Original source · versioned page text
2011 - WD-P4 arch plans 30.04.2021
Attached to the e-mail Operational Works Application OPW21/0135 - DA Form 1 - Plans - for 41 Sunshine Beach Road - MCU20/0136.
3.01
3.01
3.01
03
02
01
10 09 08 07
8269 5225 5050 5005 2485
existing building
SC002
23.0
23.0
existing laneway stone base wall existing retaining wall
W13 DP site boundary DP
A
DP
from site boundary
6 5 4 3 2 1 DA shared
ROOF 'G'
zone
over tenancy 01 - 71m²
new block wall
existing footpath & HW14 C-04
over
W12
signage to be FFL 22.200
5530
removed Class 6 B
fall 2
new street trees
3.0
& verge lanscaping existing 300 dia
C1
as per landscape DP from sewer main
architect's details. ROOF 'F' over C
DP 2
s 3.0
y cle
bic
B
HW13
W11 over refer to
carpark reflected ceiling plan line of building
d.p.
01
C-02 for downpipe layout above
site bou
A A
3.02 FFL 23.600 3.02
ndary
C1 Class 7a void void
over over
6270
fall s.w. pit fall C-02 n
dow h
new verge HW12
W10 over
s h
wa wit
S U N
seating as per DP from
er bin ly pit valve
landscape ROOF 'G' over roll tter gul ersion
architect's landscaped footpath s u r
h
div
details. verge refer to understair self-closing ove
02
landscape HW11 planter bed or fire door
D03
architect's 1
ram
over
sculpture plinth -/120/30 GD0 planter ting e
exis scap
driv
spec.
S H I
pu
25.
bed land ge
C
ip
ewa
p
str in
5
ver
2 1 SD01
HW10 7 8 9 dra
W09 lobby
y
over amenities
B
B
C-04 C-04 D04
3.02 1 2 3 4 5 6 7 8 9
N E B
FFL 22.200 FFL WC
25.0
cut out in
4580
HW09 Class 5 23.600 y
D02 stair 01 dar
oun
over
awning with fall
glass roof new
siteb
over water
C C D05
high level meters
24.5
3.02 W08 HW08 Lift openings for
over
D06 PWD ventilation protect and retain
new existing tree
E A C
remove
D
street existing
1000
tree tree
D01 HW07 0
24.
E
22.0
over
ry
nda
22.0
SC001
22.0
bou
tenancy 02 - 50m² site
H R O
24.0
HW06
W07 over C-04 s.w. pit
C1 FFL 22.200 protect and
3
Class 6
DP retain 341
DP from existing tree
GPT m r
ROOF 'G' over
W06 HW05 C1
HW01
r fro ' ove w
over
e ' F l o
pp ' &
over
e
dro OF 'E DP b
01
A D
new verge C1 DP 23 o
.5 O
R let t
planting upgrade W05 out t int 6 290
as per landscape HW04 C1
o utle ow po
architect's spec. over C1 HW03 dp ter l new crossover and
W04
over HW02
over gut ramp as per council
concrete awning roof requirements. Retain
over W03 W01 d.p. protect & existing foootpath
W02
retain
existing 400
0
02 levels
existing paving to be tree protect & retain
demolished existing tree
01
3.0
03
1
0
path 400
foot
22.5
23
.0
W
existing concrete 400
0
04 O
pedestrian crossing R
PRELIMINARY
existing stormwater
ramp to be retained A
IL 23.42
manhole
I M LL 25.21
02
4000 05 3.0 R Apr 2021
1
R NOT FOR CONSTRUCTION.
new verge planting
E
upgrade
B 5m
3.01
as per landscape 0 1 2 3
06
03
architect's details.
