Original source · versioned page text
2019-02-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 FEBRUARY 2019
48.4. Provide 100L NATSPEC street trees every 8m of road frontage, positioned
in a manner that supports adequate sightlines and maintains existing trees
identified for retention in this permit.
48.5. Provide details of internal landscaping to the development, including
provision of suitable growing media and area to sustain landscaping, which
will provide shading and soften the visual appearance of the development.
48.6. Provide landscaping to each dwelling frontages and internal driveway
networks to provide shade and visual amenity.
48.7. Provide 1 suitable large canopy shade tree in the centre median near the
2 visitor car spaces at the Y junction located internal to the site.
48.8. Provide details of the methods to be used during the vegetation clearing
including the use of licensed spotter/catchers, disposal of cleared
vegetation, methods to ensure retained vegetation is protected from
development works, in particular where works are proposed adjacent to
root zones of vegetation located on the road reserve with reference to
current AS 4970-2009 Protection of Trees on Development Sites.
49. The open space and setback areas are to be landscaped in accordance with
Council’s Policy on Landscaping Guidelines and a properly prepared landscape
plan prepared by a suitably qualified Landscape Architect or Horticulturalist. Such
landscaping is to be completed prior to the premises being occupied and
maintained at all times thereafter.
ENVIRONMENTAL HEALTH
Waste Management
50. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”. The facilities must include an external
impervious area correctly sized for all refuse and recycling containers and
suitably screened from public places and neighbouring properties. A bin wash
area is required with a cold-water tap, hose and drain outlet connected to sewer,
via a bucket trap. The drain outlet must be designed to prevent storm water entry
to the sewerage system. This can be achieved with a nib wall 50mm high and up
to 700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be
roofed, or any other design approved by Council.
51. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
Mechanical Equipment
52. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following:
a. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
Page 12 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.