2019-02-18 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 18 FEBRUARY 2019
21.3. The works (Kauri Street, Olivine Street and the intersection) must include
suitable drainage structures and stormwater collection to ensure that runoff
from the road formation is collected, controlled and directed to ensure that
the roadway is safely trafficable and must be in compliance with the
relevant sections of the Queensland Urban Drainage Manual (QUDM).
21.4. As part of the application for operational works, the developer’s civil
engineering consultant shall investigate and report on the possible
deficiencies in the existing stormwater system, to the western end of Agate
Street and including inspection by closed circuit television (CCTV) of the
existing stormwater system. The developer is required to rectify any
deficient stormwater pipes or structures extending from the development
frontage down to and including the manhole downstream of the 600x1200
box culvert which crosses Kauri Street.
21.5. The design and construction of all works shall be carried out in accordance
with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks and the applicable
engineering standards current at the time of construction.
The above condition is imposed pursuant to s145 of the Planning Act 2016
being non-trunk infrastructure.
22. All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the
existing infrastructure must be undertaken to complete the roadworks widening
and must be carried out in accordance with the applicable engineering standards
and the tree retention requirements of this approval.
In this regard a schedule of works, specifications and plans detailing this work
shall be prepared and submitted to Council for approval prior to obtaining a
Development Permit for Operational Works
23. The applicant must truncate the boundaries at the intersection of Kauri Street
and Olivine Street and dedicate the truncated section as “Road”. The truncation
must be in accordance with Council’s Planning Scheme Policy PSP 5 –
Engineering Design Standards- Roads, Drainage and Earthworks part 3.13 (g).
The dedication must be undertaken at no cost to Council.
Pathway and Frontage Works
24. A new 2.0m wide concrete path must be constructed along the Kauri Street and
Olivine Street frontages of the site in accordance with an Operational Works
approval and to a desirable and smooth alignment for the comfort of users and
protection of trees identified in this permit for retention. The new path must be in
compliance with IPWEAQ standard drawing SEQ R-065 Concrete Pathway
Construction Details.
The works must include a sufficient number of pram ramps to be provided near
the intersection of Kauri Street and Olivine Street where identified by Council to
connect to existing and proposed pathways network.
The above condition is imposed pursuant to s145 of the Planning Act 2016 being
non-trunk infrastructure.
Page 8 of 15