Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-06-05 Special Meeting Minutes

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                      MINUTES


              Special Meeting


             Wednesday 5 June 2019

                              11.00am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2019-06-05 Special Meeting Minutes(PDF, 431KB).pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 15 sections

Section 2

SPECIAL MEETING MINUTES                                                                                5 JUNE 2019


PURPOSE OF MEETING
The purpose of the Special Meeting was to consider:
1.                       MCU18/0204 Development Application for a Material Change Of Use for Entertainment and
                         Dining Business Type 1- Food and Beverage and Retail Business Type 2 Shop and Salon
                         at 6 Heron Street, Peregian Beach
2.                       Planning & Environment Court Appeal 4066 of 2017 – 215 David Low Way, Peregian Beach
                         – Proposed Settlement Conditions



1                        ATTENDANCE & APOLOGIES


                         COUNCILLORS
                         Councillor T Wellington, Mayor
                         Councillor J Glasgow
                         Councillor J Jurisevic
                         Councillor F Pardon

                         EXECUTIVE
                         M Shave, Acting Chief Executive Officer
                         K Rawlings, Director Environment and Sustainable Development

                         APOLOGIES
                         Councillor I Jackson
                         Councillor B Stockwell
                         Councillor F Wilkie, Deputy Mayor

                         The meeting commenced at 11.00am.


2                        REPORTS

                         1.   MCU18/0204 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE
                              FOR ENTERTAINMENT AND DINING BUSINESS TYPE 1- FOOD AND BEVERAGE
                              AND RETAIL BUSINESS TYPE 2 SHOP AND SALON AT 6 HERON STREET
                              PEREGIAN BEACH
Document i nformati on




                         Council Resolution
                         Moved:           Cr Pardon
                         Seconded:        Cr Glasgow
                         That Council note the report by the Coordinator Planning to the Special Meeting dated 5 June
                         2019 regarding application MCU18/0204 for a Development Permit for Material Change of
                         Use Entertainment & Dining Business - Type 1 Food & Beverage, Retail Business - Type 2
                         Shop & Salon and Commercial Business Type 1 - Office, situated at 6 Heron Street Peregian
                         Beach and:
                         A.   Refuse the application for the following reasons:
                              1.     The proposed development is contrary to the Overall and Specific Outcomes of
                                     the Eastern Beaches Locality Code as the development is not compatible with
                                     the preferred built form outcomes as:


                                                                                                       Page 2 of 16

Section 3

SPECIAL MEETING MINUTES                                                                                  5 JUNE 2019


                                      i.     The proposed building height exceeds 8.0 metres and 2 storeys and is not
                                             consistent with structures on adjoining and surrounding land nor
                                             responsive to the informal beachside character of the locality;
                                      ii.    The development presents as a 3 story building and does not contribute to
                                             an informal village-like atmosphere that engenders a ‘sense of space’ and
                                             public focus for local community interaction and activity;
                                      iii.   The proposed development will visually dominate the street, adjacent
                                             properties, surrounding spaces and the existing skyline;
                                      iv.    The proposed development exceeds the allowable plot ratio and results in
                                             a building which presents an appearance of excessive bulk to adjacent
                                             properties, roads and other areas in vicinity of the site.
                                      v.     The proposed development does not present subtle changes in colours,
                                             textures and materials to break up the building facades.
                                 2.   The development is contrary to the Driveways and Carparking Code as the
                                      proposal does not provide any car parking on site and the car parking demand is
                                      likely to exceed the car parking demand generated by the previous use of the
                                      site for a grocery store.
                         B.      Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
                                                                                                               Carried.
Document i nformati on




2                        PLANNING & ENVIRONMENT COURT APPEAL 4066 OF 2017 – 215 DAVID LOW WAY,
                         PEREGIAN BEACH – PROPOSED SETTLEMENT CONDITIONS
                         Council Resolution
                         Moved:              Cr Glasgow
                         Seconded:           Cr Jurisevic
                         That Council note the report by the Manager, Development Assessment to the Special
                         Council Meeting dated 5 June 2019 regarding Planning & Environment Court appeal 4066
                         of 2017 and agree to settle the appeal generally in accordance with the following conditions:
                                 When Conditions must be Complied With
                         1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with
                                 prior to the use commencing, and then compliance maintained at all times while the
                                 use continues.
                                 Approved Plans
                         2.      Development undertaken in accordance with this approval must generally comply with
                                 the approved plans of development. The approved plans are listed in the following
                                 table:
                                  Plan No.       Rev.                Plan / Document Name                    Date
                              16003 SD-02         4     18082 Location/Site Plan prepared by Red Door    16 April 2019
                                                        Architecture
                              16003 SD-03         4     18082 Site/Rufous Street Overlay prepared by     16 April 2019
                                                        Red Door Architecture
                              16003 SD-04         4     18082 Site/Floor Plan prepared by Red Door       16 April 2019
                                                        Architecture
                              16003 SD-05         4     18082 Site/First Floor Plan prepared by Red      16 April 2019
                                                        Door Architecture
                              16003 SD-06         4     18082 Site/Roof Plan prepared by Red Door        16 April 2019
                                                        Architecture

