Original source · versioned page text
Attachment 11- Code Compliance Report
communities, environments or environmental significant ecosystems, downstream communities, or
processes. other environmental processes.
Infrastructure
PO64 AO64 Complies with PO64
Development is supported by adequate No acceptable outcome provided The proposed mixed-use development will be serviced
infrastructure and urban services including by the necessary infrastructure including but not limited
reticulated water, sewerage, stormwater drainage, to water, sewer, electricity, sealed roads and
sealed roads, pathways and electricity and stormwater.
telecommunication infrastructure.
Notably, as part of the redesign, the stormwater
detention for the site is largely located in the south and
has been sized to accommodate future development
undeveloped areas for further information, please refer
to Attachment 6 – Stormwater Management Plan
PO65 AO65 Complies with PO65
Development does not adversely impact on the No acceptable outcome provided The mixed-use development will connect, upgrade and
continued operation, viability and maintenance of establish new and existing service and infrastructure
existing infrastructure or compromise the future connections which have been assessed to ensure no
provision of planned infrastructure. unduly impacts on the surrounding areas. For further
note, please refer to Attachment 5– Site Serviceability
Report.
Showroom Precinct
Not Applicable
The proposed development is not located within the Showroom Precinct.
Business Park Precinct
PO67 AO67 Complies with AO67
Development provides for integrated commercial Development is to be generally consistent with In alignment with Figure 7.2.4.5- Noosa Business Centre
and professional office floor space offering a wide Figure 7.2.4.5- (Noosa Business Centre Framework Framework and Character Plan, the proposed
range of office-based uses and employment and Character Plan). development has designed the built design outcomes to
opportunities. reflect the key aspects identified including the key
pedestrian and cycle links, primary active street
frontages, the proposed indicative road, and the key
corer sites. The proposed business uses situated in the
north of the site are located within the Business Park
Code Compliance Statements Page 36 of 136
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 11- Code Compliance Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.