ATTCH 3 - IR Response - Erosion, Coastal Processes and Stormwater (Dr Trevor Johnson)

Attached to the e-mail RAL17/0501 IR Response email 2 of 4.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Kentynn Pty Ltd Report Number 620.12166-R01

 

Castaways Beach 3 November 2017

Stormwater Management Plan Version v0.1
Page 6

2 HYDROLOGIC ANALYSIS

2.1 Overview

As shown by the topographic data contained in the AJS Surveys Plan in Appendix A, the existing site
generally drains in a westerly direction towards David Low Way, then in a northerly direction along a
gully (on the eastern side of David Low Way), before discharging into Burgess Creek to the north of
the site.

The proposed layout consists of 6 residential allotments (as shown in Appendix A). It is proposed that
each lot is regraded in one of the following ways:

° Scenario 1 — high point at David Low Way, and lot falls to its eastern boundary, or

¢ Scenario 2 — high point near the middle of the lot, and the lot falls both to its eastern and
western boundaries.

A basin (or basins) will be constructed in each lot to intercept the runoff from that lot, ie. at its eastern
boundary for Scenario 1, or at both the eastern and western boundaries for Scenario 2. The total area
of the basin(s) in each lot will comprise the following characteristics:

e Area = 100 m?
« Detention Depth = 300 mm

Each basin will be vegetated, and will act as both a bioretention and detention basin. Further details
on the bioretention basin analysis are contained in Section 3.

The basins are sized so that they can capture and infiltrate the entire volume of runoff from each lot for
all flood events up to the 1% Annual Exceedance Probability (AEP) event, ie. there will be no
overland flow discharged from the site for events less than or equal to the 1% AEP event.

Thus, there will be no discharge of stormwater runoff or associated pollutants to Burgess Creek
following the development.

2.2 Development Layout
The area of each allotment within the development (refer Appendix A) is summarised in Table 1.

Table 1 Allotment Areas

 

 

 

 

 

 

 

 

Lot No. Lot Area Covenant Area Developable Area Building Envelope

(m?) (m*) (m*) (m*)

711 3336 2142 1194 829
712 1219 170 1049 665
713 4211 173 1038 653
714 1143 176 967 567
715 946 209 737 388
716 1819 773 1046 349
Average 1005 575

 

SLR Consulting Australia Pty Ltd

 
Log in to download the original file

ATTCH 3 - IR Response - Erosion, Coastal Processes and Stormwater (Dr Trevor Johnson).pdf · 12.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.