                      The following plans require amendment.

                           Plan No.           Rev.    Plan/Document Name                            Date

                           C307               B       Proposed Crossings Layout & Details Plan      4 July 2024
                                                      Prepared by STP Consultants

                           Amendments         The minimum depth of the proposed rock armor scour protection is
                                              not satisfactory.
                                              Provide an amended Proposed Crossings Layout & Details Plan
                                              prior to the prestart meeting that includes:
                                                     a.   200mm d50 rock armor scour protection to a minimum
                                                          depth of 300mm.

                           C314               B       Finished Levels Plan – Sheet 7                15      August
                                                                                                    2024
                                                      Prepared by STP Consultants

                           C402               B       Stormwater Longitudinal Sections              15      August
                                                                                                    2024
                                                      Prepared by STP Consultants

                           Amendments         During the 1% AEP event, stormwater overflow from Catchment 2/A
                                              will be controlled, collected and discharged within the subject site
                                              towards the fire access trail via Outlet 1/A.
                                              The design proposes to concentrate flow without returning flow back
                                              to the natural flow regime, creating the potential risk of scour about
                                              the outlet and to downstream properties (fire access trail, Giraween).
                                              Provide an amended Finished Levels Plan – Sheet 7 and Stormwater
                                              Longitudinal Sections prior to the prestart meeting that includes:
                                                     a.   an amended outlet (1/A) that returns the concentrated
                                                          flow back to the natural flow regime (i.e., sheet flow).
                                                          Council considers an acceptable solution to include a
                                                          rock energy dissipator.

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 6 January 2027, unless an application to extend the currency period
                      is approved by Council.
               SITE SPECIFIC CONDITIONS
                      Bonds
               3.     A site control and/or compliance bond of $25,000 is to be submitted to Council prior to the
                      pre-start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               4.     Bonds must:
                      a.      have approval of the bond calculations and amount from Council prior to lodgement
                      b.      be lodged with Council and accompanied by the Bond Administration Fee/s.


                                                                                                       Page 8 of 19

Document Set ID: 23410526
Version: 6, Version Date: 14/01/2025

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW24 0125.pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.