                                                                                                         Page 3 of 16

Section 4

SPECIAL MEETING MINUTES                                                              5 JUNE 2019


             Plan No.       Rev.                Plan / Document Name                     Date
         16003 SD-07         4G    18082 Site/Unit Building Roof Plan prepared by    16 April 2019
                                   Red Door Architecture
         16003 SD-08         G     Kamala Plans prepared by Sprout Architects        24 May 2018
         16003 SD-09         G     Kamala Elevations prepared by Sprout              24 May 2018
                                   Architects
         16003 SD-10         G     Marram Plans prepared by Sprout Architects        24 May 2018
         16003 SD-11         G     Marram Elevations prepared by Sprout              24 May 2018
                                   Architects
         16003 SD-12         G     Saltbush House Plans prepared by Sprout           24 May 2018
                                   Architects
         16003 SD-13         G     Saltbush House Plans prepared by Sprout           24 May 2018
                                   Architects
         16003 SD-14         G     Saltbush House Elevations prepared by Sprout      24 May 2018
                                   Architects
         16003 SD-15         G     Saltbush House Elevations prepared by Sprout      24 May 2018
                                   Architects
         16003 SD-16         G     Lily House Plans prepared by Sprout Architects    24 May 2018
         16003 SD-17         G     Lily House Plans prepared by Sprout Architects    24 May 2018
         16003 SD-18         G     Lily House Elevations prepared by Sprout          24 May 2018
                                   Architects
         16003 SD-19         G     Wallum House Plans prepared by Sprout             24 May 2018
                                   Architects
         16003 SD-20         G     Wallum House Elevations prepared by Sprout        24 May 2018
                                   Architects
         16003 SD-21         5     18082 Floor Plans prepared by Red Door            16 April 2019
                                   Architecture
         16003 SD-22         5     18082 Floor Plans prepared by Red Door            16 April 2019
                                   Architecture
         16003 SD-23         5     18082 Elevations prepared by Red Door             16 April 2019
                                   Architecture
         16003 SD-29         4     18082 Staging Plan prepared by Red Door           16 April 2019
                                   Architecture
         1108-155C-01-02     C     Simmonds & Bristow Drawing                       13 January 2012
                                   Figure SW-1
            The approved plans may be further amended by the conditions herein.
            Staging of Development
            The development may be staged in accordance with the approved staging plan. The
            first stage must include the following:
            a.   All required bushfire management measures
            b.   All required acoustic fencing and screening
            c.   A 2m wide concrete pedestrian pathway between the motel building and the
                 adjacent IGA shopping centre
    Nature and Extent of Approved Use
    3.      The approval is for 19 x 3+ bedrooms Visitor accommodation Type 4 dwelling units, 1
            x manager’s unit and a Visitor accommodation Type 4 motel building which contains
            10 x 2 bedrooms dwelling units and 22 x 1 bedroom accommodation units.
    4.      The manager’s unit is for permanent occupation by the manager of the approved Visitor
            accommodation Type 4 dwelling units.
    5.      The approved units must be used for short term visitors only. The approved units must
            not be occupied by persons for continuous occupation in excess of 90 days for each
            calendar year. A register of occupation must be kept by the body corporate and made
            available to Council upon request. The requirements of this condition must be included

