Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2021-03-09 P&E Agenda - Item 8 - Attachment 1 - Climate Change Response Plan

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                              help development responses to urban heat impacts in                                              (subject to
                                              Noosa.                                                                                           budget)

                                             Continue to update Noosa Plan 2020 planning scheme            Climate change and heat risks     Year 2
                                              to manage the impacts of climate change on buildings           factored into land use planning
                                              and public spaces including heat mitigation
                                                                                                            Number of Council buildings
                                              requirements.
                                                                                                             that achieve a 5 Star or above
                                                                                                             under the Green Building
                                                                                                             Council of Australia rating
                                                                                                             scheme.

                                             Advocate through LGAQ and the State for state policy          Whether action is completed       Year 2
                                              and guidelines that provide a minimum standard for
                                              designing buildings to reduce urban heat risks.

                                             Prepare a Socio-economic impact hazard assessment             Whether action is completed       Year 1
                                              of flooding and inundation including survey of building
                                              stock vulnerability (floor heights, building types and                                           (funded in
                                              materials) to provide a business case for risk mitigation.                                       2020/21
                                                                                                                                               budget)
                                              This will also inform wind vulnerability assessment by
                                              Geoscience Australia.

                                             Prepare localised modelling and concept design of             Whether action is completed       Year 2
                                              inundation hazard reduction measures for
                                              Noosaville/Noosa Heads area (e.g. flood levy,                                                    (subject to
                                              landscape design, stormwater improvements). Linked                                               budget)
                                              to Coastal Hazards Adaptation Plan.



 7.2 Build Council and community             Provide best available hazard information and update          Whether action is completed       Ongoing
 awareness and preparedness for               design guidelines and capital works procedures for


                                                                                                                                                             45
Noosa Climate Change Response Plan - draft for council endorsement March 2021
Log in to download the original file

2021-03-09 P&E Agenda - Item 8 - Attachment 1 - Climate Change Response Plan(PDF, 2MB).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.