Council archive · source document
20180497 - Revised Architectural Drawings - Received 07-12-2018 · MCU18/0206
Attached to the e-mail Detached House in Coastal Protection - MCU18/0206.
SE A V IE W T E RRA C E - First F loor Pla n
LEGEND
A
E
B C
A B
D E
AW Powdercoated Aluminium Awning 3,500 4,500 6,000 4,500
B01 200x100 POWDERCOATED RHS BEAM
BW PAINTED BLOCKWORK
85°33'30" 28.164 SIDE BOUNDARY
CL1 100ø POWDERCOATED STEEL
STRUCTURAL DOWNPIPES
POOL BELOW
CL2 90ø POWDERCOATED CHS STEEL POST
CU CUSTOM ORB COLORBOND Awning over pool below shown as dashed
EXISTING TREE
ULTRA ROOF SHEET
CU2 SPANDEK COLORBOND W13
W12
ULTRA ROOF SHEET 1
CONC TROWELLED CONCRETE SLAB TIMBER BATTEN SCREEN
1,450
WITH NON-SLIP SEALENT GAS STRUT AWNING SCREEN
OPENS TO CREATE YET TO BE
CONC1 HONED CONCRETE SLAB OPERABLE EAVE FINALISED
W11 HIGHLEVEL GLAZING ABOVE
WITH NON-SLIP SEALENT 2 DP
ZINCALUME ZINCALUME ROOF SHEET
DWARF WALL
DP DOWNPIPE 90mmØ
FC FIBRECEMENT SHEET
GLB SUNTUF CUSTOM ORB TRANSLUCENT
POLYCARBONATE ROOF SHEET WITH KITCHEN DINING
BATTEN OVER ROOF SHEET VOID TIMBER 01
4,500
W10
GUTTER 150 ROUNDED GUTTER
LDRY LAUNDRY SUNROOM LIVING ROOM
TIMBER 01
W14
PC SUNTUF CUSTOM ORB TRANSLUCENT TIMBER 01
SID
POLYCARBONATE ROOF SHEET WITH C
EB
BATTEN LINED SOFFIT GLAZED
C FLOOR
OUN
RBW RENDERED BLOCKWORK tv
D24A CL2
SHR SHOWER 3
DAR
K DP 17 01 CL2
SS CUSTOM STAINLESS STEEL TRAY GUTTER BAC
0 SET 16 02
2,05 sp
Y
SP SIPHONIC DOWNPIPE WC 15 03
STAIR 01
W21 TILE 14 04 line of folded gutter above
TB HARDWOOD TIMBER BATTEN 4 D14 13 05
CL2
TIMBER 01 POLISHED HARDWOOD TIMBER FLOORING
25.8
12 06
178°50'20"
TIMBER 02 EXTERNAL HARDWOOD TIMBER DECKING 11 07
10 08
WC TOILET
4,500
W17 DECK
339°
09 VOID
WB WEATHERBOARD STORAGE TIMBER 02
06'
W19 D15
CL2
5
18.749
PROVISION FOR
SPIRAL STAIR UP
FUTURE LIFT ONTO sp TO LOOKOUT D23
STAIR LANDING
CL2
6
D16 LINEN
D17 SCREEN
RY
YET TO BE
FINALISED
FRONT BOUNDA
STUDY WIR
TIMBER 01 TIMBER 01
4,500
BED 01
FALL 30º TIMBER 01 D22
GLB D20
ENSUITE
TILE D18
EXISTING TRE
DECK
1,500. D19
7 CL2
TILE
CL2
600.
D21
1,500
W18
POLYCARBONATE AWNING
WITH BATTEN OVER
CL2
8
4,000. SETBACK
. BIFOLD TIMBER
,500
0"
1 BATTEN SCREEN
°17'3
SCREEN
YET TO BE
3
9 19
FINALISED
3.18
2'
2 °1
22
E A B
9
18
0 1 2 3 4 5m 3.
EXISTING TREE
ISSUE CLIENT Deborah & Alan Kerr DRAWN MW
COPYRIGHT - These drawings to be SD01 DESIGN CONCEPT DRAWINGS 05-10-2018
PROJECT 49 Seaview Terrace, Sunshine Beach Q ROBINSON ARCHITECTS DATE 7/12/2018
used only with Architects written consent.
DD01 DESIGN DEVELOPMENT 19-10-2018 67 MEMORIAL DRIVE,
DO NOT SCALE OFF DRAWINGS. EUMUNDI QLD 4562 SCALE 1:100 (A3 Paper)
Refer any discrepancies to Architect and DD02 DESIGN DEVELOPMENT 01-11-2018
DRAWING DD102 - First Floor Plan ROBINSON Ph. (07) 5442 8566
NO. DD02
verify all dimensions on site. DD02 DESIGN APPROVAL 07-12-2018 A RC H I T E CT S www.robinsonarchitects.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20180497 - Revised Architectural Drawings - Received 07-12-2018.pdfRelated documentApplication case desk ↗