2018-07-06 SM - Attachment 1 to Item 3 - Noosa Council 2018-19 Budget document
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Row Labels Description 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 Grand Total
Community Facilities
Renewal Noosa Heads The J Renewal of AV system Year 3 of 3 $ 30,000 $ 30,000
Noosa Leisure Centre- Master Plan Stage 1 - Upgrade to facilities LGIP $ 15,000 $ 15,000
Noosa Leisure Centre- Replace split system in the east function room $ 15,000 $ 15,000
Noosaville Leisure Centre - Replacement of retractable seating units $ 540,000 $ 540,000
Noosaville Leisure Centre - roof enclosure for café outside seating area $ 15,000 $ 15,000
Noosaville Wallace House Restumping $ 85,000 $ 85,000
Pomona Community House Airconditioning Renewal $ 30,000 $ 30,000
Pomona Kindergarten - Roof Replacement $ 50,000 $ 50,000
Shire Community Centres and Halls Annual Renewal Program $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 400,000
Sunshine Beach NAC - 25m AMP Pool Renewal Program $ 14,000 $ 9,800 $ 150,000 $ 2,000 $ 175,800
Sunshine Beach NAC - 50m AMP Pool Renewal Program $ 131,000 $ 260,000 $ 6,000 $ 29,000 $ 50,000 $ 476,000
Sunshine Beach NAC - LTS AMP Pool Renewal Program $ 14,000 $ 25,000 $ 4,000 $ 7,000 $ 20,000 $ 70,000
Sunshine Beach NAC - Other AMP Infrastructure Renewal Program $ 306,000 $ 1,000 $ 120,000 $ 427,000
Sunshine Beach NAC - Regrout / Recaulk and Replace Tiles (50m Pool) $ 65,000 $ 65,000
Sunshine Beach NAC - Replace Automated Pool Cleaner $ 15,000 $ 15,000
Sunshine Beach NAC - Roof Replacement $ 100,000 $ 100,000
Tewantin Childcare Centre Annual Renewal Program $ 50,000 $ 30,000 $ 80,000
Tinbeerwah Main Hall Flooring Renewal $ 50,000 $ 50,000
Upgrade Cooroy Butter Factory Acoustics Planning & Design (Stage 1) $ 25,000 $ 25,000
Noosa Heads Demolition of Lifeguard Service/ SLSQ operations storage facility $ 52,000 $ 52,000
Noosa Heads The J additional storage facility $ 100,000 $ 100,000
Noosaville Noosa Leisure Centre - Upgrade of Wall mounted basketball structures $ 80,000 $ 80,000
Noosaville Wallace Park Master Plan $ 50,000 $ 50,000
Sunshine Beach NAC - 25m Pool Shade Structure $ 50,000 $ 50,000
Community Facilities Total $ 792,000 $ 880,800 $ 800,000 $ 201,000 $ 322,000 $ 2,995,800
Corporate Buildings
Renewal Corporate Building Renewal Program $ 250,000 $ 250,000
Tewantin Administration Building - Roof Replacement $ 600,000 $ 600,000
Upgrade Tewantin - Emergency Generator Roof $ 15,000 $ 15,000
Tewantin Administration Building - Construction Year 1 $ 1,000,000 $ 1,000,000
Tewantin Administration Building - Construction Year 2 $ 1,000,000 $ 1,000,000
Tewantin Administration Building - Master Planning & detailed design $ 180,000 $ 180,000
Corporate Buildings Total $ 780,000 $ 1,015,000 $ 1,000,000 $ 250,000 $ 3,045,000
Fleet - Plant Replacement
Renewal Council Fleet and Plant Replacement Program $ 1,098,000 $ 1,466,000 $ - $ 1,890,000 $ 1,051,000 $ 5,505,000
Fleet - Plant Replacement Total $ 1,098,000 $ 1,466,000 $ - $ 1,890,000 $ 1,051,000 $ 5,505,000
Gravel Road Network
Renewal Shire Gravel Resheeting - Annual Program $ 410,000 $ 410,000 $ 410,000 $ 410,000 $ 410,000 $ 2,050,000
Upgrade Hinterland - Priority Safety Upgrade of Gravel Rd Sections - D+C (Donnelly's) $ 391,000 $ 391,000
Hinterland - Priority Upgrade of Gravel road Sections - Design and Construct $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,200,000
Gravel Road Network Total $ 801,000 $ 710,000 $ 710,000 $ 710,000 $ 710,000 $ 3,641,000
Holiday Parks
Expansion Noosa North Shore Beachfront Campground Redevelopment $ 2,500,000 $ 2,500,000
Renewal Holiday Park Renewal Program $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 240,000
Noosaville Noosa River Holiday Park Large Amenities Renewal $ 428,000 $ 428,000
Noosaville Noosa River Holiday Park Small Amenities Renewal $ 199,000 $ 199,000
Upgrade Noosaville Noosa River Holiday Park Road Reseal and V Drain Foreshore Works $ 149,000 $ 149,000
Holiday Parks Total $ 3,276,000 $ 60,000 $ 60,000 $ 60,000 $ 60,000 $ 3,516,000
Information Technology
Renewal ICT Hardware - Network Switch Replacement $ 370,000 $ 370,000
ICT PC Hardware Replacement $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 600,000
Upgrade Technology One CI Anywhere Systems Implementation $ 250,000 $ 250,000 $ 250,000 $ 250,000 $ 1,000,000
Technology One CI Anywhere Systems Implementation - Property and Rating, Procure to Pay $ 400,000 $ 400,000
Information Technology Total $ 770,000 $ 400,000 $ 400,000 $ 400,000 $ 400,000 $ 2,370,000
Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.