Original source · versioned page text
ATTCH 3 - IR Response - Erosion, Coastal Processes and Stormwater (Dr Trevor Johnson)
Attached to the e-mail RAL17/0501 IR Response email 2 of 4.
The original of this document is very large (12.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
1.50
1.62
1.46
1.43
1.46
FL/
SIGN/
SIGN/
CONSULT AUSTRALIA
Member Firm
[OCR of page images]
CAD FILE->N\@500d5 \853I\ACAD\PLANNING\8531-8.d0g
PLOT DATE-> 06 Nov, 2017-4.40pm
LEGEND
DEVELOPMENT BOUNDARY
Q100 FLOOD LINE
CUT
FILL
RIPARIAN ZONE
VEGETATION LINE
EXISTING CONTOURS
DESIGN CONTOURS
TREE TO BE RETAINED
LAYOUT PLAN
° 15 20
SCALE foe 4500 (A1)
: 7 , DRAWING NUMBER:
© corner SURVEYOR: CLIENT PROIET: ae ee aon Siaaehae PLANNING
DESIGNED:
SERS 2 DAVID LOW War, ee REPARTNERS 8531-B
Seyi of Te De KENLYNN PTY LTD RaW 38 Eee BULK EARTHWORKS FULL Seat
WRITTEN PERMISSION OF SHEEHY CASTAWAYS BEACH 2 [DRIVEWAY REVISED nov'7 | RT Foeckep. PM —DW STRUCTURAL AND CIVIL LAYOUT PLAN 1 2] l l l l
Tee ere coe oa 1 [DRIVEWAY REVISED AND TURNAROUND ADDED | ocT ‘17 | SB Firm HGT)BED9 Seee FaN(O7}898 S659 OF DRAWh
"AMENDMENTS DATE [INTIALS| DATE: JUNE “17 A.C.N.009 899 905 No. OF DRAWINGS:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.