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants ground floor plan dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 2.01 P4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2011 - WD-P4 arch plans 30.04.2021.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 7 pages
Page 2
3.01
3.01
3.01
03
02
01
existing building
10 09 08 07
8269 5225 5050 5005 2485
high level glazing over carpark exhaust timber privacy screen
0 / 60 / 0 riser void
900mm radius
to corner
350 350 SC101 DP DP SC102
+ site boundary
+
A
200 store
350 + print table
+ dp
HW115
outlet over WC W123
D107 C-04 ac plant metal
1:100=
high window HW116
FFL
over 26.650 slab balustrade
over
5530
B concrete planter
HW114 SC105 SC103 2
D106 3.0
60mm
W122 over
office 1 Office 3 kitchen / staff WC 300mm
C-04 C-04 C-04 C-04 W124 min. soil depth
void void
fall
fall C
2
260
D104 W132 D105 3.0
+ D103 roof access
ll D108 G101
30mm fa DP hatch DP
B
1 : 10 0
06
DP W125 SC104 SC1
01
A A
er
glass partition wall
3.02
W101
planter
pl ant 3.02
dropper from 1:100=
C-03 05
front desk W1 07 concrete planter
ROOF 'E' & 'F' over office 2 W131 concrete planter W106 W1
d.p. 7 300mm
6270
outlet through C-04 300mm C10
S
tenancy 01 HW113 min. soil depth
W121
DP over min. soil depth 104 26
W1
60mm fa
S U N
drop ceiling void reception W
9 l 08
cobble tenancy 03 - 300m² D10 ss wal W1 rendered block wall
gla tition
stone C-04 W102
W1
03 par stone wall
ll
02
FFL 26.700 27 stone capping
W1 all
dp D102 Class 5 DP nw 6
200 io ce
outlet + D101 rtit offi 4
S H I
a stormwater catchment pit
D 110 s sp C-0
C
gla
9 8 7 6 5 4 3 2 1
101
stair 02 B 28 HWover
B W1 l
n wal 5
3.02 itio ce ay
offi 4 09
1 2 3 4 5 6 7 8 9
t vew
N E B
250 par W1
+ D11
1
ass dri w
4580
HW112 stair 03 gl C-0 d - lo
voi p be
opening in W120 over
concrete roof. r am
r
fall 102 ove
C
glass roof void lift C HWover
roo
f box
f t er
3.02 c e4 line
o
pla
n
200
+ D113 D11
2
W1
29 offi 4 10 et
W1 outl w m o unt tro
ugh
130 C-0 dp belo wa l l g e l
wal
E A C
W 103 ina
in dra
D
buffet HWover
cha n a nd
1000
in-situ concrete dp outlet. t
to ope ups
HW1er11
te
W119
ov
awning
SC114
gutter low fall r e
111 c
services & con
E
point W
y
formed concrete mech riser meeting room n dar
gutter C-04 bou
104 site
HW1er10
HWover
H R O
350
W118
ov
SC113
+ fall
formed concrete
12 +3
upstand 105 W1
1:1
HWover DP
ace 50 3
terr 341
HWover
00
109
W1
106
=6
13 +2
SC1
HWover m r
17
HW
1
ove 08
W1 50 fro ' ove w
r
12
0m
r HW107 e ' F l o
C10
8 pp ' & e
dro OF 'E DP b
over
+2
01
S
A D
mf
external venetian 14 00
W1 W1 O
R let t o
all
motorised blinds 16
260
+ SC1 W115 SC1
09 out t int 629
0
+2
external cobblestone
11 20 o utle ow po
SC110 dp ter l
drainage trough spit +2 gut
to concrete awning ROOF 'G' 00
concrete roof1:100=
60mm
0.5° fall fall
400
0
02
30mm fa
1 : 100
pebble roof with 1 : 100
planting as per
01
3.0
landscape architect's
ll
+3
03
1
drawings 0
50 400
W
400
0
04 O
R
PRELIMINARY
insitu concrete
column to detail A
I M
02
4 000 05 3.0 R Apr 2021
1
cut out in R NOT FOR CONSTRUCTION.
concrete roof E
for existing tree B 5m
3.01
0 1 2 3
06
03
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants first floor plan dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 2.02 P4
Page 3
3.01
3.01
3.01
y
03
02
01
boundar
offset
10 09 08 07
8269 5225 5050 5005 2485
block wall below
formed gutter line of glazing eaves gutter
below
00
00
DP DP
+3
+3
A
+
210
ROOF 'D'
0+
+
0
26
DP metal roof
40
formed
gutter concrete hob at 2° pitch
1:100=
HW116
200 x 400 high over
5530
concrete hob B
HW114 roof flashing er 2
kitchen / staff roof void
' ov 3.0
60mm fa
over
'C
P O OF
DP & D mR
outlet to dp
spreader from fro dia.
