Skip to the record
Noosa’s premier civic archive.

Council archive · source document

09/0077 - Preliminary Building Approval - Garage [As Published] · 172009.77

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

 
   

Form 1 Development Application

Part E

Building &/or operational work assessable against a planning scheme

 

 

 

 

‘Nature of the works’ To
1. (re of work that requires assessment against a planning scheme:
Building work - Complete Table A (J Operational work - Complete Table B
Table A

(i) What is the nature of the building work made assessable in the planning scheme? .
LACAN = COroce) _|

(ii) Are there any current approvals associated wh this application? {e.9. material change of use)

 

 

 

 

 

 

 

 

 

No LO Yes - Provide details below
List of approval reference/s eo . Date approved Date. approval lapses (if known)
[ 4.
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
(1 Roadworks CJ Stormwater C1 Water infrastructure [_] Clearing vegetation under the planning scheme
L) Drainage works — (_] Earthworks LD Sewerage infrastructure
(1 Landscaping CO Signage C1 Other — Specify

 

(iii) What type of approval is being sought? (NOTE: if you have indicated muttipie operational works in question {i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

(C1 Development Permit (J Preliminary Approval (1) Both (Specify below)

r

(iv) ts the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
CINo (1 Yes - Specify the number of lots being created

 

 

 

 

(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a tot)
[No (1 Yes - Complete Table B{a)
Table Bia) * -List of approval references - Date approved Date approval lapses (if known)

1.

 

 

 

 

 

 

 

 

 

 

 

 

 

2. What is the dollar value of this operational work? (ie. the total vatue including GST, materials and fabour)
keg rae oe gan oy . ory - * 2 wee NO,COO -
_Mandatory information — wr

3. Confirm the following mandatory information accompanies this application

   

en. Sones re Seam Stee et same Rote et Bee

 

Confirmation of lodgement} Method of lodgement

Plans, and specifications if applicable, showing the nature and tocation- of the proposed Works (including the
extent ofanycut and ft)2 2. te 9 Loe oe [3 Confirmed 1) Reo

 

 

 

 

 

 

OFFICE USE ONLY ;
Date recéived * Reféfencé numbers ~ ©

 

 

 

 

 

 

Advice for completing Part E

General advice

« Part Amust also be completed for all IDAS development applications.

« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.

 

 

 

 

Qi Adevelopment permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.

 

Page 1

ay

 

|
:

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0077 - Preliminary Building Approval - Garage [As Published].pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.