Council archive · source document
05. Town Planning Report · MCU10/2127
From the archive MCU10/2127 Development Application part 2 of 2 Plans 5 Morwong Drive Noosa Heads. File date in the archive: 2010-12-20 09:49.
Very large file (41.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
QUEENSLAND LAND REGISTRY ENLARGED PANEL Form 20 version 2
Land Title Act 1994, Land Act 1994 and Water Act 2000 Page 47 of 107
r
(ii)
di)
(kk)
(ll
4
Riparian Rehabilitation Plan means the riparian rehabilitation plan applicable to the Scheme Land a
copy of which is retained available for inspection by Owners at the office of the Body Corporate
Manager for the Scheme;
Title Reference [Title Reference]
Scheme means the Viridian Noosa Community Titles Scheme containing the Lots and the Common
Property;
Site means Lot 903 on SP 221527, County of March, Parish of Weyba situated at Noosa between
Bayview Road, Morwong Drive and Viewland Drive, Noosa and Includes any land created upon
subdivision of that land;
Site Management Plan means the site management plan dated and issued 15 April 2003 (including
any valid and approved variations or amendments thereto) being in existence due to the Site being
recorded on the EMP. Each Owner acknowledges having received notice in writing, by this document
that the particulars of the Site as it presently exists have been recorded in the EMR, and that the Site is
subject to the SMP, details of which have been offered to each Owner (being a Buyer under the
Contract to which this Disclosure Document is annexed or forms part) and are available for inspection
before or after signing of a Contract to purchase a Lot;
(mm) Storm Water Management Plan means the storm water management plan applicable to the Scheme
land, a copy of which is retained available for inspection by Owners at the office of the Body Corporate
Manager for the Scheme;
(nn) Traffic Management Plan means the traffic management plan applicable to the Scheme Land a copy
of which is retained available for inspection by Owners at the office of the Body Corporate Manager for
the Scheme;
(oo) Waste Management Pian means the waste management plan applicable to the Scheme Land a copy
of which is retained available for inspection by Owners at the office of the Body Corporate Manager for
the Scheme;
(pp) Water Quality-Stormwater Management Plan means the water quality-storm water management
plan applicable to the Scheme Land a copy of which is retained available for inspection by Owners at
the office of the Body Corporate Manager for the Scheme;
(qq) Vutnerable Piants means the Cryptocarya foetida.
3.2 Interpretation
(a) Reference to:
{i) the singular includes the plural and the plural includes the singular;
{ii) @ person means a person bound by these By-laws and Includes a body corporate, an unincorporated
association or an authority: and
(iii) a statute, regulation or provision of a statute or regulation (Statutory Provision) includes:
(b) that Statutory Provision as amended or re-enacted from time to time; and
(c) a statute, regulation or provision enacted in replacement of that Statutory Provision.
(d) “including” and similar expressions are not words of limitation.
[_B8946eve
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
05. Town Planning Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 41.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.