Referral Agency Response - Planning RAP25 0023 (As Published) · RAP25/0023

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                                                                   Officer:            Andrew Gaffney
                                                                                   Direct Telephone:   07 5329 6245
                                                                                   Our Reference:      RAP25/0023
                                                                                   Your Reference:     n/a

                 30 January 2026


                 TM Russell & GT Russell
                 C/- Pivotal Perspective Pty Ltd
                 3/93 Hilton Tce
                 TEWANTIN QLD 4565
                 [email protected]



                 Dear Sir/Madam,
                                              Referral Agency Response
                                                      Planning Act 2016

                 I refer to your application and advise that Council, as a referral agency for the application,
                 completed its assessment of the application on 28 April 2025. You are advised that Council
                 requires conditions to be attached to any development approval. The conditions are listed
                 below.
                 1.      APPLICATION DETAILS

                      Application No:           RAP25/0023

                      Street address:           6 Mermaid Quay, Noosaville Qld 4566

                      Real property description: Lot 120 RP 842150

                      Planning Scheme:          Noosa Plan 2020 (25 September 2020)

                 2.      TYPE OF DEVELOPMENT

                 •     The applicant seeks an early Referral Agency Response for Additions to Dwelling House
                       (Structures within the Revetment Wall Setback)
                 3.      TIME LIMIT FOR MAKING FURTHER APPLICATION

                 Pursuant to section 54(4) of the Planning Act 2016, you will not be required to refer your
                 building works application to council for a further Referral Agency Response if:
                 •     you submit this Referral Agency Response in its entirety, including all referenced plans
                       and documents, when making the application to the Assessment Manager; and
                 •     there are no changes to the proposal that was presented to council with this referral;
                       and
                 •     The development application to the assessment manager is made within 1 year of the
                       date of this referral agency response.




                 ABN 97.969.214.121                                                              PO Box 141
                 noosa.qld.gov.au                                                         Tewantin QLD 4565
                 [email protected]                                                         07 5329 6500
                                                                                                         Page 1 of 5
Document Set ID: 24491999
Version: 3, Version Date: 30/01/2026
Full text of the other 4 pages

Page 2

                 4.     REFERRAL AGENCY CONDITIONS

                        When Conditions must be Complied With
                 1.     Unless otherwise stated, all conditions of this referral response must be complied with
                        prior to the use of the works commencing, and then compliance maintained at all times
                        while the use continues.
                        Approved Plans
                 2.     Development authorised by this approval must be undertaken generally in accordance
                        with the Approved Plans listed in the table below.

                          Plan No.     Rev. Plan/Document Name                                      Date

                          5.2          A      Hardscape Dimensions – Canal prepared by 09/06/2025
                                              Reitsma - Annotated by Council

                          6.4          A      Proposed Elevation 04 - Southern Aspect prepared 09/06/2025
                                              by Reitsma

                          7.2          A      Section 02 prepared by Reitsma                        09/06/2025

                        Lighting Amenity
                 3.     No flood lighting must be used on site. Any vertical illumination resulting from direct,
                        reflected or other incidental external lighting emanating from the site must not exceed 8
                        lux when measured at any point 1.5 metres outside the boundary and at any level from
                        ground level upward.
                        Noosa Waters Setback
                 4.     The area within 4.5 metres of the centre line of the top of the concrete revetment wall
                        must be developed in accordance with the following:
                        a.      a minimum of 25% of the area must be planted with shrubs and small trees with a
                                mature height of 3m or less.
                        b.      a maximum of 25% of the area may be impervious, with the balance area soft
                                landscaping (i.e. grass, ground covers, shrubs and small trees).
                        c.      the ground surface within 1 metre of the revetment wall must be grass or ground
                                cover and must not include shrubs or hard pavement.
                        d.      any side boundary fencing must taper down to a maximum height of 1.2 metres at
                                the revetment wall and have a height not exceeding 1.5 metres at a distance of
                                2.25 metres from the revetment wall.
                        e.      any retaining structures, planter boxes or the like must be finished with natural
                                materials such as timber or rock rather than manufactured materials.
                 5.     No shore side anchor points are permitted within 4.5m of the revetment wall.




                                                                                                           Page 2 of 5
Document Set ID: 24491999
Version: 3, Version Date: 30/01/2026

Page 3

                        Bonds
                 6.     A site compliance bond of $5,000 is to be submitted to Council prior to the
                        commencement of works. The commencement of works can only commence once
                        Council's Construction Engineering Officer has confirmation that the bond monies have
                        been received by Council.
                        The bond will be refunded less any costs incurred by Council in ensuring compliance
                        with these conditions or any additional inspections incurred for substandard work or work
                        undertaken not in accordance with this permit.
                 7.     Bonds must:
                        a.      meet the requirements of council’s relevant Planning Scheme Policy for
                                performance and uncompleted works;
                        b.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                        c.      be requested for release by writing to Council, when relevant approval
                                requirements have been met.
                        Earthworks
                 8.     All earthworks and associated retaining structures/batters must be contained entirely
                        within the subject site unless written permission from the respective landowner(s) is
                        provided to Council. All earthworks must be undertaken in accordance with the
                        provisions of Australian Standard AS3798: Guidelines on Earthworks for Commercial
                        and Residential Developments.
                 9.     Earthworks carried out on site must not affect the structural integrity of the revetment
                        wall, existing fences or other structures that border the subject site. Fences that are
                        affected must be replaced in a timely manner and in consultation and agreement of the
                        owners of the related properties.
                        Landscaping
                 10.    Where excavations result in a cut face greater than 0.5m, suitable landscaping is to be
                        installed to soften the visual impacts of the excavations to the Noosa Waters’ Canal for
                        the full length of the cut face. Landscaping is to be of a suitable species and in
                        accordance with Noosa Plan 2020 Planning Scheme Policy PSP2 Landscaping.
                        Revetment Wall / Flood Storage
                 11.    All works within the 4.5m setback from the revetment wall must be carried out generally
                        in accordance with:
                        a.      SCG Consulting’s Existing & Proposed Site Plan (0447 – OW1.1, Rev. A) dated
                                24 April 2025.
                 12.    All works for the purpose of increasing available flood storage must be located within
                        the 4.5m setback from the revetment wall.




