2018-07-06 SM - Attachment 1 to Item 3 - Noosa Council 2018-19 Budget document
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Row Labels Description 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 Grand Total
Planning Scheme
Expansion Shire Planning Scheme Climate Change Adaptation $ 175,000 $ 175,000
Shire Planning Scheme Consultancy $ 214,000 $ 214,000
Shire Project Team Materials & Services $ 125,000 $ 125,000
Shire Project Team Resources for New Planning Scheme $ 676,000 $ 676,000
Upgrade Noosa River Bathymetry Survey $ 60,000 $ 60,000
Planning Scheme Total $ 1,250,000 $ 1,250,000
Public Amenities
Renewal Peregian Beach Public Amenities Renewal Construction $ 350,000 $ 350,000
Shire - Public Amenities Renewal Program $ 150,000 $ 350,000 $ 350,000 $ 350,000 $ 1,200,000
Public Amenities Total $ 350,000 $ 150,000 $ 350,000 $ 350,000 $ 350,000 $ 1,550,000
Public Transport Infrastructure
Expansion Transport Strategy Implementation - Infrastructure Provision $ 600,000 $ 600,000 $ 600,000 $ 600,000 $ 2,400,000
Renewal Shire Bus Shelter Disabled Compliant Program: Year 5 $ 518,000 $ 518,000
Shire Bus Shelter Disabled Compliant Program: Year 6 $ 500,000 $ 500,000
Upgrade Cooroy Pines Road / Cooroy Belli Creek Road School Bus Safety Improvements $ 52,000 $ 52,000
Public Transport Infrastructure Total $ 518,000 $ 1,100,000 $ 652,000 $ 600,000 $ 600,000 $ 3,470,000
Sealed Roads Network
Renewal Black Mountain Road Priority Sections Road Reconstruction $ 410,000 $ 410,000
Noosa Heads Arkana Drive Median Strip Stabilisation $ 60,000 $ 60,000
Shire Reseal & Rehabilitation Renewal Program $ 3,800,000 $ 5,800,000 $ 4,800,000 $ 4,800,000 $ 4,800,000 $ 24,000,000
Shire Sealed Road Network Reconstruction Priority (Design and Construction) $ 500,000 $ 500,000 $ 700,000 $ 700,000 $ 2,400,000
Upgrade Black Mountain Road Priority Sections Road Reconstruction $ 495,000 $ 270,000 $ 160,000 $ 925,000
Boreen Point - Teewah St Gravel Road Seal $ 250,000 $ 250,000
Boreen Point, Hector Street Road widening and K&C $ 77,000 $ 77,000
Sealed Roads Network Total $ 4,210,000 $ 6,855,000 $ 5,820,000 $ 5,660,000 $ 5,577,000 $ 28,122,000
Sports Ground and Facilities
Upgrade Shire Sports Ground and Facilities Trunk Network Upgrade - LGIP $ 50,000 $ 50,000
Sports Ground and Facilities Total $ 50,000 $ 50,000
Stormwater Drainage
Expansion Noosaville Industrial Area Stormwater Quality Improvement Device $ 250,000 $ 250,000
Renewal Shire - Bioretention Basin Renewals Program $ 80,000 $ 100,000 $ 150,000 $ 80,000 $ 410,000
Shire Kerb & Channel Renewal Program $ 100,000 $ 100,000 $ 130,000 $ 130,000 $ 460,000
Shire Pipe Re-lining / Rehabilitation Renewal Program $ 150,000 $ 250,000 $ 150,000 $ 250,000 $ 800,000
Shire Pit Structure Renewal Program $ 150,000 $ 100,000 $ 100,000 $ 100,000 $ 450,000
Upgrade Noosaville Project Ave Stormwater Drainage Easement Upgrade $ 250,000 $ 250,000
Shire Stormwater Drainage Trunk Network Upgrade - LGIP $ 515,000 $ 307,000 $ 822,000
Stormwater Drainage Total $ 980,000 $ 550,000 $ 1,045,000 $ 867,000 $ 3,442,000
Streetscapes and Road Corridors
Renewal Noosa Heads Hastings Street CCTV System Renewal $ 156,000 $ 156,000
Shire Streetscapes Renewal Program $ 250,000 $ 2,500,000 $ 2,750,000
Upgrade Noosa Heads Hastings Street LED Lighting Renewal $ 190,000 $ 190,000
Streetscapes and Road Corridors Total $ 156,000 $ 190,000 $ 250,000 $ 2,500,000 $ 3,096,000
Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.