142008.658.4 Compiled Decision Notice

of 1

Text shows just the words. Original shows the document exactly as it was published.

Officer:	Mark Lewis
Direct Telephone:	07 53296290
Our Reference:	MLEWIS:142008.658.4
Your Reference:	n/a
13 August 2015

Gateway Rise Pty Ltd
C/- Project Strategy Qld Oty Ltd
62 Buderim Ave
ALEXANDRA HEADLAND  QLD  4572

[email protected]

Dear Sir/Madam

Compiled Decision Notice
Sustainable Planning Act 2009

I refer to your request to extend the relevant period of an existing approval.  On 12 August 2015, Council decided your requested changes.

Details of the decision are as follows:
APPLICATION DETAILS

Application No:	142008.658.4
Street Address:	50 Gateway Dr NOOSAVILLE  QLD  4566
Real Property Description:	Lot 81 SP211687 (formerly Lot 14 SP170295)
Planning Scheme:	The Noosa Plan (16 September 2013)

DECISION DETAILS

Council on 8 July 2008 decided to issue the following type of approval:
Development Permit for Operational Works - Road & Drainage, Stormwater, Water & Sewerage

In relation to a request to make a change to the existing approval, Council on 20 May 2011 decided to:
Approve an extension to the relevant period to 17 January 2016
Approve a change to conditions 4,15,16,23(3) and 23(7) to indicate current details nd standards.
Include additional conditions 24 - 38,
Delete drawings 06583/SE1/T3 AND 06583/SE2/P1 from the approved plans table
Change advisory Note 1 and include additional advisory notes 2, 3 and E&SC notes

In relation to the request to extend the relevant period of the existing approval, Council on 12 August 2015 decided to:
A.	Approve an extension to the relevant period to 17 January 2018.

RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval will now end on 17 January 2018.