0 C
ll
below 15 ed
ROOF 'A' dropper from
n end 3.0
2
ROOF 'B' over ope ter
150 150 dia. gut
B
+ DP
DP
01
DP &
A part plan spreader from 140mm sump and outlet
A
3.02 ROOF 'A' metal roof access hatch eave
3.02
to DP below.
over hallway. gutter overflow spitter
ROOF 'F' verify size and position to planter below.
concrete awning roof
6270
before installation box gutter
HW113
over 0.5° fall roof void 300w
S U N
1:100=
1 : 100
75mm concrete roof
fall
1° min falls
02
1 : 100 id
120mm
f vo
eave gutter DPs roo
S H I
of roof over
C
fall
B B
270 d
3.02 300 +
DP &
f voi n
roo ' hai
N E B
+ spreader from DP
O F 'F and c
4580
HW112
over
ROOF 'A' RO tter
30mm spi lower roof
fall line of glazing formed on crete
con
bou ffset
1 : 50 below lift C gutter
C
o
shaft
nda
3.02 gutter high DP 'F' an nt
ry
point OF art pl poi 400
E A C
O h +
R hig
D
p
see ter
1000
0+
270 gut
HW1er11
+
ov
spitter 6
15
ce
E
formed gutter
offi +30
block walls 101
300 wide below e low HWover f all 0
'F' b mm
HW1er10
H R O
OF 0
ov
20 - 50 mm 12
depth ROOF 'E' o RO ter dar
y 0=
t t 0
let spi bou
n
1:1
1:100 fall
concrete roof 150 out rflow site c e5
offi
DP 3
ove 341
H over
to outlets + +2
W1
0.5° fall 70
09
102
ver m n
1:
+25 HWover
HW 1 : 100 'o +27 olu
10
ove108 0 F 'E c
r 50mm O 0 ete
0=
RO w cr
con ow
fall +
01
A D
m
12
250 o
fr bel o
1 : 50 per o dp 4 30mm bel
0m
fall o p
dr let t o ffice +30 290
m
fall 0 6
out
fa
103 fall 1 : 50
ll
HW er ov
mm
1 20
'F' n ing 0= n
O OF te aw 1:1
0
r t pla '
R cre w. 104 pa F 'F
con f belo plan HWover O
ROOF 'E'
concrete overhang roo part ry RO 400
0
02
see da
off-form finish line of glazing 105 boun
meeting room HWover +15
site
0
01
below
3.0
DP
03
1
106 0
HW
ove108
HWover 400
r HW107 fall
over
mm
20
0 0=
1
W
1:1
400
0
04 O
+30 R
PRELIMINARY
concrete columns 0
below A
I M
02
3.0
4000 05 R Apr 2021
1
R NOT FOR CONSTRUCTION.
E
B 5m
3.01
0 1 2 3
06
03
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants lower roof plan dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 2.03 P4
Page 4
3.01
3.01
3.01
03
02
01
10 09 08 07
8269 5225 5050 5005 2485
O.H.
O.H.
O.H.
140mm eave gutter line of building O.H.
to roof below below
O.H.
A
ROOF 'D'
below
refer to
ROOF 'B'
5530
WD 2.03
B
metal roof 2
3.0
at 5° pitch
DP & DP DP dia.
0
spreader to open 15
d C
O.H
ROOF 'D' ended nde 3.0
2
below gutter e ne
.
p
o ter
gut
B
DP
DP eaves gutter
01
DP
A A
DP DP and dropper to
3.02 3.02
& spreader Roof 'E' below
ROOF 'A' to ROOF 'E' 150 dia.
below
metal roof
6270
eaves g
at 5° pitch ROOF 'E'
ut ter
S U N
below esg
refer to eav
utter
WD 2.03
O.H
bou ffset
02
o
.
nda
DP DPs
ry
S H I
& spreader
C
to ROOF 'E'
below
B B '
3.02 O F 'C f
DP RO al roo
N E B
t
me ° pitch
4580
DP
DP & spreader at 5 x 0 = O.H
.
line of glazing to ROOF 'E'
y4
C below C below a rra anels
pv 5w p
3.02 spitter 37 0 kW
.