                                                                                      Page 4 of 16

Section 5

SPECIAL MEETING MINUTES                                                             5 JUNE 2019


          in the Community Management Statement for anybody corporate for the subject site.
          If the development is to be staged the motel must be built in the first stage.
    6.    Non-residential uses on the premises must not operate outside the hours of:
          a.    7am to 10pm Monday to Thursday
          b.    7am to 11pm Friday and Saturday
          c.    9am to 10pm Sunday or any public holiday
          The requirements of this condition must be included in the Community Management
          Statement for any body corporate for the subject site.
    7.    Service vehicle movements associated with non-residential uses on the premises
          (including loading and unloading) must not occur outside the hours of 7am to 6pm
          Monday to Saturday and not at all on Sundays or public holidays. The requirements of
          this condition must be included in the Community Management Statement for any body
          corporate for the subject site.
          Building Height
    8.    The maximum height of the 19 Visitor accommodation Type 4 dwelling units and the
          managers unit must not exceed 8 metres above the finished ground level and the
          natural ground level, other than in respect of dwelling units 1, 8 and 9 which have a
          maximum height as follows:
          8.1. Dwelling Unit 1: 9.056m above natural ground level
          8.2. Dwelling Unit 8: 8.602m above natural ground level
          8.3. Dwelling Unit 9: 9,106m above natural ground level
    9.    The height of the Visitor accommodation Type 4 motel building must be in accordance
          with the approved plans.
    10.   Certification must be submitted to Council from a Licensed Surveyor which certifies
          that the buildings do not exceed the maximum height requirement of this Decision
          Notice.
          Building Appearance
    11.   All air conditioning units or other mechanical equipment must be located at ground
          level, or otherwise fully enclosed or screened such that they are not visible from the
          street frontages nor adjoining properties.
    12.   All deck and balcony areas above ground floor must not be enclosed by permanent
          fixtures such as shutters, louvres, glass panelling or the like, except where required to
          satisfy any privacy condition of this Decision Notice.
    13.   All buildings shall be finished in natural, muted tones and include a mix of materials as
          depicted on the Approved Plans.
    14.   Any advertising sign or device is to comply with Council’s policies on advertising.
          Access and Driveways
    15.   A sealed access must be provided from Sandpiper Court to all parking and
          manoeuvring areas of the development. The works must be undertaken in accordance
          with an Operational Works approval and must include in particular:
          a.    improvements to the existing access to Sandpiper Court. The improvements
                must be sufficient to cater for the existing commercial use and the additional
                traffic and vehicle types (passenger, service, refuse and emergency services)
                generated by the proposed development
          b.    internal access roads that are generally in accordance with the approved plans

                                                                                     Page 5 of 16

Section 6

SPECIAL MEETING MINUTES                                                             5 JUNE 2019


          c.   driveways to each residence that are in accordance with Council’s Standard
               Drawings RS-049, RS-050 and any associated addendums
          d.   a driveway to the multi-unit building that is in accordance with Council’s Standard
               Drawing RS-051 and any associated addendums
          e.   suitable safety measures, including warning signage, to improve driver
               awareness of pedestrians and enhance safety. Warning signage must be
               provided near the exit from the development site to warn motorists of pedestrian
               movements and other vehicles at the Sandpiper Court entrance
          f.   clearly visible signage must be erected at the threshold of the internal road, which
               clearly indicates to motorists and pedestrians that they are entering a private road
               system
    16.   If the development is to be staged a temporary sealed turnaround facility must be
          constructed at the end of each road left temporarily incomplete as a result of the
          development staging. The temporary turnaround facility must be in accordance with an
          Operational Works approval and must be of sufficient size to accommodate the 3-point
          turn manoeuvre of a refuse collection vehicle.
          Car Parking
    17.   Car parking spaces must be provided in accordance with the approved plans and
          marked on the site and made available and accessible at all times while the use is
          operating. The works must be undertaken in accordance with an Operational Works
          approval.
          Service Vehicles
    18.   Service vehicle parking, manoeuvring and standing spaces must be provided for the
          Visitor accommodation Type 4 motel building on the site in accordance with the
          approved plans. The works must be undertaken in accordance with an Operational
          Works approval.
          Pedestrian Facilities
    19.   Pedestrian facilities must be provided for the development. The works must be
          undertaken in accordance with an Operational Works approval and must include in
          particular:
          a.   the internal pathway network generally in accordance with the approved plans;
          b.   a 2m wide pathway connection to the existing pathway network located in the
               reserve to the north of the site;
          c.   a 2m wide pathway connection to the existing commercial development in the
               southern part of the subject site.
          Stormwater Drainage
    20.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval.
    21.   A Stormwater Management Plan must be submitted for approval as part of an
          Operational Works application. The plan must address the management of stormwater
          quantity and quality and must be generally in accordance with the Stormwater
          Management Plan (SLR, 23 March 2018) being exhibit 64 in appeal 4066 of 2017 with
          the following specific modifications.
          a.   The development shall include a 3kL tank to be provided to collect and reuse roof
               runoff from each unit, and a 200kL tank must be provided to collect and reuse
               runoff from the motel.