CONSOLIDATED ASSESSMENT MANAGER CONDITIONS

The development shall be carried out in accordance with the approved plans listed below or as modified herein.
Bikeway/footpaths shall be constructed where shown on the approved plans. The bikeway/footpaths shall have a slip resistant surface. The expansion joints in any bikeway/footpath shall be “saw cut”, not trowel jointed.
The total required pavement thickness shall be based on the Department of Main Roads’ Pavement Design Manual using soaked CBR tests of the subgrade.
The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager, Land Development for approval prior to placement of pavement material.
Council’s Construction Technical Officer (ph 07 5475 9866) shall be given seven (7) day’s notice of intention to commence works to arrange a “pre Start” meeting prior to the commencement of works.
The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any sub contractors also have the appropriate insurance and public liability documentation.
Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s signed approved drawings and conditions by the applicant.
The Consulting Engineers for the project shall be currently Registered Professional Engineers of Queensland (RPEQ).  The consulting engineers are responsible for arranging all inspections with Council’s Construction Technical Officer or nominated staff.  Council’s Construction Technical Officer shall provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-site meetings.  Construction Technical Officer will also sign the form at each stage when requested conditions have been satisfied.  The works will be accepted “On Maintenance” after this form, signed by the inspector for each stage is complete, together with a letter from the Engineer requesting that the works go “On Maintenance”.
Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This person will be the contact for the project).
An inspection is to be carried out with the relevant Council officers, the Contractor and Supervising Engineer after road centrelines have been established. This inspection is to deal with the limits of clearing to be carried out for this development. This meeting is to take place prior to the “Pre-start” meeting.
Council standards shall apply to these works unless otherwise modified herein.
The person acting on this permit shall ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property, road pavements or facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street furniture, etc) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land Development and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the sealing of the survey plan or, alternatively, the Applicant may request Council to carry out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to Council prior to the sealing of the survey plan.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being paid prior to the sealing of the survey plan.
The development of the site shall be carried out in such a manner as to prevent dust and/or sand nuisance to residents and/or tenants in the vicinity of the development.
Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended hours are approved by the Manager, Land Development, or his nominee.
All signage, including that for safety during construction, shall be in accordance with the Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
If footpath/road closures are necessary to carry out construction works, Council’s Construction Technical Officer (ph 07 5475 9866) must be notified prior to the proposed closure.
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. These measures must include as a minimum, but are not limited to, the following:
Ensure non essential exposure of soil is prevented by: restricting the extent of clearing to that necessary for access to, and safe construction of, the approved works; protecting vegetation in all other areas of the site; and by minimising the duration of soil exposure by:
staging the works to minimise the area of soil exposed at any one time
effectively stabilising cleared areas prior to rainfall if works are delayed or works are not intended to occur immediately. See E&SC Advice Note 1
effectively stabilising areas at finished level without delay and prior to rainfall; and
effectively stabilising steep areas, such as stockpiles, batters and embankments, which are not being actively worked and prior to rainfall
Where it is not feasible to effectively stabilise cleared areas of exposed soil, such as areas being actively worked, implement a full suite of erosion and sediment controls to maximise sediment capture in those areas and to minimise erosion such that erosion by all forms other than splash (raindrop impact) erosion and sheet erosion does not occur; and
In areas of exposed soil where it is not feasible to either effectively stabilise the surface or implement a full suite of erosion and sediment controls, for example in the areas being actively worked and where the implementation of some erosion and sediment controls would impede construction activities, ensure contingency measures are available on site and are implemented, prior to rain, to maximise sediment capture and to minimise erosion such that erosion by all forms other than splash (raindrop impact) erosion and sheet erosion does not occur
Effectively stabilise all stockpiles, batters and embankments without delay. Where it is not feasible to effectively stabilise a stockpile, batter or embankment, such as areas being actively worked, ensure that sediment controls are installed and surface stormwater flows are managed such that erosion of stockpiles, batters or embankments is not caused by concentrated stormwater flows
For all works or other disturbances undertaken within waterways (including riparian areas) ensure:
prior written approval from the relevant consent authority exists, 	and
Work within waterways must only be: undertaken during dry weather; be promptly rehabilitated conforming to the natural channel form, substrates and riparian vegetation as far as 	possible; and be undertaken in accordance with Best Practice Erosion and Sediment control, Appendix I – Instream works, Sections 14 and 16, International Erosion Control Association (2008)
Temporary vehicular crossings of waterways must be designed and constructed to convey flows and remain stable for all rainfall events up to the 1 in 10-year average recurrence interval (ARI) event of critical duration
Ensure clean stormwater is diverted or managed around or through the site without increasing the concentration of total suspended solids or other contaminants in the flow and without causing erosion (on site or off site). If it is not feasible to divert all areas discharging clean stormwater around or through the site, manage the clean stormwater runoff as for contaminated stormwater runoff, and ensure that sediment basins are sized to accommodate the additional volume of runoff (See E&SC Advice Note 2)
Ensure sheet flows of stormwater are managed such that sheet and rill erosion is prevented or minimized
Ensure that all concentrated stormwater flows including drainage lines, diversion drains, channels and batter chutes are managed onto, through, and at release points from the site in all rain events up to and including the average recurrence interval (ARI) event of 1 in 2 year ARI  without causing water contamination, sheet, rill or gully erosion, sedimentation, or damage to structures or property
Ensure measures have been implemented such that the runoff from all disturbed areas flows to a sediment basin or basins.  Where it is not feasible to divert runoff from disturbed areas of the site to a sediment basin, implement compensatory erosion and drainage controls prior to rainfall to ensure that erosion of those areas does not occur, including erosion caused by either splash (raindrop impact), sheet, rill or gully erosion processes (See E&SC Advice Note 3)
Ensure each sediment basin has the capacity to treat flows to current best practice standards (see E&SC Advice Note 4) and as a minimum to contain all the stormwater runoff from the 80th percentile 5 day rainfall depth and store 2 months sediment from the receiving catchment, as determined using the Revised Universal Soil Loss Equation
Ensure sediment basins are maintained with sufficient storage capacity to capture and treat the runoff for the design rainfall depth or event. Where sediment basins are proposed to be oversized for storage of captured water for re-use, install survey markers in each such basin to indicate the level that water within the basin must be lowered to, in order to meet the storage capacity specified in the above requirement
Ensure sediment basins are dewatered as soon as practicable after each rainfall event
Ensure that during dewatering, the concentration of total suspended solids (TSS) discharged does not exceed 50mg/L and that pH is within the range of 6.5-8.5. The concentration of TSS released by dewatering may only exceed 50mg/L where it can be demonstrated and supported through documentation that:
further significant rainfall is forecast to occur before the TSS concentration is likely to be reduced to 50mg/L ; and
releasing a higher concentration of total suspended solid will result in a better environmental outcome by providing storage for the capture and treatment of runoff from the imminent rainfall and runoff; and
flocculent has been applied and the concentration of TSS in the captured water has already significantly decreased.
Ensure sediment basins and associated structures such as inlets, outlets and spillways are structurally sound for 10 year ARI rainfall event, under normal circumstances and for 100 year ARI rainfall event, if failure of the basin poses a threat to downstream dwellings or public safety
Ensure accumulated sediment from basins and other controls is removed and disposed of appropriately without causing water contamination
Ensure sediment does not leave the site on the tyres of vehicles.
All stormwater drainage lines including private drainage lines (also known as inter-allotment drainage lines) or as otherwise approved by Council’s Manager of Land Development shall be inspected by closed circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this inspection.
A report of the CCTV inspection, including photographic records (which includes photos & video recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval.  Any defects or substandard works shall be recorded and accurately illustrated on the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants expense with a further CCTV inspection arranged once the rectification works have been completed.
To this extent all CCTV inspections, including any additional inspections necessary following defect identification and rectification, shall be entirely at the applicant’s expense.  Any costs incurred by Council in reviewing the CCTV inspection results shall also be borne by the applicant.
Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures.  All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures, finished ground levels and pavement surface levels.  The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format.  Guidelines on the use of ADAC are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage and Earthworks”.
Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council.
A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed on construction works during the maintenance period, which is a minimum period of 12 months duration. Such bond must be lodged by, and shall only be accepted from the Developer for the works.
The works to become Council assets will not be accepted "On Maintenance" until the landscaping is completed.
These works are also to be in compliance with the relevant conditions of Development Permit No. 2007/1626.
Notwithstanding that Council has checked the plans with due care, where it is found during construction that variations from Council's standards exist, then Council standards shall apply.
WATER SUPPLY and SEWERAGE INFRASTRUCTURE APPROVAL CONDITIONS
This Decision Notice is issued subject to and conditional upon the relevant Approved Development Permit having been granted to the applicant.
A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the date of this Decision Notice, and prior to commencement of works.