15
E A C
O.H.
D
1000
E
formed gutter
300 wide
H
20 - 50 mm
y
depth ROOF 'E' n dar
1:100 fall below bou
site
R O A
refer to 3
to outlets 341
WD 2.03
ng
ildi
of bu
Line ow 01
bel 290
D
6
'F' .
O OF te O.H
R cre oof
con ing r
awn ow 400
0
02
line of glazing bel er to
3
ref 2.0
01
below D
3.0
W
03
1
0
400
W
400
0
04 O
R
I M
A PRELIMINARY
02
3.0
4 000 05 R Apr 2021
1
R NOT FOR CONSTRUCTION.
E
B 5m
3.01
0 1 2 3
06
03
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants upper roof plan dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 2.04 P4
Page 5
SITE BOUNDARY
SITE BOUNDARY
A B
--
6.00
window head
suspended
screen external concrete
blade coloumns
void tenancy timber clad
FFL 26.700 stone clad block
LEVEL 1
planter
TB-02 ramp ex. NS-01
ceiling / soffit
section crank
render edge footpath
block wall roller
shutter
RB-01 RB-01
car park
existing
FFL 23.600 alley on
CARPARK
neighbouring
site
FFL 22.200
GROUND
Section 01
SITE BOUNDARY
SITE BOUNDARY
dropped ceiling concrete metal roof
roof pv panels 5° pitch
A for ducted ac B
pitching point
ducted ac
units in external concrete
ceiling
suspended blade coloumns
ceiling
ceiling void timber clad
concrete planter
kitchenette reception tenancy 03
FFL 26.700
LEVEL 1
ceiling / soffit
slab clearance
section crank
fixed feature stone wall
ventilation existing
screen ground line
car park
FFL 23.600
CARPARK
alley
FFL 22.200
GROUND
Section 02
SITE BOUNDARY
SITE BOUNDARY
roof hatch with
A B fixed stair C D E
dropped
window head
ceiling
ceiling / soffit
window head
ceiling
services
riser
print room reception meeting room
FFL 26.700
LEVEL 1
stair lift
well shaft
batten bifold
ceiling / soffit
FFL 23.600
cladding car park
aisle
internal
structural column
windows
to corner PRELIMINARY
CARPARK
alley
Apr 2021
stone tenancy 01 tenancy 02 NOT FOR CONSTRUCTION.
cladding
FFL 22.200
GROUND
Section 03
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants section 01, 02, 03 dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 3.01 P4
Page 6
SITE BOUNDARY
SITE BOUNDARY
flat roof picture window
10 external box gutter
09 08 07
suspended
screen
window head
honed
structural slab planter batten
courtyard ac void fence
tenancy 03
reception
FFL 26.700
LEVEL 1
TOW
ceiling / soffit
slab clearance
26.400
ceiling / soffit
ceiling / soffit
PWD TOW
car park shared existing 25.200
zone retaining wall.
FFL 23.600 depth of
CARPARK
footing to be
tenancy 01 determined
FFL 22.200 NS-01
GROUND
Section A
SITE BOUNDARY
SITE BOUNDARY
01 02 03 04 05 10
high level
automated continuous window
drop screen
window head
suspended
screen SC-01 W105 W105 W104 W103 W128 D111 D112 W112 planter box
off-form concrete
reception stairwell
FFL 26.700
LEVEL 1
slab clearance
section crank
ceiling / soffit
SC01
ceiling / soffit
concrete
pedestrian
car park roof
FFL 23.600
CARPARK
lobby
FFL 22.200
GROUND
Section B
SITE BOUNDARY
SITE BOUNDARY
01 02 03 04 05 3-stop roof behind over
lift meeting room
high level
continuous window
window head
suspended
screen -- external concrete
6.00 tenancy 03 meeting blade coloumns
timber clad
office 6 office 5 office 4 room
FFL 26.700
LEVEL 1
lift
ceiling / soffit
concrete
nib wall shaft PRELIMINARY
ceiling / soffit
bins concrete
R-01 car park R-01 pwd amenities 14 Jan 2021
pedestrian roof
NOT FOR CONSTRUCTION.
