NOOSA COUNCIL CAPITAL PROGRAM
RENEWAL PROJECTS 2018/19
Program Description Grants General Rates Project Total
TOTAL CAPITAL RENEWAL PROGRAM $ 2,781,000 $ 19,120,000 $ 21,901,000
CAPITAL WORKS $ 2,766,000 $ 16,927,000 $ 19,693,000
R04 Bridges Cooran Old Noosa Road Bridge Renewal $ 875,000 $ 645,000 $ 1,520,000
R05 Bridges Cooroy Mary River Road Bridge Renewal $ 663,000 $ 310,000 $ 973,000
R06 Bridges Noosa Heads Witta Circle Bridge Renewal $ 28,000 $ 28,000
R07 Bridges Tewantin Doonella Bridge Renewal $ 18,000 $ 18,000
R08 Cemeteries Pomona Cemetery Timber Fence Renewal $ 27,000 $ 27,000
R09 Coastal Canals and Waterways Peregian Beach Boardwalk Renewal North of Tower to access $ - $ 140,000 $ 140,000
R10 Coastal Canals and Waterways Noosaville Gympie Terrace Revetment Wall Renewal (O-Boats) $ 224,000 $ 224,000
R11 Community Facilities Pomona Community House Airconditioning Renewal $ 30,000 $ 30,000
R12 Community Facilities Tinbeerwah Main Hall Flooring Renewal $ 50,000 $ 50,000
R13 Community Facilities Pomona Kindergarten - Roof Replacement $ 50,000 $ 50,000
R14 Community Facilities Noosa Heads The J Renewal of AV system Year 3 of 3 $ 30,000 $ 30,000
R15 Community Facilities Sunshine Beach NAC - 25m AMP Pool Renewal Program $ 14,000 $ 14,000
R15 Community Facilities Sunshine Beach NAC - 50m AMP Pool Renewal Program $ 131,000 $ 131,000
R15 Community Facilities Sunshine Beach NAC - LTS AMP Pool Renewal Program $ 14,000 $ 14,000
R15 Community Facilities Sunshine Beach NAC - Other Infrastructure Renewal Program $ 306,000 $ 306,000
R15 Community Facilities Sunshine Beach NAC - Replace Automated Pool Cleaner $ 15,000 $ 15,000
R39 Community Facilities Sunshine Beach NAC - Roof Replacement $ 100,000 $ 100,000
R16 Corporate Buildings Tewantin Administration Building - Roof Replacement $ 600,000 $ 600,000
R18 Gravel Road Network Shire Gravel Resheeting - Annual Program $ 410,000 $ 410,000
R19 Holiday Parks Noosaville Noosa River Holiday Park Small Amenities Renewal $ 199,000 $ 199,000
R20 Holiday Parks Noosaville Noosa River Holiday Park Large Amenities Renewal $ 428,000 $ 428,000
R22 Libraries & Galleries Noosaville Library Refurbishment Construction Year 2 $ 322,000 $ 483,000 $ 805,000
R23 Parks & Playgrounds Noosaville Gympie Terrace Park Furniture Renewal $ 80,000 $ 80,000
R24 Parks & Playgrounds Pomona Stan Topper Park - Basketball Court Renewal $ 35,000 $ 35,000
R25 Parks & Playgrounds Headland Park Playground Renewal $ 60,000 $ 60,000
R26 Parks & Playgrounds Wavecrest Park Shade Sail Renewal $ 43,000 $ 43,000
R27 Parks & Playgrounds Noosa Heads Pinaroo Park Swing & Softfall Renewal $ 19,000 $ 19,000
R28 Parks & Playgrounds Sunrise Beach Orient Park North Swing & Softfall Renewal $ 19,000 $ 19,000
R29 Parks & Playgrounds Sunrise Beach Comet Park Swing & Softfall Renewal $ 19,000 $ 19,000
R30 Pathways & Boardwalks Noosa Heads Park Road Boardwalk Renewal Construction $ 5,121,000 $ 5,121,000
R31 Pathways & Boardwalks Noosa Heads Main Beach Trunk Pathway Upgrade Link from Surf Club to Park Road (90m) $ 697,000 $ 697,000
R32 Public Amenities Peregian Beach Public Amenities Renewal Construction $ 350,000 $ 350,000
R33 Public Transport Infrastructure Shire Bus Shelter Disabled Compliant Program: Year 5 $ 250,000 $ 268,000 $ 518,000
R34 Sealed Roads Network Shire Reseal & Rehabilitation Renewal Program $ 3,800,000 $ 3,800,000
R35 Sealed Roads Network Black Mountain Road Priority Sections Road Reconstruction $ 410,000 $ 410,000
R40 Streetscapes Noosa Heads Hastings Street CCTV System Renewal $ 156,000 $ - $ 156,000
R36 Transport and Infrastructure Management Tewantin Hilton Terrace & Ernest Street Intersection Upgrade Construction $ 500,000 $ 1,000,000 $ 1,500,000
R37 Transport and Infrastructure Management Shire Forward Planning & Design Program - Construction ready designs $ 500,000 $ 500,000
R38 Transport and Infrastructure Management Castaways Beach, David Low Way Safety & Corridor Improvements $ 254,000 $ 254,000
OTHER CAPITAL $ 15,000 $ 2,193,000 $ 2,208,000
R01 Asset Management Zero Emissions Noosa Project Implementation $ 500,000 $ 500,000
R02 Asset Management Shire CCTV Drainage program $ 200,000 $ 200,000
R03 Asset Management Shire Pavement Management System Road Surface Condition Modelling $ 40,000 $ 40,000
R17 Fleet - Plant Replacement Council Fleet and Plant Replacement Program $ 15,000 $ 1,083,000 $ 1,098,000
R21 Information Technology ICT Hardware - Network Switch Replacement $ 370,000 $ 370,000
Page 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.