                                                                                     Page 6 of 16

Section 7

SPECIAL MEETING MINUTES                                                            5 JUNE 2019


        b.   The detention tanks must be sized to ensure no increase in peak discharge from
             the site for all events from 63%AEP to 1% AEP inclusive.
        c.   The first application for Operational works for the development must include a
             Music Model prepared in accordance with the Water by Design Music Modelling
             Guidelines, and which demonstrates that the development layout proposed in the
             Operational Works application will achieve the State Planning Policy Water
             Quality Objectives of 80% Reduction in Total Suspended Solids, 60% Reduction
             in total Phosphorous, and 45% reduction in Total Nitrogen. The results of the
             MUSIC modelling must also demonstrate that the developed site will discharge
             less annual loads of Total Nitrogen, Phosphorous and Total Suspended Soils
             respectively compared to the pre-development scenario.
        d.   The pervious percentage of the development must be consistent with the
             pervious percentage derived from attached Simmonds & Bristow Drawing 1108-
             155C-01-02 Rev C (13 January 2012). RPEQ certification must be submitted to
             Council that states the pervious percentage of the final development is consistent
             with that derived from the Simmonds & Bristow Drawing.
        e.   The configuration of the stormwater quantity and quality components of the
             stormwater management system must be generally in accordance with Figure
             SW-1 (attached) unless otherwise agreed by Council.
        f.   The bioretention system must be formed with batters and not walls and include
             a minimum width of 5 metres.
        g.   Unless directed otherwise by Council, the detention tank will be covered.
        h.   The plan shall include detailed information in relation to the following aspects of
             the design of the bio-retention system:
             i.     calculations of underdrainage requirements for the bio-retention system;
             ii.    filter media composition requirements;
             iii.   a schedule which details how the construction, establishment, certification
                    and various inspections associated with each treatment measure relate to
                    other civil works;
             iv.    Where bioretention basins are used for stormwater quality treatment, the
                    design must be consistent with all aspects of the Water by Design (2014)
                    Bioretention Technical Design Guidelines Version 1.1) Healthy Waterways
                    Ltd Brisbane, including for free draining outlets to and from the bioretention
                    basins, and include completed copies of the design check and
                    summary contained within that document to confirm free draining outlets,
                    within reasonable construction tolerance capabilities are achieved; and
             v.     presentation of groundwater testing results which demonstrate that all parts
                    of the treatment measures are located above seasonal high groundwater
                    levels.
             A copy of the detailed civil drawings for the bio-retention system must be included
             as an appendix to the plan.
        i.   The plan must include a comprehensive Maintenance Plan for the detention tank
             and the bioretention system including the frequency of cleanout, methods of
             cleanout, and general maintenance. The plan will include the requirement for
             regular inspections and the keeping of records (to be maintained and made
             available to Council upon request). The plan is also to stipulate that all necessary
             improvements are required to be made immediately upon awareness of any
             deficiencies in the treatment measure/s. The detention tank is to be capped and
             trafficable.

                                                                                    Page 7 of 16

Section 8

SPECIAL MEETING MINUTES                                                               5 JUNE 2019


          j.    The plan shall include details the costs of maintenance (including periodic
                replacement of filter media) over the life of the asset.
    22.   The Maintenance Plan (including costing) must be included in any Community
          Management Statement for the site.
    23.   The Body Corporate for the site must enter into a contract with a suitably qualified
          contractor(s) for the maintenance of the stormwater quantity and quality devices and
          provide evidence of both the contract and execution of the contract upon request by
          Council.
    24.   Prior to the commencement of use, certification is to be submitted to Council from a
          suitably qualified stormwater quality specialist to verify that the bioretention works have
          been constructed generally in accordance with the approved civil works plans,
          conditions of approval and relevant sections of the Construction and Establishment
          Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy Waterways
          Partnership). Council approval of the constructed stormwater management system is
          required prior to commencement of use.
    25.   Certification is required to include all relevant items noted in Construction and
          Establishment Guidelines: Swales, Bioretention Systems and Wetlands (SEQ Healthy
          Waterways Partnership) including completed and signed forms.
          Acid Sulfate Soils
    26.   The application for operation works must include an Acid Sulfate Soil and Groundwater
          Management Plan for the development prepared by a suitably qualified person and in
          accordance with relevant State Government Policy and Guidance material to prevent
          any impact to the receiving environment as a result of development within actual or
          potential acid sulfate soils, and associated groundwater impacts. Detail design plans
          provided with the application for operation works approval must demonstrate how the
          bedding surrounding underground pipework will be managed to prevent continual
          dewatering of groundwaters along it to the receiving environment, and how any impacts
          to groundwater from proposed filling on potential or actual acid sulfate soils will be
          managed.
          Easements
    27.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    28.   All easements for public or third party infrastructure must be in accordance with the
          planning scheme and granted at no cost to the Grantee. Where the Grantee is Council
          or a service authority, the easement documentation must be in accordance with the
          Grantee’s standard easement terms. Draft easement documentation must be
          submitted to Council for endorsement.
    29.   All works must be kept clear of any existing or proposed easements for public or third
          party infrastructure on the subject land, unless agreed otherwise in writing by the
          Grantee.
          Earthworks and Retaining Walls
    30.   All earthworks and associated retaining structures/batters must be undertaken in
          accordance with an Operational Works approval, and contained entirely within the
          subject site unless written permission from the respective landowner(s) is provided to
          Council.
    31.   Earthworks carried out on site must not affect the structural integrity of any of the
          existing buildings and/or services and/or structures and/or lands that border the
          development site.

