Minor Change Existing Approval - RAL24 0003 01 (As Published) · RAL24/0003.01
Property Access and Driveways
13. A residential driveway must be constructed to Lot 362. The works must be undertaken in
accordance with an Operational Works approval and be generally in accordance with
Callaghan & Toth’s Layout Plan and Longitudinal Section (2251-02, Rev. A) dated 25
October 2023.
14. Vehicle access to Lot 362 is limited to the constructed driveway only. A clause must be
included in the contract of sale for Lot 362 which requires vehicle access to be from the
constructed driveway only, and which prohibits the driveway from being relocated without
Council agreement.
Stormwater Drainage
15. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Services
16. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
17. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
18. Certification must be submitted to Council from all relevant service providers (Energex, NBN)
which certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
19. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
20. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
21. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
22. All future building and civil works carried out on site must be in accordance with the
recommendations contained throughout Tectonic Engineers’ Geo-Environmental
Investigation (23099-001-Rev0) dated 22 May 2023 and any associated addendum listed
within this Decision Notice.
Earthworks and Retaining Walls
23. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Page 4 of 8
Document Set ID: 24023771
Version: 4, Version Date: 13/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - RAL24 0003 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 162 KB (small file)
- File type
No other editions are linked here.