Revised DA Form 5 RE_ OPW24_0125_01 Minor Change Application for 100 Cooyar & 100 Eenie Creek Rd NOOSA HEADS_.msg
Subject: RE: OPW24/0125.01 Minor Change Application for 100 Cooyar & 100 Eenie Creek Rd NOOSA HEADS. From: Bryan Ward Date: 2025-05-01T00:17:37+00:00 To: Daniel Epps, Justine Elder, Mailbox Council Mail CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Hi Daniel / Justine Please find attached for your records. * Revised Form 1 with correct address * Payment remittance for current Minor Change Fees per below information I trust this now closes out all requirements for this change. Let me know asap if you require any additional information. Can you please confirm we can now receive the proposed “Letter of Support” for the works by COB tomorrow to enable us to commence the civil works on site Tuesday 06/05/25. cheers Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251102068%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=PtbPUArwo%2Bwa9FjdSlRFd8%2BbGmsI6g8w4kPQykbbbQA%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251131521%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=4143DdkQ1To%2BNTY9bZd1Sq8%2BHfM1lppF0ld9hR2%2FGCk%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Justine Elder <[email protected]> Sent: Wednesday, 30 April 2025 4:48 PM To: Bryan Ward <[email protected]> Cc: Daniel Epps <[email protected]> Subject: OPW24/0125.01 Minor Change Application for 100 Cooyar & 100 Eenie Creek Rd NOOSA HEADS. You don't often get email from [email protected] <mailto:[email protected]> . Learn why this is important <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FVzqpCBNq04F73L3lfzfGf279FZ%3Fdomain%3Daka.ms&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251145182%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=5T2jk80TKeAp1sHVrLldg9tw6IkDm4eQsXJDCURR2Ug%3D&reserved=0> Good afternoon, Thank you for your application, the DA Form 1 requires a minor amendment, PART 2 Location Details 3.1) a) ”80” Cooyar Street – this should be “100”. Please amend your form and return to [email protected] <mailto:[email protected]> at your earliest convenience. It is ok to cc me into the email. The application has been processed with file no OPW24/0125.01. The fees outstanding are $1376.00 and these can be paid online by credit card following the link below or by cheque. https://noo-web.t1cloud.com/T1PRDefault/WebApps/eProperty/P1/ePay/ApplicationPayment.aspx?r=P1.WEBGUEST&f=%24P1.EPY.APPS.ENQ IMPORTANT NOTE Online payments have a delay in processing payments. Therefore, to capture payments within the specified timeframe and to avoid an Action Notice being issued, please respond to this email once you have completed your payment with a copy of your receipt. Regards, Justine Elder Administration Officer - Development Assessment Phone: (07) 5329 6500 [email protected] <mailto:[email protected]> | noosa.qld.gov.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FhJ-NCD1vn4i5Q8QOU5hmfjK4Ic%3Fdomain%3Daus01.safelinks.protection.outlook.com&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251158566%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=5Ltq2wGdcqCrQ91XxOqEbn2mBuNm9YNyATabgusbar8%3D&reserved=0> Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. Please consider the environment before printing this email From: Bryan Ward <[email protected] <mailto:[email protected]> > Sent: Thursday, April 17, 2025 2:18 PM To: Daniel Epps <[email protected] <mailto:[email protected]> >; Leigh Stegeman <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> >; [email protected] <mailto:[email protected]> Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Hi Daniel / Planning Department Please find attached the completed Form 5 as requested and a copy of the owner’s consent. Also find attached the previously issued email from the 10/04/25, containing the relevant revised civil documentation relating to the attached Form 5. Can you please advise when we might see the payment link come through for the Minor Change fee. I believe everything required is attached but, please advise asap if there is any additional information required. cheers Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251171329%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=rJLnH8M%2FUHzq%2F9Pob9pZ2Wnih37qE%2FBOcu188IAFd74%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251184051%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Eau7ZWKIG6I%2FPSwEJhUE%2FKchcErQ4zGSXR72oTqINaA%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Daniel Epps <[email protected] <mailto:[email