                                                                                      Page 8 of 16

Section 9

SPECIAL MEETING MINUTES                                                             5 JUNE 2019


          Damage to Services and Assets
    32.   Any damage caused to existing services and assets as a result of the development
          works must be repaired at no cost to the asset owner at the following times:
          a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          b.    where otherwise, upon completion of the works associated with the development.
          Any repair work which proposes to alter the alignment or level of existing services and
          assets must first be referred to the relevant service authority for approval.
          Outdoor Lighting
    33.   Any outdoor lighting with the potential to affect surrounding residential premises shall
          be designed, installed, operated and maintained in accordance with AS4282 “The
          Control of the Obtrusive effects of Outdoor Lighting”.
          Fencing and Walls
    34.   Any street fencing to David Low way or Sandpiper Court must be set back an average
          of 1 metre from the front property boundary. Any fencing on the front boundary must
          either:
          a.    not exceed a maximum height of 1.2m
          b.    be of open construction.
          Street Identification
    35.   The street address of the development must be clearly visible and discernible from the
          primary frontage of the site by the provision of a street number and, where appropriate,
          the building name.
          Clothes Drying Areas
    36.   Each dwelling unit in Stage 2 must be provided with access to an outdoor clothes line
          which is screened from public view.
          Performance Bond
    37.   Security in the form of a cash bond or trading bank guarantee to the sum of $50,000
          for stage 1 and $50,000 for stage 2 must be submitted to Council, to secure
          performance of all conditions of this approval, prior to the issue of a Development
          Permit for Operational Works. The cash bond or trading bank guarantee will be
          returned on performance of the conditions of approval less any costs incurred by
          Council in respect of enforcing performance of this permit. Council reserves the right
          to call upon the bond or guaranteed sum to effect compliance with conditions.
          Community Management Statement
    38.   Any proposed Community Management Statement required for the development
          pursuant to the Body Corporate and Community Management Act 1997 must be
          submitted to Council for endorsement at the same time as submission of the Building
          Format Plan (or similar) to Council for compliance assessment.
          Sunset Clause for Completion of Approved Development
    39.   Pursuant to s88(1) of the Planning Act 2016, the aspects of this development approval
          which have not been completed within 8 years of the date the development approval
          takes effect, lapse.
          Fauna Management
    40.   Vegetation must only be removed or disturbed in accordance with a Fauna
          Management Plan (or part thereof) prepared by a qualified person* and endorsed
          through an Operational Works approval and include the following items:

                                                                                    Page 9 of 16

Section 10

SPECIAL MEETING MINUTES                                                             5 JUNE 2019


          40.1. The Fauna Management Plan must address and demonstrate compliance with
                the requirements of Schedule 11 Part 2 Section 7 of the Planning Regulation
                2017.
          40.2. Identify all koala habitat trees on plan
          Landscaping Works
    41.   The development site must be landscaped in accordance with a Council endorsed
          landscape package prepared by a qualified person*. The works must be undertaken in
          accordance with an Operational Works approval, Planning Scheme Policy 3
          Landscape Plants and Guidelines and must include in particular:
          41.1. Clear integration of the Bushfire requirements for the site, including landscaping
                treatment to the western 20m building setback area using low threat vegetation.
          41.2. Landscaping adjacent to the northern boundary of the subject land within the
                Rufus Street reserve and Rufous laneway to provide a visual buffer to the
                development.
          41.3. 3m wide landscaping in the northern building setback area from Rufous Street
                and Rufous Lane to the dwelling units such landscaping to comprise a
                combination of lawn and vegetation to facilitate a usable “backyard” space.
          41.4. Landscaping to the Rufous Street pedestrian link between dwelling units 13 and
                14.
          41.5. Landscaping to the eastern boundary adjacent the adjoining hotel boundary
          41.6. Landscaping to the Visitor accommodation Type 4 motel building and all other
                Visitor accommodation Type 4 dwelling units.
          41.7. Landscaping to the park areas in the north east and north west portions of the
                site.
          41.8. Details of water quality treatment device plantings.
          41.9. Details of the landscaping treatment to the western portion of the site between
                the road and the reserve.
          41.10. Details of any fencing and gates, including acoustic fencing, the fencing to the
                 shopping centre and the Rufous Street and Rufous Lane and any fencing to the
                 western reserve.
          41.11. Details of protection methods to be engaged to protect trees located on the
                 northern and southern boundaries.
          41.12. the western boundary of the IGA supermarket development, within that
                 development site.
          41.13. Native trees of a minimum bag size of 100L to replace existing trees to be
                 removed from the site, at the rate of 1 replacement tree for every tree removed
                 that has a diameter greater than 200mm measured at 1.2 metres from ground
                 surface level.
    42.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures healthy,
          sustained and vigorous plant growth. All plant material must be allowed to grow to full
          form and be refurbished when its life expectancy is reached.
    43.   All landscape works must be maintained generally in accordance with the approved
          design for the life of the development.
          Bushfire
    44.   All works must be carried out in accordance with a Bushfire Management Plan

