Original source · versioned page text
2021-03-09 P&E Agenda - Item 8 - Attachment 1 - Climate Change Response Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnencourage staff to walk, cycle, use public transport, scooter and carpool to work and promote
multiple health and environmental benefits for staff.
Strategic Priorities
The following strategic priorities are identified for Sustainable Transport:
4.1 Accelerate public and active transport infrastructure investment and community usage through
the implementation of Council’s Transport Strategy and Walking and Cycling Plan.
4.2 Transition Council to sustainable transport use and zero-emissions vehicles.
Specific actions for implementation through this Climate Change Response Plan are identified in the
Summary of Actions.
Desired outcomes/Targets
By 2026, electric vehicle charging stations will be installed at all major Council facilities.
By 2030, electric vehicle charging infrastructure will be available at all major shopping villages
Metrics
% modal shift to walking and cycling in key urban areas and in hinterland towns
% increase of children walking and riding to school
% increase in electric micro-mobility devices/e-wheeling devices (e-bikes, e-scooter, e-
skateboards etc.) in use by residents and visitors Impact
% increase in public transport use
% increase in electric vehicle ownership
kms of sealed cycling and walking pathways
Number of EV charging stations in Noosa Shire
Number of EV charging stations installed at Council facilities
Number of staff that participate in walk/cycle-to-work day
Electric vehicle infrastructure factored into development requirements
Partnerships
Accelerating sustainable transport requires strong advocacy and partnerships with government
agencies and transport providers including Translink to future proof Noosa and connect
communities. Council will continue to work with other community partners such as ZEN Inc and
Tourism Noosa to help drive positive change.
26
Noosa Climate Change Response Plan - draft for council endorsement March 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.