protected]> > Sent: Thursday, 17 April 2025 10:03 AM To: Bryan Ward <[email protected] <mailto:[email protected]> >; Leigh Stegeman <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> >; [email protected] <mailto:[email protected]> Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail Hi Bryan & Leigh, Thanks for the below. The revised drawings are generally acceptable to Council and align with what we’ve discussed below. As discussed, Council is willing to allow the ongoing works while concurrently assessing the Minor Change application to the Operational Works approval (OPW24/0125). Please note that the Minor Change application must be lodged, and fees paid prior to Council issuing a ‘Letter of Support’ and the commencement of your works. To lodge the Minor Change, please submit the completed “DA Form 5” (attached) and associated material to [email protected] <mailto:[email protected]> – please CC [email protected] <mailto:[email protected]> and myself – and see that the fee is paid. The fee for a Minor Change is $1,376.00 – a payment link will be sent once the DA Form 5 is received. Please note that I will on leave returning Monday 28th. If you wish to discuss, please give me a call. Regards, Daniel Epps Senior Development Engineer – Development and Regulation Phone: 5329 6223 [email protected] <mailto:[email protected]> | noosa.qld.gov.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F78yaCJyBw5hqPjPQCvtKfyDwWw%3Fdomain%3Dnoosa.qld.gov.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251196394%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=96Up04IY6TuFTw02PrPKE%2FL5gpJKF6I8%2FEGeiewvhAA%3D&reserved=0> From: Bryan Ward <[email protected] <mailto:[email protected]> > Sent: Thursday, April 10, 2025 6:27 PM To: Daniel Epps <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> >; Ben Luck <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> >; Hayden Ross <[email protected] <mailto:[email protected]> >; [email protected] <mailto:[email protected]> ; Leigh Stegeman <[email protected] <mailto:[email protected]> >; Aaron Shuttleworth <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Hi Daniel Find attached updated civil drawings for your review and approval following our recent discussions and sketch issue. In response to your 5 items mentioned below in the previous email thread. Please see my further comments in orange for your review and approval. I believe the attached should now satisfy all the below items. Please let me know if you require any additional information. Can you please confirm at your earliest an approval for us to proceed with the fire trail civil works and that this can happen concurrently with the Minor Change approval being completed. Cheers Item 1 – Bushfire Cert Satisfied with Josh’s certification. – Item confirmed as satisfied. Item 2 – Subgrade & Design CBR Council reserves concerns about the subgrade of the trail and how the trail will handle future construction activities, especially when catering for heavy vehicles. Council appreciates STP’s comments. However, the Fire Access Trail will become Council’s asset. A Proof Roll will be required prior to the installation of the cellular gravel and upon completion of the works. Please confirm this is acceptable. * Following your phone conversation with Leigh Stegman from STP on 7.04.25 & the follow up email (attached). It has been advised by Leigh that a proof roll cannot be completed prior to the install of the Geocell. Per the changes noted on the revised drawings, a proof roll will be completed after the gravel fill of the Geocell and another proof roll completed at “on-maintenance” of the fire trail. Item 3 – Rock Armouring The amended extent of Rock Armouring has been reduced by ~10% (100m2). As discussed, it’s reasonable to rock armour the batters adjacent to the crossings or where turf is not practical. The extended area “reviewed on site” should be minimised to “only where necessary” to ensure the areas that can be turfed, are turfed. As part of the change application, I believe a condition to similar to the following may be applied “The final extent of the rock armouring to be determined on site, with rock armouring minimised only to locations where turfing would likely limit the ability for long-term stabilisation and future maintenance. Prior to the acceptance of On Maintenance, RPEQ certification must be provided to Council certifying that rock armouring has only been installed where turf would limit the ability for long-term stabilisation and future maintenance.”