                                                                                   Page 10 of 16

Section 11

SPECIAL MEETING MINUTES                                                             5 JUNE 2019


          prepared by a qualified person* and endorsed through an Operational Works approval
          which includes:
          44.1. Details in accordance with the Final Negotiated Agreement for Bushfire, dated
                18 October 2018, for Appeal 4066 of 2017 including:
               i.     Amended drawings demonstrating functional bitumen or concrete one-way
                      4.0 metre wide access for motor vehicles between the western boundary
                      of the IGA site and the eastern landscape edge of the Visitor
                      accommodation Type 4 motel building to Sandpiper Court generally in
                      accordance with Annexure A to the agreement.
               ii.    Motel Emergency and Evacuation Plan including a Bushfire Preparedness
                      Manual prepared for the annual use of the Body Corporate. This manual
                      must include an evacuation plan that has a training schedule when any fire
                      season reaches “extreme” and a requirement that in the event of a bushfire
                      the motel carpark will be locked preventing guests evacuating by vehicle.
               iii.   Landholder Information Kit for residential dwellings, which detail landscape
                      treatments, safe egress routes and general bushfire safety
          44.2. Pedestrian emergency access out to the north.
          44.3. Provision of 4 Fire hydrants will be provided along the western access edge.
                These must have both urban and rural fittings suitable for Fire Brigades.
          44.4. Provision of information regarding the functionality of the Bushfire Management
                Plan, if the development is staged.
    45.   A copy of the Bushfire Management Plan for the development must be provided to the
          nearest fire authority.
    46.   Certification must be submitted to Council from a qualified person* prior to
          commencement of the use which certifies that the development has been constructed
          in accordance with the bushfire management conditions of this Decision Notice.
          *(Refer to Advisory Note)
          Environmental Management Plan
    47.   An Environmental Management Plan (EMP) for the Site shall be prepared and
          implemented by persons holding appropriate environmental qualifications and proven
          expertise in the preparation and implementation of EMPs, to ensure that the impact on
          the environment of the construction and operation of the Development is minimised,
          the Environmental Values of the Site are protected and enhanced and the
          Development is ecologically sustainable.
    48.   The EMP shall be cognisant of the following:-
          48.1. The EMP shall demonstrate a high level of environmental care and responsibility
                and be consistent with best practice for developments of this type in similar
                environments.
          48.2. The EMP shall detail the Developer’s environmental policy and the proposed
                environmental management system for the Site.
          48.3. The EMP shall specify:
               i.     the performance targets, including those derived from the Conditions and
                      other requirements arising from legislation and other approvals;
               ii.    how the performance targets are to be achieved;
               iii.   who is responsible;
               iv.    when the performance targets will be satisfied;
               v.     how performance will be monitored;
                                                                                   Page 11 of 16

Section 12

SPECIAL MEETING MINUTES                                                              5 JUNE 2019


                vi.     corrective actions and contingency measures;
                vii.    reporting arrangements;
                viii.   auditing arrangements;
                ix.     how the requirements are to be incorporated into construction and works
                        contracts;
                x.      how the Developer’s employees, contractors and the contractor’s
                        employees will be informed and trained with respect to the environmental
                        protection requirements; and
                xi.     enforcement and penalties for non-compliance.
          48.4. In particular, but without limitation, the EMP shall address the following issues in
                relation to the construction phase:
                i.     legislative compliance;
                ii.    soil erosion and sediment control;
                iii.   vegetation protection;
                iv.    fauna and fauna habitat protection;
                v.     weed and pest control;
                vi.    water quality protection;
                vii. ground water protection;
                viii. air quality protection;
                ix.    storage and handling of hazardous substances;
                x.     noise and vibration management;
                xi.    waste management;
                xii. cultural heritage management;
                xiii. visual amenity protection;
          48.5. In particular, but without limitation, the EMP shall address the following issues in
                relation to the operational phase:
                i.      legislative compliance;
                ii.     water conservation;
                iii.    water quality protection;
                iv.     maintenance of Stormwater Quality Improvement Devices
                v.      vegetation protection;
                vi.     fauna protection;
                vii.    bushfire control;
                viii.   weed and pest control;
                ix.     biting insects management
                x.      waste management.
    49.   The EMP shall be submitted to Council prior to or in conjunction with the lodgement of
          any development applications for Operational Works for the Site. Operational Works
          approval shall not be granted until the EMP is approved by the Manager Development
          Assessment. The Developer shall comply with the requirements of the EMP.
          Building Demolition/Removal/Relocation
    50.   Where the development involves the removal, relocation or demolition of a building, a
          Waste Management Plan (construction and demolition) shall be submitted and
          approved by Council’s Environmental Health Officer prior to issue of a development
          permit for operational works for demolition, removal or relocation of any building other
          than a shed.

