Original source · versioned page text
Attachment 11- Code Compliance Report
Character Plan) and Figure 7.2.5.4 (Noosa Junction the flow of pedestrians and vehicles in a compatible
Framework and Character Plan). manner. A Pedestrian Movement Plan has been
prepared and included within the amened Architectural
Plans (Attachment 1). Pedestrian movement has been a
key design focus to ensure that permeability is not only
provided within the development but to the adjoining
future transit hub directly north and the existing centre
to the west.
AO59.2 Complies with AO59.2
Pedestrian arcades, laneways or enclosed Pedestrian arcades, laneways and enclosed
thoroughfares are a minimum of 6 metres wide, thoroughfares are limited in nature, integrating
provide a direct line of sight to a major pedestrian pedestrian linkages with other movement networks.
destination (major tenancy, car park, public place, Where applied, for example the proposed pedestrian
etc.), and are not dead ends, narrow or circuitous. bridge, is provided in a public space and of a dimension
that allows for direct line of sight. The pathway along the
western side of lot 3 maintains a width consistent with
the current easement (4.0m).
Specifically, the new laneways are provided within the
northern building of the Village Green accommodate for
a minimum 6m width.
PO60 AO60 Complies with AO60
Pedestrian and bicycle links are constructed Pedestrian and cycle networks are provided The proposed mixed-use development has been planned
throughout the centre with appropriate external including where identified indicatively on Figure generally in accordance with Figure 7.2.4.5 - Noosa
connections provided. 7.2.4.5 (Noosa Business Centre Framework and Business Centre Framework and Character Plan,
Character Plan) and Figure 7.2.5.4 (Noosa Junction providing the indicative pedestrian and cycle networks.
Framework and Character Plan).
A Pedestrian Movement Plan has been prepared and
included within the amened Architectural Plans
(Attachment 1). Pedestrian movement has been a key
design focus to ensure that permeability is not only
provided within the development but to the adjoining
future transit hub directly north and the existing centre
to the west.
PO61 AO61 Complies with PO61
No acceptable outcome provided
Code Compliance Statements Page 34 of 136
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 11- Code Compliance Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.