. Please provide revised drawings confirming the above. * Rock armour & turf has been revised on the current drawings. Per our site walk with yourself and as reflected on the recently issued mark-up there is a reduction in rock and addition of turf. Item 4 – Alignment of Fire Access Trail It was discussed that the alignment of the Fire Access Trail would be realigned to be parallel with the property boundary following the loss of the existing vegetation that was previously being protected. Please provide revised drawings with this change. * Fire trail has been re-aligned on the revised drawings. This is as per our recent discussions and aligns with the approx. relocation shown on the mark-up and per the advice from the Arborist Consultants report previously issued to Council. Item 5 – Rock Armouring vs. Mower Access It was discussed that a concrete access driveway was to be installed adjacent to Crossing 1 to allow for a Mower to access the turf. The extent of this concrete access driveway is unclear. Please provide revised drawings that delineates the two uses – rock armouring for the crossing and concrete access driveway. The extent of the concrete access driveway is to be left to a minimum (i.e., the minimum to accommodate a mower). * The concrete driveway access for the mower is indicated on the revised drawings. It has been kept to a minimum as discussed to allow minimum access required for the mower. Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251209463%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=RXBwBCsoAsapqBEj7ji%2FgfrIxORiep5Rj0LpjYmkLjU%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251229862%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=kQRARCTJ9joN0ILsd00ewAkNio4WRa%2FNLO14ha7Mhlg%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Daniel Epps <[email protected] <mailto:[email protected]> > Sent: Monday, 7 April 2025 1:33 PM To: Bryan Ward <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail Hi Bryan, As discussed – generally comfortable with the proposed changes. Please confirm with STP if the 2100mm concrete mower access can be relocated against the toe of the fire access trail batter without causing adverse effects to the stormwater regime on site. Regards, Daniel Epps Senior Development Engineer – Development and Regulation Phone: 5329 6223 [email protected] <mailto:[email protected]> | noosa.qld.gov.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F78yaCJyBw5hqPjPQCvtKfyDwWw%3Fdomain%3Dnoosa.qld.gov.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251248054%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=VLyVQLoBsafjzBfk%2ByX2Ix4Ki90szHuB9NUvymmqD9o%3D&reserved=0> From: Bryan Ward <[email protected] <mailto:[email protected]> > Sent: Monday, April 7, 2025 1:25 PM To: Daniel Epps <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251263412%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=U%2BTC4eRkLFSRN64%2BBSLI0aXT4s%2Fc8f1kOD7qqFEYPOc%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251276605%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=c49uSWyNE%2Fl0VHMytlnXJm0TCNVMt%2F%2F92fkiKYPzr8E%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Bryan Ward <[email protected] <mailto:[email protected]> > Sent: Monday, 7 April 2025 1:21 PM To: Daniel Epps <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail Hi Dan See the attached mark up for discussion. I will call to discuss. cheers Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251289691%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=W4TioL3uOvxzoL%2FmASQ730QTHI6OM%2BP%2F3pgueWW2Ons%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251302969%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=A1i89zEJfIF6ITI5UIycvm9cL4rWKXB6OPpFD7diz1s%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Daniel Epps <[email protected] <mailto:[email protected]> > Sent: Friday, 4 April 2025 1:57 PM To: Bryan Ward <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail Hi Bryan, Thanks for sending through the below. Please see Council’s comments. Item 1 – Bushfire Cert Satisfied with Josh’s certification. Item 2 – Subgrade & Design CBR Council reserves concerns about the subgrade of the trail and how the trail will handle future construction activities, especially when catering for heavy vehicles. Council appreciates STP’s comments. However, the Fire Access Trail will become Council’s asset. A Proof Roll will be required prior to the installation of the cellular gravel and upon completion of the works. Please confirm this is acceptable. Item 3 – Rock Armouring The