ORDINARY MEETING MINUTES 29 MAY 2014
(d) Provision to cater for the stormwater runoff from the adjoining properties and
roads that drain through the site, including registration of drainage easements
(e) All structures including infiltration pits, level spreaders etc, located within the
developable area of the site and clear of the area to be dedicated as Park.
52. All buildings proposed on site must be constructed to comply with Council’s Minimum
Floor Height requirements at the time of issue of the Building Permit.
Electricity and Telecommunication Services
53. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
54. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
55. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
56. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
57. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
58. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council. All earthworks
must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
59. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Acid Sulfate Soils
60. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person
and referenced in a Development Permit for Operational Works. In this regard
appropriate testing and supporting documentation prepared by a suitably qualified
specialist must be submitted to Council for approval prior to obtaining a Development
Permit for Operational Works.
This is not an official copy of Council’s Minutes
Page 13 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.