                                                                                    Page 12 of 16

Section 13

SPECIAL MEETING MINUTES                                                                 5 JUNE 2019


          The purpose of the Waste Management Plan is to facilitate the segregation of waste
          for the effective reuse and recycling of such materials. Segregated wastes attract
          significantly reduced disposal fees at the landfill with some items free. Higher gate
          fees are charged for mixed waste.
          Waste Management Plans (construction and demolition) are required to be submitted
          in accordance with Planning Scheme Policy 11, Waste Management Plans.
          Waste storage areas are to provide for adequate separation of all reusable, recyclable
          and waste materials. These shall be located so that they are convenient and safe to
          use.
          The Plan shall contain the following information:
          a.    The site area for the storage and separation of waste is to be shown on the plan
                drawings accompanying the application
          b.    A waste management table as indicated below is to be completed showing how
                waste material is to be segregated - recycled – reused or disposed.
          c.    Table – Waste Management Table
          MATERIALS ON-SITE                                   DESTINATION
                                                  Re-use and Recycling                  Disposal
          Expected        Estimated      On-site            Off-site                *specify
          waste           volume(m³)     *specify proposed *specify contractor      contractor and
          materials                      re-use or on-site  and recycling outlet    landfill site or
                                         recycling methods                          other disposal site
          Excavation
          material
          Green waste
          Bricks
          Concrete
          Timber-please
          specify
          Plasterboard
          Metals -
          please specify
          Asbestos
          Other - please
          specify
          Note * If a demolition contractor is undertaking works, then the Waste Management table is to
          be completed by the demolition contractor.
          Waste Storage
    51.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy 9, Waste Management, including an external imperviously
          paved area correctly sized for all refuse and recycling containers and suitably screened
          from public places and neighbouring properties.
    52.   A bin wash area is required with a cold-water tap, hose and drain outlet connected to
          sewer, via a bucket trap. The drain outlet is to be designed to prevent storm water entry
          to the sewerage system which can be achieved by a bunded area, with a nib wall height
          of 100mm maximum, enclosing a wash area of 700mm x 700mm minimum (max
          0.7m²). Alternatively, the waste area can be roofed, or any other appropriate design
          approved by Council.
          Noise
    53.   Upgraded building envelope constructions and the provision of mechanical
          ventilation/air conditioning which achieves the ventilation requirements of the Building
          Code of Australia, in accordance with the Second Joint Report of Experts in Noise (30
          May 2018) for Planning and Environment Court Appeal 4066 of 2017, including:

                                                                                       Page 13 of 16

Section 14

SPECIAL MEETING MINUTES                                                             5 JUNE 2019


          i.     the facades of the Visitor accommodation Type 4 motel building facing towards
                 the IGA building and IGA carparking area;
          ii.    the facades of the Visitor accommodation Type 4 dwelling units facing towards
                 the IGA building; and
          iii.   the facades of the Visitor accommodation Type 4 dwelling units facing towards
                 the hotel building, drive-through access road and drive-through bottleshop, and
                 carparking areas.
    54.   Prior to the commencement of use written certification is required from a suitably
          qualified person confirming that upgrades to the building facades and provision of
          mechanical ventilation/air conditioning comply with the recommendations of the
          Second Joint Report of Experts in Noise (30 May 2018) for Planning and Environment
          Court Appeal 4066 of 2017.
    55.   Prior to the commencement of any use or sealing of Plan of Survey, whichever occurs
          first, an acoustic screen must be constructed around the IGA rooftop mechanical plant
          to a height of 3.0 metres above the roof level plant deck, as shown on Figure 4 and
          described in Section 4.6 of the Second Joint Report of Experts in Noise (30 May 2018)
          for Planning and Environment Court Appeal 4066 of 2017.
    56.   Prior to the commencement of use of the Visitor accommodation Type 4 dwelling units
          an acoustic barrier along the common boundary of the development site with the
          Peregian Beach Hotel must be constructed. The barrier shall be constructed of
          materials to achieve a minimum surface density 12.5 kg/m2 and a height 2.5 metres
          above the hotel pavement level along the boundary of the site and adjacent to the hotel
          drive-through lane and carparking areas, as shown on Figure 4 and described in
          Section 4.8 of the Second Joint Report of Experts in Noise (30 May 2018) for Planning
          and Environment Court Appeal 4066 of 2017.
    57.   Written certification is required from a suitably qualified person confirming that sound
          pressure levels from all mechanical plant and equipment within the development site
          comply with the following when measured at the façade of any habitable room or formal
          outdoor area of the Visitor accommodation Type 4 motel building or the Visitor
          accommodation Type 4 dwelling units. Noise levels to be measured as LAeq adj 15min
          where adjustments refer to tonality or impulsivity, in accordance with the most recent
          edition of the Queensland Noise Measurement Manual:
          a.     Air-conditioning and Refrigeration
                 i.     7am to 10pm: Maximum level allowable = background + 5dB(A)
                 ii.    10pm to 7am: Maximum level allowable = background + 3dB(A)
          b.     Pumps
                 i.     7am to 7pm: Maximum level allowable = background + 5dB(A)
                 ii.    7pm to 10pm: Maximum level allowable = background + 3dB(A)
                 iii.   10pm to 7am: No audible noise.
          The certification must be submitted to Council prior to commencement of the use,
          which certifies that operational noise from any fixed plant and equipment complies with
          the requirements of this Decision Notice.
    58.   Written certification is required from a suitably qualified person confirming that sound
          pressure levels from all mechanical plant and equipment from the existing IGA
          shopping centre comply with the following when measured at the boundary of the newly
          created lot. Noise levels to be measured as LAeq adj 15min where adjustments refer
          to tonality or impulsivity, in accordance with the most recent edition of the Queensland
          Noise Measurement Manual:


