Skip to the record
Every meeting, every word.

Original source · versioned page text

2017-10-19 Ordinary Meeting Agenda

of 22

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                      19 OCTOBER 2017


        Stormwater Drainage
        22.   The site must be provided with a stormwater drainage system connecting to a
              lawful point of discharge. The works must be undertaken in accordance with an
              Operational Works approval and must include in particular:
              a.    Connection of any new works on site and in the carparking area to the
                    existing stormwater drainage system;
              b.    The works in Webb Road must be generally in accordance with drawing
                    number 16636-SK01 Revision A prepared by TOD Noosa and include
                    sufficient detail:
                    i.     To quantify the catchment and calculate runoff to the proposed inlet
                           and define overland flow component bypassing the inlet in a 1% AEP
                           event
                    ii.    To demonstrate improved inlet capture
                    iii.   To demonstrate how the adjacent 1in 4 fill batter is to be stabilised to
                           avoid scour when flows bypass the proposed inlet
                    iv.    To demonstrate that cars parked in the adjacent carparking spaces
                           will not be flooded in a 1% AEP event
        Geotechnical Stability Add for REC: - Subdivisional Requirements
        23.   All works must be carried out in accordance with a Geotechnical Report (or part
              thereof) prepared by a qualified person* and endorsed through an Operational
              Works approval.
              *(Refer to Advisory Note)
        24.   Certification must be submitted to Council from a qualified person* which certifies
              that the development has been constructed in accordance with the Geotechnical
              Report for the development and that the development has a minimum factor of
              safety against landslip of 1.5 in the long term.
        *(Refer to advisory Note)
        Earthworks and Retaining Walls
        25.   All fill and associated batters must be undertaken in accordance with an
              Operational Works approval, and contained entirely within the subject site unless
              written permission from the respective landowner(s) is provided to Council.
        26.   All retaining walls must be designed and constructed in accordance with the
              planning scheme and must be certified by an RPEQ where exceeding 1.0m in
              height. All retaining walls that are publicly accessible and exceed 1.0m in height
              must be fitted with a commercial grade safety fence.
        Damage to Services and Assets
        27.   Any damage caused to existing services and assets as a result of the
              development works must be repaired at no cost to the asset owner at the
              following times:
              a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                    immediately; or
              b.    where otherwise, upon completion of the works associated with the
                    development.
              Any repair work which proposes to alter the alignment or level of existing services
              and assets must first be referred to the relevant service authority for approval.


                                                                                     Page 9 of 22
Log in to download the original file

2017-10-19 Ordinary Meeting Agenda(PDF, 744KB).pdf · 762 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.