Attachment 11- Code Compliance Report
COMPLIANCE
PERFORMANCE OUTCOME ACCEPTABLE OUTCOME RESPONSE
//NA
intended use is captured and used on-site for used throughout the development these are proposed for
non-potable purposes and incorporated into a the purposes of irrigation.
stormwater management plan for the
development.
Editor’s note—The Queensland Development Code
includes provisions for the installation of rain water
tanks and the reuse of stormwater.
PO3 AO3.1 Complies with AO3.1
Development reduces stormwater run-off by Development incorporates water sensitive urban The site provides for existing bioretention basin which
minimising impervious areas and maximising design measures to manage stormwater. involve vegetated bed of filter material including stones. The
site vegetation to absorb water on site. development also proposes stormwater quality treatment
methods to be contained within the detention tanks that
will be implemented to manage stormwater quantity- Refer
to the Stormwater Management Plan within Attachment 8.
AO3.2 Complies with PO3
Development incorporates porous pavements The proposed development provide for 14.10%% of the
on low trafficked areas such as footpaths and car development site to be landscaped. Per the Landscape
parks. Concept Plan (Attachment 3) landscaping areas are
proposed throughout the development notably on all
boundary frontages and within the Village Green.
Note: Porous pavements are not considered
Stormwater run off will hit these areas and be absorbed into
landscaping and do not form part of the
the ground which will allow the environment to thrive.
minimum landscape requirements.
PO4 No acceptable outcome provided. Complies with PO4
Development limits changes and The development has sought to minimis the extent of
disturbances to the site topography to earthworks as much as possible and maximise on the
preserve existing drainage channels as much existing topography. Whilst excavation is proposed
as possible. predominantly due to the proposed basement, the Site
Based Stormwater Report- Attachment 6 appropriately
manages stormwater any natural drainage.
Landscape
Code Compliance Statements Page 110 of 136
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 11- Code Compliance Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.