amended extent of Rock Armouring has been reduced by ~10% (100m2). As discussed, it’s reasonable to rock armour the batters adjacent to the crossings or where turf is not practical. The extended area “reviewed on site” should be minimised to “only where necessary” to ensure the areas that can be turfed, are turfed. As part of the change application, I believe a condition to similar to the following may be applied “The final extent of the rock armouring to be determined on site, with rock armouring minimised only to locations where turfing would likely limit the ability for long-term stabilisation and future maintenance. Prior to the acceptance of On Maintenance, RPEQ certification must be provided to Council certifying that rock armouring has only been installed where turf would limit the ability for long-term stabilisation and future maintenance.”. Please provide revised drawings confirming the above. Item 4 – Alignment of Fire Access Trail It was discussed that the alignment of the Fire Access Trail would be realigned to be parallel with the property boundary following the loss of the existing vegetation that was previously being protected. Please provide revised drawings with this change. Item 5 – Rock Armouring vs. Mower Access It was discussed that a concrete access driveway was to be installed adjacent to Crossing 1 to allow for a Mower to access the turf. The extent of this concrete access driveway is unclear. Please provide revised drawings that delineates the two uses – rock armouring for the crossing and concrete access driveway. The extent of the concrete access driveway is to be left to a minimum (i.e., the minimum to accommodate a mower). Please see that the above items are actioned prior to Council agreeing to the proposed change. Feel free to give me a call to discuss if required. Regards, Daniel Epps Senior Development Engineer – Development and Regulation Phone: 5329 6223 [email protected] <mailto:[email protected]> | noosa.qld.gov.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F78yaCJyBw5hqPjPQCvtKfyDwWw%3Fdomain%3Dnoosa.qld.gov.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251315603%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=2tID2BMTTtA6Ae5OhC9y1g9O1eFMVu8rRXkDV8ayQGY%3D&reserved=0> From: Bryan Ward <[email protected] <mailto:[email protected]> > Sent: Thursday, March 27, 2025 11:05 AM To: Daniel Epps <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Hi Daniel See below responses in red to your quires from our site walk last week. I have also attached the response emails from the guys. See also attached the final mark-up of the revised verge treatments. There was one additional change to include a concrete slab in lieu of the stone to allow the ride on mower to cross over to the grassed area. Please confirm this closes out the current issues and that we are good to proceed with the civil works to the trail. Come back to me if you require any additional information. cheers Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251328153%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=%2FRILarQV411ogrzyJGRzTp5qqSSjLUL4lSWtJ4aU4w8%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251340264%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=SAUZlJpApLDMPjvVRskHh%2FSnOPwboVZ8nJrw329Qceg%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Daniel Epps <[email protected] <mailto:[email protected]> > Sent: Friday, 21 March 2025 2:22 PM To: Bryan Ward <[email protected] <mailto:[email protected]> > Cc: Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail Hi Bryan and Jayde, Council is currently underway with reviewing the proposal. As discussed today, additional information is required to address the issues identified by Council. Please provide a response to the following issues as we discussed on site today. 1. It is unclear if the granular gravel cells achieve the fire rating requirements. It is recommended that a comment by Josh Lee is included in your response that addresses the suitably of the cells with respect to the bushfire requirements. I have reviewed the proposed Neoloy tough cell product and its proposed application in the Ozcare Fire trail and am of the opinion it does not compromise the necessary low threat separation required between the buildings and adjacent hazardous vegetation. I understand the product is a polymeric nano-composite alloy in a honeycomb design set a min of 50mm beneath the non-flammable fire trail surface. It will be infilled with non-flammable gravel and overlaid with non-flammable fire trail compressed