Original source · versioned page text
20220051 37 Bottlebrush Civil
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
NEW B1 KERB PROFILE AS PER
SETOUT POINT
PROVIDE NOMINAL 500mm IPWEA STD DWG RS-080.
OF LEVELLED VERGE
BEHIND KERB THEN GRADE
TO MATCH EXISTING SAW CUT 300mm INTO
ASPHALT WEARING SAWCUT LINE EXISTING WIDE AND MAKE
COURSE. SMOOTH JOIN KERB AND CHANNEL TIE IN NOTES:
300 1. REFER TO CONCRETE AS. 2876-2000 CONCRETE KERBS AND CHANNELS FOR
EXISTING SEAL SPECIFIC REQUIREMENTS.
2. 100mm MINIMUM COMPACTED DEPTH OF CLASS 3, 20mm F.C.R. BEDDING TO
97% MMDD OR EXTENSION OF ROAD PAVEMENT LAYERS, WHICH EVER IS
GREATER UNLESS OTHERWISE DIRECTED.
EXISTING
255 3. WEARING COURSE ASPHALT TO BE MINIMUM 30mm COMPACTED DEPTH OF
MIN
250
PAVEMENT TYPE N, 10mm NOMINAL SIZE (U.N.O.)
4. CONSTRUCTION JOINTS LOCATED - 2500mm MAXIMUM SPACING
TERMINATE REINFORCING FABRIC 75mm MINIMUM DEPTH
RECUT A 6mm WIDE x 20mm DEEP JOINT & PROVIDE A MESH 50mm BEFORE JOINT. 5. WIDTHS SPECIFIED IN CROSS SECTIONS ARE FACE (LINE) OF KERB.
BACKING ROD + JOINT SEALANT OR SIMILAR APPROVED FULL HEIGHT 10mm THICK ABLEFLEX
150 6. CONCRETE SHALL BE NORMAL CLASS N25 STANDARD STRENGTH GRADE
(REFER TO NOTE 2)
WITH PULL AWAY STRIP AT TOP COMPLYING WITH THE REQUIREMENTS OF AS. 1379. REFER TO VICROADS
TERMINATE REINFORCING FABRIC STANDARD SPECIFICATION 703 FOR REQUIREMENTS OF CONCRETE TO BE
MESH 50mm BEFORE JOINT. OVERALL PAVEMENT DEPTH TO BE
USED IN EXTRUSION MACHINES.
MIN 250mm OR MATCHED TO EXISTING SUBGRADE.
100 MIN
7. CONCRETE TO BE SMOOTH TROWELLED FINISHED ON TRAY AND KERB.
NEW SUBGRADE. EXISTING PAVEMENT.
PROVIDE DOWEL (OPTIONAL IN FOOTPATHS)
WITH SLEEVE ON ONE END INSTALLED TO PROVIDE DOWEL WITH SLEEVE ON ONE END
MANUFACTURERS SPECIFICATION. REFER TO INSTALLED TO MANUFACTURERS SPECIFICATION.
'DOWEL SCHEDULE FOR EXTERNAL PAVEMENT REFER TO 'DOWEL SCHEDULE FOR EXTERNAL
DOWEL JOINTS' FOR DOWEL OPTIONS PAVEMENT DOWEL JOINTS' FOR DOWEL OPTIONS
NEW KERB TIE IN DETAIL
CONTROL JOINT DETAIL EXPANSION JOINT DETAIL
DOWEL SCHEDULE FOR EXTERNAL PAVEMENT DOWEL JOINTS
OPTION DOWEL CENTRES PRODUCT OPTIONS
1 150x150x6mm THK PL. 600mm PEIKKO
2 S20x400 LONG SQUARE 600mm DANLEY / LESA OR EQUIV
3 10x75x150 LONG PL. 600mm LESA HI MOVE
4 110x110x10 DIAMOND DOWEL 500mm DANLEY / LESA / PEIKKO
0.
0m
1
6.
m 6
2
3
KERB SETOUT LOCATION
POINT EASTING NORTHING LEVEL
1 1006.653 2019.794 36.207
2 1006.611 2014.795 35.308
3 1006.597 2013.196 35.020
SCALE: CLIENT: APPROVED BY: PROJECT NAME:
RESIDENTIAL UNITS AT 37 BOTTLEBRUSH AVE
NTS TITLE: STATUS:
D 15/03/23 RFI UPDATE BP BP BP ROADS & DRAINAGE MCU / OP WORKS
© ABN 89 647 469 707 C 29/11/22 RFI UPDATE BRP JB BRP BOTTLEBRUSH PROPERTY PTY LTD BEN PARRY DETAILS
B 10/10/22 RFI UPDATE BRP MVP BRP
37 MARY ST RPEQ: 28084
A 12/05/22 MCU / OPW ISSUE BRP BRP NW
NOOSAVILLE, QLD 4566 CPEng NER DRAWING NUMBER: PROJECT NUMBER: REV:
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP SHEET
DATE: 15/03/23 SIZE:
RECORCONSULTING.COM REVISIONS C41 20220051 A1 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.