                                                                                                         Page 3 of 5
Document Set ID: 24491999
Version: 3, Version Date: 30/01/2026

Page 4

                 13.     Certification of the completed works within the 4.5m setback from the revetment wall
                         must be submitted to Council within 3 months of the completion of the works. The
                         certification must be prepared by a RPEQ (Registered Professional Engineer of
                         Queensland) and state that the works:
                         a.      have not reduced the amount of available flood storage within the 4.5m setback
                                 from the revetment wall;
                         b.      have not negatively impacted the stability of the revetment wall or negatively
                                 impacted the associated membrane;
                         c.      have not reduced the available flood storage within the lot from the profile as
                                 described in The Noosa Plan 2020 – Low Density Residential Zone Code; and
                         d.      meet the relevant conditions of this approval.
                         Stormwater Drainage
                 14.     Stormwater runoff from the development must be disposed of on-site without causing
                         scour or damage to the subject site or any adjoining property.
                         Damage to Services and Assets
                 15.     Any damage caused to existing services and assets as a result of the development
                         works must be repaired at no cost to the asset owner at the following times:
                         a.      Where the damage would cause a hazard to pedestrian or vehicle safety,
                                 immediately; or
                         b.      Where otherwise, upon completion of the works associated with the development.
                         Any repair work which proposes to alter the alignment or level of existing services and
                         assets must first be referred to the relevant service authority for approval.
                 5.      REASONS FOR REFERRALN AGENCY’S DECISION

                 The proposal is subject to specific built form parameters outlined in The Noosa Plan (25
                 September 2020).
                 6.      REFERENCE DOCUMENT

                      Plan No.           Rev. Plan/Document Name                                      Date

                      0447 – OW1.1       A      Existing & Proposed Site Plan prepared by SCG 24 April 2025
                                                Consulting

                 7.      ADVISORY NOTES

                 The following notes are included for guidance and information purposes only and do not form
                 part of the referral agency conditions:
                         Aboriginal Cultural Heritage Act 2003
                 1.      There may be a requirement to establish a Cultural Heritage Management Plan and/or
                         obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                         The ACH Act establishes a cultural heritage duty of care which provides that: “A person
                         who carries out an activity must take all reasonable and practicable measures to ensure
                         the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply
                         with the duty of care. Substantial monetary penalties may apply to individuals or
                         corporations breaching this duty of care. Injunctions may also be issued by the Land
                         and Resources Tribunal, and the Minister administering the ACH Act can also issue stop




                                                                                                             Page 4 of 5
Document Set ID: 24491999
Version: 3, Version Date: 30/01/2026

Page 5

                        orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
                        the cultural heritage value of Aboriginal cultural heritage.
                        You should contact the Cultural Heritage Unit to discuss any obligations under the ACH
                        Act.
                        Equitable Access and Facilities
                 2.     The plans for the proposed building work have NOT been assessed for compliance with
                        the requirements of the National Construction Code - Building Code of Australia (Volume
                        1) as they relate to people with disabilities. Your attention is also directed to the fact
                        that in addition to the requirements of the National Construction Code as they relate to
                        people with disabilities, one or more of the following may impact on the proposed
                        building work:
                        a.      the Disability Discrimination Act 1992 (Commonwealth);
                        b.      the Anti-Discrimination Act 1991 (Queensland); and
                        c.      the Disability (Access to Premises – Buildings) Standards.
                        Development Compliance Inspection
                 3.     Prior to the commencement of the use, please contact Council's Development
                        Assessment Branch to arrange a Development Compliance Inspection.
                        Performance Bond Agreement
                 4.     An applicant for a development application may make an agreement with an assessment
                        manager, referral agency or other person to establish the responsibilities, or secure the
                        performance, of a party to the agreement about a development condition.
                        Sustainability
                 5.     Council encourages sustainable and energy efficient building design for all development,
                        including the use of sustainable building materials, energy efficient fittings, solar hot
                        water, photovoltaic systems (including the use of inverter/charges), solar panels, water
                        saving devices and rainwater harvesting.
                 8.     REPRESENTATIONS ABOUT REFERRAL AGENCY RESPONSE

                 Not applicable

                 Yours faithfully,
                 Andrew Gaffney
                 Senior Development Planner | Development Assessment
                 Development & Regulation


                 Enc:   Approved Plans/Documents




                                                                                                           Page 5 of 5
Document Set ID: 24491999
Version: 3, Version Date: 30/01/2026

Used in these records

About this file

File size
117 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referral Agency Response - Planning RAP25 0023 (As Published).pdf · 117 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.