Council archive · source document
09/0077 - Preliminary Building Approval - Garage [As Published] · 172009.77
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Form 1 Development Application
Part E
Building &/or operational work assessable against a planning scheme
‘Nature of the works’ To
1. (re of work that requires assessment against a planning scheme:
Building work - Complete Table A (J Operational work - Complete Table B
Table A
(i) What is the nature of the building work made assessable in the planning scheme? .
LACAN = COroce) _|
(ii) Are there any current approvals associated wh this application? {e.9. material change of use)
No LO Yes - Provide details below
List of approval reference/s eo . Date approved Date. approval lapses (if known)
[ 4.
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
(1 Roadworks CJ Stormwater C1 Water infrastructure [_] Clearing vegetation under the planning scheme
L) Drainage works — (_] Earthworks LD Sewerage infrastructure
(1 Landscaping CO Signage C1 Other — Specify
(iii) What type of approval is being sought? (NOTE: if you have indicated muttipie operational works in question {i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
(C1 Development Permit (J Preliminary Approval (1) Both (Specify below)
r
(iv) ts the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
CINo (1 Yes - Specify the number of lots being created
(v) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring a tot)
[No (1 Yes - Complete Table B{a)
Table Bia) * -List of approval references - Date approved Date approval lapses (if known)
1.
2. What is the dollar value of this operational work? (ie. the total vatue including GST, materials and fabour)
keg rae oe gan oy . ory - * 2 wee NO,COO -
_Mandatory information — wr
3. Confirm the following mandatory information accompanies this application
en. Sones re Seam Stee et same Rote et Bee
Confirmation of lodgement} Method of lodgement
Plans, and specifications if applicable, showing the nature and tocation- of the proposed Works (including the
extent ofanycut and ft)2 2. te 9 Loe oe [3 Confirmed 1) Reo
OFFICE USE ONLY ;
Date recéived * Reféfencé numbers ~ ©
Advice for completing Part E
General advice
« Part Amust also be completed for all IDAS development applications.
« The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi Adevelopment permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
Page 1
ay
|
:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0077 - Preliminary Building Approval - Garage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.