FFL 23.600
CARPARK
lobby footpath
FFL 22.200
GROUND
Section C
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants section A, B, C dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 3.02 P4
Page 7
external venetians
concrete to meeting room
shade awning 06 windows 05 04 03 02 01
SITE BOUNDARY
SITE BOUNDARY
TB-01
HW108 HW107 HW106 HW105 HW104 HW103 S.B.J. HW102 S.B.J. HW101 S.B.J.
FFL 30.100
S.B.J. S.B.J. S.B.J.
W116 W115 W114 W113 W112 W111 W110 W109 drop chain
TB-02 SC111 SC110 SC109 SC108 into SW pit
TB-01 TB-01 CO-01
FFL 26.700
LEVEL 1
CO-01 R-01
HW04 HW03 HW02 HW01 SC01 GD01 NS-01
NS-01
W04 W03 W02 W01
FFL 23.600
CARPARK
FFL 22.200
GROUND
South elevation stone basewall. concrete awning ventilation
screen
existing ground line
at site boundary
roller door
head box
open grille type aluminum
roller shutter
existing kerb
NS-01
black
A B C D E
SITE BOUNDARY
SITE BOUNDARY
TB-01
HW114 S.B.J. HW113 S.B.J. HW112 S.B.J. HW111 HW110 HW109 HW108
FFL 30.100 HEAD
silicon S.B.J. S.B.J. external concrete blade coloumns
W122 butt W121 W120 W119 W118 W117 W116 timber clad
joint SC114 SC113 SC112 SC111TB-02 SILL
TB-01
FFL 26.700 SILL
LEVEL 1
CO-01
HEAD
HW14 HW13 HW12 HW11 HW10 HW09 HW08 HW07 HW06 HW05 HW04
SILL
W06 W05
FFL 23.600 W12 W11 W10 D03 W09 D02 W08 D01 W07
CARPARK
alley tenancy 01 tenancy tenancy SILL
03 02
NS-01 lobby NS-01
FFL 22.200
GROUND
East elevation concrete awning
roof
stone cladding
base wall &
concrete awning
capping stone
PRELIMINARY
Apr 2021
NOT FOR CONSTRUCTION.
0 1 2 3 5m
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants elevations dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 4.01 P4
Page 8
07 08 09 10
SITE BOUNDARY
SITE BOUNDARY
TB-01 HW116
HW115 high window
FFL 30.100 facing boundary
SC107 SC103 SC102 to achieve FRL
SC-01 -/60/-
window head
timber screens DP DP
batten screening
FFL 26.700
LEVEL 1
R-01
ceiling / soffit
new block wall
existing block wall hinged screen
(neighbouring site) NS-01 RB-01 RB-02 for cleaner's
SC102 access to
FFL 23.600 W13 window
CARPARK
corner window
stack stone FRL -/60/-
FFL 22.200 NS-01 base wall
GROUND
West elevation
downpipes cladding battens on
to carpark stormwater boundary wall
system
privacy screen
not shown
E D C B A
SITE BOUNDARY
for clarity
SITE BOUNDARY
HW103 HW102 HW101 W108
FFL 30.100
SC107 G101 SC103
W124 W123
window head
TB-01
CO-01 CO-01
FFL 26.700
LEVEL 1 TOW
CO-01
ceiling / soffit
R-01
HW03 HW02 TOW FFL 25.200
TOP OF WALL
EXISTING BLOCK WALL
DP DP
FFL 23.600
CARPARK
FFL 22.200
GROUND
North elevation
existing kerb profile of proposed
driveway
new block wall
PRELIMINARY
14 Apr 2021
NOT FOR CONSTRUCTION.
0 1 2 3 5m
Scale 1 : 100 @ A2
po box 603 noosa heads qld 4567 project issue date details drawing proj no.
commercial development
ph 07 5455 4808
41 Sunshine Beach Road, Noosa Heads
P4 30.04.21 OPW submission
working drawings 2011
N
P3 29.04.21 for consultants
email [email protected] P2 27.04.21 for consultants
abn 85 114 469 395 client
P1 21.04.21 for consultants elevations dwg no.
reg no 002195 BDH Group Investments Pty Ltd WD 4.02 P4