aggregate hence has no direct exposure to flame contact. The arrangement of the cell walls in a honeycomb design and in a vertical plane set a minimum of 50mm beneath the fire trail surface offers limited exposure to any potential radiant heat penetration through the fire trail surface should it occur. Furthermore, the product would be aligned parallel to the building rather than perpendicular hence it does not represent a direct conduit toward the building should it unforeseeably ignite, which again is considered highly unlikely. Should you have any queries regarding this matter please do not hesitate to contact me. Regards, Joshua Lee - Director 2. Council have concerns about the potential impacts a subgrade replacement will have on the availability of subsurface disposal and the conveyance of flow. STP have assumed a design CBR of 5%. Based on previous and today’s inspection(s), Council is concerned that CBR 5 may be unachievable without a subgrade replacement. It is recognised that the DCP testing logs provided today (21/03) suggest a CBR of 8-10 currently exists. It is recommended that STP Consultants provide additional detail on the likelihood of a subgrade replacement, what that treatment may be, and what impacts that treatment may have on subsurface disposal and the conveyance of flow. Its design based on photos and our site visit, the site is sand so even saturated sand will return CBR values that are higher than the soft material you see. This product at this depth will work for CBR 2%. If it gets lower than that then we would need to review the design with Geocell. 3. Council believes the extent of the rock armouring in the 5m buffer zone (i.e., along the Giraween side of the trail) is excessive and varies from the original intent of the approval and Infrastructure Agreement (to provide a more ‘natural’ treatment). Notwithstanding that parts of the trail require armouring due to poor soil and constant flow, the extent of armouring needs to be reduced in sections that can be treated in more ‘natural’ means (i.e., topsoil replacement and turfing). As discussed, providing rock armouring either side of the crossings is considered reasonable subject to confirmation regarding weed matting. It is recommended that an amended design is provided to Council that reduces the amount of rock armouring and includes commentary from STP Consulting around long-term stabilisation and ability to ensure ongoing maintenance by OzCare. Suggested amendment attached – so ride on mower can access. Reduction in stone and addition of turf. Small section of stone at North end replace with a slab for ride on mower access. Once these items are resolved, Council can begin discussions to allow for the assessment of the Minor Change concurrently with the works on site. Regards, Daniel Epps Senior Development Engineer – Development and Regulation Phone: 5329 6223 [email protected] <mailto:[email protected]> | noosa.qld.gov.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F78yaCJyBw5hqPjPQCvtKfyDwWw%3Fdomain%3Dnoosa.qld.gov.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251352683%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=%2FigN745UlHLQQxm8qOAKXAI3iEFO6347E3b%2BMVnkIlA%3D&reserved=0> From: Bryan Ward <[email protected] <mailto:[email protected]> > Sent: Friday, 14 March 2025 2:57 PM To: Daniel Epps <[email protected] <mailto:[email protected]> > Cc: Troye Gibbs <[email protected] <mailto:[email protected]> >; Tony Barnett <[email protected] <mailto:[email protected]> >; Aaron Shuttleworth <[email protected] <mailto:[email protected]> >; Joshua Lee - North Coast Environmental Services <[email protected] <mailto:[email protected]> >; Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> >; Leigh Stegeman <[email protected] <mailto:[email protected]> >; Ben Luck <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Hi Daniel As discussed previously, please find attached the revised Civil design drawings for the Fire Trail at Ozcare Noosa for your review and comment. Please pass onto the relevant people internally for review and comment. Per our previous discussion, we would like to investigate with Council the opportunity to commence the revised civil works on site while concurrently completing the Minor Change approval that will be required. Can you please come back to us asap with confirmation or touch base with Myself or Leigh if you have any queries or require any additional information. cheers Kind Regards, Bryan Ward Project Manager This message doesn’t require your attention outside of normal working hours. Feel free to read and respond during your regular working hours. 