Council archive · source document
Delegated Report - Code - Planning OPW24 0125 · OPW24/0125
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
C307 B Proposed Crossings Layout & Details Plan 4 July 2024
Prepared by STP Consultants
Amendments The minimum depth of the proposed rock armor scour protection is
not satisfactory.
Provide an amended Proposed Crossings Layout & Details Plan
prior to the prestart meeting that includes:
a. 200mm d50 rock armor scour protection to a minimum
depth of 300mm.
C314 B Finished Levels Plan – Sheet 7 15 August
2024
Prepared by STP Consultants
C402 B Stormwater Longitudinal Sections 15 August
2024
Prepared by STP Consultants
Amendments During the 1% AEP event, stormwater overflow from Catchment 2/A
will be controlled, collected and discharged within the subject site
towards the fire access trail via Outlet 1/A.
The design proposes to concentrate flow without returning flow back
to the natural flow regime, creating the potential risk of scour about
the outlet and to downstream properties (fire access trail, Giraween).
Provide an amended Finished Levels Plan – Sheet 7 and Stormwater
Longitudinal Sections prior to the prestart meeting that includes:
a. an amended outlet (1/A) that returns the concentrated
flow back to the natural flow regime (i.e., sheet flow).
Council considers an acceptable solution to include a
rock energy dissipator.
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 6 January 2027, unless an application to extend the currency period
is approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
3. A site control and/or compliance bond of $25,000 is to be submitted to Council prior to the
pre-start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Bonds must:
a. have approval of the bond calculations and amount from Council prior to lodgement
b. be lodged with Council and accompanied by the Bond Administration Fee/s.
Page 8 of 19
Document Set ID: 23410526
Version: 6, Version Date: 14/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW24 0125.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.