.