1300 WOOLLAM (1300 966 552) | +61 407 129 271 [email protected] <mailto:[email protected]> woollamconstructions.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F-2WECE8wo4I3KZK6Upi1f7aIit%3Fdomain%3Dwoollamconstructions.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251365142%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=lx%2BGpAGePeEo4g4Gcx%2BWyeswxA2%2FFxlBX6bn1filJA0%3D&reserved=0> | woollamservices.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F1toWCGv0q4F1ozoLUQsRfBEa73%3Fdomain%3Dwoollamservices.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251380500%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=8EvdMxyUsENmbtov5HOsUbSHzt2lu7NYkREiEmRaIJs%3D&reserved=0> 71 Lytton Rd East Brisbane QLD 4169 | PO Box 7154 East Brisbane QLD 4169 Woollam acknowledge the First Nations people as the original inhabitants of Australia. We pay our respects to the Traditional Custodians of this land and acknowledge all Elders past, present and future. From: Daniel Epps <[email protected] <mailto:[email protected]> > Sent: Tuesday, 18 February 2025 1:23 PM To: Leigh Stegeman <[email protected] <mailto:[email protected]> > Cc: Bryan Ward <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> >; Tony Barnett <[email protected] <mailto:[email protected]> >; Aaron Shuttleworth <[email protected] <mailto:[email protected]> >; Joshua Lee - North Coast Environmental Services <[email protected] <mailto:[email protected]> >; Will Lowe <[email protected] <mailto:[email protected]> >; Jayde Littman <[email protected] <mailto:[email protected]> > Subject: RE: STP24-0253 - Ozcare Noosa Fire Trail Hi Leigh, Thanks for the call today. Council is of the opinion that a Minor Change is required given the nature of the change for work on Council owned land. Given the timeliness and sensitivity of the work, Council may be willing to agree to process and assess any future change application concurrently with the ongoing physical works. This will require confirmation from management and review of the Infrastructure Agreement – I will begin those discussions. After a review of the concept sketch, the proposed amended design appears to be reasonable as an engineering outcome but will require further assessment once a detailed design has been prepared. Understanding that the proposal appears to be a reasonable engineering outcome, the proposed amendment does vary from what was originally approved. This includes substituting a gravel access track with minimal infrastructure (i.e., concrete causeway) to concrete culverts, headwalls, rock scour protection and geocells in Council’s nature reserve. This carries additional maintenance responsibilities that will require additional consideration from Council and may potentially require amendments to the Infrastructure Agreement to ensure these responsibilities are captured appropriately. It is strongly recommended that this detailed design is prepared for Council to review as soon as possible and includes commentary from Joshua Lee regarding how the design complies with the bushfire requirements. Regards, Daniel Epps Senior Development Engineer – Development and Regulation Phone: 5329 6223 [email protected] <mailto:[email protected]> | noosa.qld.gov.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F78yaCJyBw5hqPjPQCvtKfyDwWw%3Fdomain%3Dnoosa.qld.gov.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251394069%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=BwCCSSojvfHl9Sr9shq8KbkRbmZb%2FeE3oOoC%2FA0b%2ByE%3D&reserved=0> From: Leigh Stegeman <[email protected] <mailto:[email protected]> > Sent: Tuesday, 18 February 2025 10:45 AM To: Daniel Epps <[email protected] <mailto:[email protected]> > Cc: Bryan Ward <[email protected] <mailto:[email protected]> >; Troye Gibbs <[email protected] <mailto:[email protected]> >; Tony Barnett <[email protected] <mailto:[email protected]> >; Aaron Shuttleworth <[email protected] <mailto:[email protected]> > Subject: STP24-0253 - Ozcare Noosa Fire Trail You don't often get email from [email protected] <mailto:[email protected]> . Learn why this is important <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FVzqpCBNq04F73L3lfzfGf279FZ%3Fdomain%3Daka.ms&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251406633%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=O4L3zsQjWTP6Wi0KGap9l%2Fz0SwdO0bERT6I4hv3u6rw%3D&reserved=0> CAUTION: This email originated outside of Council. Do not open links or attachments if