Attachment 11- Code Compliance Report
COMPLIANCE
PERFORMANCE OUTCOME ACCEPTABLE OUTCOME RESPONSE
//NA
a) within a designated transport noise
corridor; or
b) within 100 metres of an existing electricity
substation—
(i) incorporates noise attenuation
measures to mitigate noise impacts
and;
(ii) guests are not accommodated in
lightweight shelters (such as tents,
yurts, recreational vehicles, or
relocatable dwellings).
Editor’s Note— The State Planning Policy
Interactive Mapping System can be used to find
out if a property is located in a designated
transport noise corridor or close to electricity
infrastructure.
AO4.4
Accommodation within a water catchment area
relies on minimal clearing of natural vegetation,
earthworks, and movement of sediments or
nutrients from the site and any on-site disposal
of effluent is to a secondary treatment
standard.
Editor’s Note— The water supply buffer area is
shown on the Regional Infrastructure Overlay
Maps.
AO4.5
Accommodation does not occur within 400
metres of a sewerage treatment plant
Safety and Amenity
PO5 No acceptable outcome provided. Complies with PO5
Walkways, carparks and publicly accessible facilities,
including toilets, and bicycle racks are located and
Code Compliance Statements Page 93 of 136
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Attachment 11- Code Compliance Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.