                                                                                   Page 14 of 16

Section 15

SPECIAL MEETING MINUTES                                                               5 JUNE 2019


          a.     Air-conditioning and Refrigeration
                 i.     7am to 10pm: Maximum level allowable = background + 5dB(A)
                 ii.    10pm to 7am: Maximum level allowable = background + 3dB(A)
          b.     Pumps
                 i.     7am to 7pm: Maximum level allowable = background + 5dB(A)
                 ii.    7pm to 10pm: Maximum level allowable = background + 3dB(A)
                 iii.   10pm to 7am: No audible noise.
          The certification must be submitted to Council, which certifies that operational noise
          from any fixed plant and equipment complies with the requirements of this Decision
          Notice. The certification must be provided prior to sealing of the plan of survey or
          commencement of use of the Visitor accommodation Type 4 motel building, whichever
          occurs first.
    59.   When requested by Noosa Council, a Noise Impact Assessment Report (NIAR)
          showing monitoring and recording of noise levels must be undertaken to investigate
          any non-vexatious complaint caused by noise emissions from operations at the
          premises. Such monitoring must be undertaken and completed within a reasonable
          and practicable timeframe as nominated by council and be performed by a suitably
          qualified and experienced person.
    60.   The NIAR is to be submitted to Council detailing the results of such monitoring and
          recommendations for any measures to achieve compliance with noise emission limits
          set out in Conditions 57 and 58
    RECONFIGURATION OF A LOT
          Approved Plans
    61.   Development undertaken in accordance with this approval must generally comply with
          the approved plan listed in the following table unless otherwise amended by these
          conditions.

      Plan No.             Rev.   Plan/Document Name                         Date
      7254 prop sub        C      Proposed Subdivision Plan                  28 February 2019
    62.   An underground connection to reticulated water and sewerage must be provided to
          each lot in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    63.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to each lot.
    64.   Prior to sealing of the plan of survey the following works must be completed to the
          reasonable satisfaction of Council:
          a.     The required noise attenuation works to the existing IGA building.
          b.     All driveway accesses to each lot.
          c.     All pedestrian pathways.
    65.   Any future subdivision of the Visitor accommodation – Type 4 development within
          Stage 2 on the approved plans must be a community title scheme building format plan
          with:
          a.     the twenty (20) separate lots in the format plan being defined by the footprint of
                 each dwelling unit building;
          b.     the balance area of that part of the subject land being included in relevant
                 common property; and


                                                                                    Page 15 of 16

Section 16

SPECIAL MEETING MINUTES                                                               5 JUNE 2019


          c.     the curtilage of each of the particular dwelling units being allocated to that
                 dwelling unit as exclusive use area.
          Easements
    66.   Easement for the purposes of:
          i.     All stormwater quality treatment devices;
          ii.    Bushfire access;
          iii.   Pedestrian access from the motel (lot 2) to connect to the IGA Shopping Centre
                 through lot 3; and
          iv.    Driveway vehicle access to each lot,
          must be registered against the titles of the properties in favour of the relevant authority
          and/or property over the land area on the subject site .
    67.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    68.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
          Electricity and Telecommunication Services
    69.   Reticulated electricity and telecommunication services must be provided to each lot in
          accordance with the standards and requirements of the relevant service provider.
    70.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
    71.   Certification must be submitted to Council from all relevant service providers which
          certifies that the development has met the requirements of this Decision Notice and all
          applicable legislation at the time of construction.




3   MEETING CLOSURE
    The meeting closed at 11.21am.




                                                                                     Page 16 of 16

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.