the email is unexpected or unusual. Hi Daniel, Thank you for your time earlier today. The purpose of the call was to discuss the latent conditions present on site with the ground conditions. The original Geotech report had CBR 20. You can see the photo of the material exposed. Far from CBR 20. As discussed, the solution we are currently pursuing is changing to a geocell gravel road. I’ve attached a concept sketch. We will be working with the geocell technical reps to develop the solution to suit ground conditions. As discussed where crossing 1 was proposed to be a concrete causeway. We would be looking to change to a pipe culvert with a headwall each side. Grouted stone pitch between existing pipe outlet on the high side of the proposed culvert. The fire clearance, we propose two options. The area shown attached in blue will be un-trafficable for a ride on mower when the soils are wet as shown in the photos. We propose weed mat and d50=150m rock so it can be treated with sprayed regularly to control vegetation. The area shown green can be turf as mower will be able to access this year round. Please pass this onto Joshua Leigh for discussion. As for approvals, I know that a change application will be required. But appreciate that you will drive it through concurrently with construction. We will provide updated drawings directly and get verbal approval to proceed while official change approvals occur in the background. leigh stegeman BEng, NER, RPEQ 10639 Partner – Senior Civil & Structural Engineer P. 07 3539 8304 M. 0468 599 237 E. [email protected] <mailto:[email protected]> <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FKXyBCK1Dx4i20R0rcGumf5FdSl%3Fdomain%3Dstpconsultants.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251418452%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=Oma8804CRv73zq7ddeMgaRpGvrg%2F%2F5RHN1Jzo%2BmAbiI%3D&reserved=0> P. 07 3539 8300 A. Level 3, 451 St Pauls Terrace, Fortitude Valley, QLD, 4000 <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FyHCJCL7Ey4TR5z5YIrC0fyXmwE%3Fdomain%3Dgoo.gl&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251430880%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=NpwtndIFCWcOmuKFgvwditOTBARPQpxVLI7UzqOxo9A%3D&reserved=0> W. stpconsultants.com.au <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FdLe3CMwGz4IqGnG6CPFWf81CYz%3Fdomain%3Dstpconsultants.com.au%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251442819%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=cAWdPGDN9f5y31ED6a3T%2BofCaFDABSh1z0n%2FtDaAZ%2BE%3D&reserved=0> <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2FEZoZCNLJA4F01g1MfyHZfyXPgc%3Fdomain%3Dlinkedin.com&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251454563%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=u1%2FBpR5nWwHqR9pNsrSKkJ5uncHWzESuy3VkerOiHQ0%3D&reserved=0> <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F8zvDCOMKB4ipoBo2UwI4fG6SR3%3Fdomain%3Dfacebook.com%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251466373%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=75QVtogGQ%2FoPx2oxGsUw8E9df%2BGCcoojptGxxaP7fqU%3D&reserved=0> <https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furl.au.m.mimecastprotect.com%2Fs%2F2ji_CP7LD4TKqLq5iQSpfxHDkN%3Fdomain%3Dinstagram.com%2F&data=05%7C02%7C[email protected]%7C613b3c4c3d60440bca0e08dd8845b7d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C638816555251478279%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=KCuvZok9p7I%2Fiw%2FnA4%2FtjMiLbp%2ByWhDCE%2FAW3Pgq6eI%3D&reserved=0> Please be advised that I work a 9-day fortnight. Working hours –Monday to Friday (with every other Friday as an RDO) This email and any attachments may contain personal information or information that is confidential or the subject of copyright. Any use, disclosure or copying of any part of it is prohibited. If this email is received in error please notify us by return email and delete the email. If any attachment to this email contains CAD or dimensional data, STP Consultants is not responsible for dimensional accuracy of the data as it may be based on third party information. Written dimensions take precedence over measured or scaled dimensions. The recipient should check any critical dimensions on site. STP Consultants does not warrant that this email or any attachments are free from viruses or defects. Please check any attachments for viruses and defects before opening them. ~~~ Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and emerging. The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.