Response to RFI - Bain Venture Sheds - 2293
Attached to the e-mail Response to Information Request - MCU17/0560 and OPW17/0595.
Page 3
Items 5: Engineering – Stormwater Levels
5. Please review the stormwater drainage plans, amend where necessary and provide a cross
section/s to clarify the finished levels arrangement and grades.
Applicant’s Response:
The detailed engineering design drawings are included as Attachment 1, which clarify the finished level
arrangements and grades to allow for appropriate stormwater collection and disposal.
Items 6 & 7: Engineering – Parking and Loading
6. Provide/address the following:
a. Revision of the design to provide a more central location for the loading bay that
minimises the potential of traffic conflict with other vehicles, particularly vehicles
entering the site.
b. Information regarding the size of service vehicle utilising the proposed loading bay and
showing on plan the turning paths for the vehicle entering and exiting the loading bay.
c. The design must aim at allowing all vehicles frequenting the site to enter and leave the
site in forward gear.
7. Provide:
a. Line marking plan including all required signage, all relevant dimensions for parking
spaces and disabled parking space/s in compliance with the current standards.
b. A turning space appropriately located toward the rear end of the parking area to allow
vehicle to turn and leave site in forward gear when all parking spaces are occupied.
Applicant’s Response:
The onsite carparking and manoeuvring areas have been amended to provide a central location for the loading
bay, which is accessible from all the tenancies. The design allows for an SRV vehicle (6.6m x 3.5m) to load
on the site and leave in a forward gear.
The size of the bay is the same as the adjoining development to the north, which has similar small factory unit
type tenancies and does not require deliveries from larger trucks. Amended engineering plans are also
provided showing a turning space at the end of the site, required signage, dimensions and a disabled parking
space in compliance with the AS standard.
The applicant has responded to Council’s information request. We request that Council proceeds with its
assessment of the application as soon as possible in accordance with the Planning Act 2016.
Please contact our Noosa office if you require any further information and/or clarification.
Yours faithfully,
Jack Lewis
Senior Planner
martoo consulting pty ltd
Attachment 1 – Updated Plans
Attachment 2 – Waste Management Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original