Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Attachment 11- Code Compliance Report

of 136
                                                                                                        COMPLIANCE
 PERFORMANCE OUTCOME                           ACCEPTABLE OUTCOME                                                  RESPONSE
                                                                                                        //NA
                                               intended use is captured and used on-site for                       used throughout the development these are proposed for
                                               non-potable purposes and incorporated into a                        the purposes of irrigation.
                                               stormwater management plan for the
                                               development.

                                               Editor’s note—The Queensland Development Code
                                               includes provisions for the installation of rain water
                                               tanks and the reuse of stormwater.

 PO3                                           AO3.1                                                               Complies with AO3.1
 Development reduces stormwater run-off by     Development incorporates water sensitive urban                      The site provides for existing bioretention basin which
 minimising impervious areas and maximising    design measures to manage stormwater.                               involve vegetated bed of filter material including stones. The
 site vegetation to absorb water on site.                                                                         development also proposes stormwater quality treatment
                                                                                                                   methods to be contained within the detention tanks that
                                                                                                                   will be implemented to manage stormwater quantity- Refer
                                                                                                                   to the Stormwater Management Plan within Attachment 8.
                                               AO3.2                                                               Complies with PO3
                                               Development incorporates porous pavements                           The proposed development provide for 14.10%% of the
                                               on low trafficked areas such as footpaths and car                   development site to be landscaped. Per the Landscape
                                               parks.                                                              Concept Plan (Attachment 3) landscaping areas are
                                                                                                                  proposed throughout the development notably on all
                                                                                                                   boundary frontages and within the Village Green.
                                               Note: Porous pavements are not considered
                                                                                                                   Stormwater run off will hit these areas and be absorbed into
                                               landscaping and do not form part of the
                                                                                                                   the ground which will allow the environment to thrive.
                                               minimum landscape requirements.

 PO4                                           No acceptable outcome provided.                                     Complies with PO4
 Development limits changes and                                                                                    The development has sought to minimis the extent of
 disturbances to the site topography to                                                                            earthworks as much as possible and maximise on the
 preserve existing drainage channels as much                                                                      existing topography. Whilst excavation is proposed
 as possible.                                                                                                      predominantly due to the proposed basement, the Site
                                                                                                                   Based Stormwater Report- Attachment 6 appropriately
                                                                                                                   manages stormwater any natural drainage.

 Landscape

Code Compliance Statements                                                                                                                        Page 110 of 136

Log in to download the original (Attachment 11- Code Compliance Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.