SDA-1116-034770 - 23 Jirrima Crescent - Information request (concurrence agency)
Attached to the e-mail Information request-concurrence agency - MCU16/0099 & OPW16/0218.
SDA-1116-034770
Item Information requested
per cent of the main channel width or that they comply with the self-assessable
code.
- confirm that the culvert crossing and associated erosion protection are installed
at no steeper gradient than the waterway bed gradient
- provide detailed designs showing that there are no drops in elevation at the
joins of the culvert invert, apron and scour protection, and how this will be
maintained for the life of the crossing
- confirm which is applicable: The culvert will be buried a minimum of
300millimetres to allow bed material deposit and reform the natural bed on top
of the culvert base, or; The base of the culvert is the stream bed, or; The base
of the culvert cell is roughened throughout the culvert floor to simulate natural
bed conditions.
- Please indicate if any baffles or other roughening elements are to be used
6. PO25 All waterway barriers are designed, constructed and maintained to
provide adequate fish passage for the site and fish passage is provided for the
life of the barrier.
Please detail how fish passage will be maintained with particular reference to
expected or modelled hydraulic conditions from the downstream to the upstream limit
of the crossing.
Please confirm through providing plans that the culvert design will comply with the
design provisions of the self-assessable code WWBW01- Part 3 Culvert Crossings. If
the plans are not in line with the self-assessable code;
- please detail how hydraulic conditions over the barrier will allow for fish
passage over all flow conditions.
- how water quality across the barrier will allow for fish passage.
Under section 278 of the act, when responding to this request you must advise whether you
are supplying all of the information requested, part of the information requested, or none of
the information requested. If you are supplying part or none of the information requested, you
are also required to provide written notice asking the department to proceed with the
assessment of the application.
The due date for receipt of this information is 6 months after the day you receive this request.
If necessary you may request an extension to this period. Unless a response to this request
for further information has been received from you within this period or any extension during
this period, your application will lapse.
A pro forma is attached to this notice to assist you in providing an information request
response which complies with the requirements of the act.
Please be advised that the application will be assessed on the basis of the information
provided. It is therefore recommended that you respond to all of the information requested by
the department. Further details regarding the information request response period and the
lapsing of development applications are set out in sections 279 and 280 of the act.
Your response to the information request must be submitted to the department through
MyDAS or alternatively emailed to [email protected] the department is a concurrence agency, you must also give a copy of the information
request response to the assessment manager under section 278(2) of the act.
Department of Infrastructure, Local Government and Planning Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.