The names of any proposed contractors for works are to be submitted in writing, together with copies of current Public Liability and Workers Compensation Insurances together with certificates of currency for those policies, for consideration by the Assessment Manager seven (7) days prior to pre-start meetings and commencement of works. A separate letter will then be issued approving the contractor (or otherwise) for the works.  No other contractor or subcontractor shall be engaged to carry out the works or any part of the works without the written approval of the Assessment Manager.

Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence works.  A pre-start meeting shall be arranged prior to commencement of works by contacting Council’s Water & Sewerage Inspector, Mr Trevor Mourilyan, Ph. 5409 3870.  Inspector is only available for pre-start meetings, inspections and testing etc. between the hours of 6:30am to 4:00pm, Monday to Friday.  Inspector will not be available outside these hours unless prior approval is obtained from the Water & Sewerage Capital Works Manager with any costs incurred by Council outside the hours nominated above, met by the Contractor/Developer.  These costs will be in addition to normal inspection fees.

Not withstanding that council has checked the plans with due care, where it is found during construction that variations exist with Council’s standards, Council standards shall apply.

It is the responsibility of the applicant to ensure that its consultants and contractors take all reasonable care during the construction of the engineering works to ensure that Council property or facilities (such as underground drainage, water supply and sewerage) are protected against any damage or interference whatsoever.

If any Council property or facilities should be damaged by the applicant or any of its consultants or contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the engineering works, the applicant and/or its contractors shall forthwith notify the Assessment Manager and shall forthwith rectify the damage to that property or facility at its cost to the satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance of the works on-maintenance.  Alternatively, the applicant may request the Council to carry out the rectification work at the applicant's cost, such cost being paid by the applicant to the Council prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance' provided that in the case of emergency, the Council shall be entitled to rectify such damage at the cost of the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the work 'on maintenance'.

The Contractor shall make all necessary arrangements for supply of water required for construction works.  The use of hydrant standpipes on Council mains will NOT be  permitted.  Contractors should contact Council’s Water Section on phone 5409 3870 to obtain an application form for issue of a key to access Council’s water tanker filling stations. Conditions of 	access and location of filling stations are detailed on the application form.

All connections to existing live water mains are to be carried out by Noosa Council at completion of 	construction of internal works.

All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to acceptance 'on maintenance'.

CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following satisfactory completion of construction works.  The developer will be responsible for the full cost of CCTV inspection, including any additional inspection necessary following defect identification and rectification .  This charge is payable prior to commencement of works and will be determined on the unit rate basis current at the time of approval.

Bi-directional blue fire hydrant raised reflective markers are to be installed as per Noosa Shire Council requirements (Stimsonite Aust. Pty Ltd, Part No. 911AB or approved equivalent).

Bi-directional yellow valve raised reflective markers are to be installed as per Noosa Shire Council requirements (Stimsonite Aust. Pty Ltd, Part No. 911AY or approved equivalent).

All signage, including that for safety during construction shall be in accordance with the Manual of Uniform Traffic Control Devices and Main Roads Department Roadworks Signing Guide.

As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone 56 coordinate value to the standards and requirements of the Assessment Manager are required for Council records.  Such 'as constructed' drawings will be required prior to works being accepted "on maintenance", where applicable.  Requirements for "as constructed" information are detailed in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
Release of plans of survey and/or acceptance of the works on-maintenance will not be considered until lodgement of satisfactory 'as constructed' records.

Please note that bonding of outstanding works will not be considered by Council.

Your company, TOD Consulting Engineers as Consulting Engineers for the project, are responsible for arranging all inspections and ensuring that all relevant details required by Council are supplied.  The attached Water and Sewerage Inspection Report form is to be kept by you and presented to Council's Inspector at each stage of the development requiring a meeting or inspection.  The Inspector will sign the form at each stage when conditions have been satisfied.  The works will be accepted 'on maintenance' when this form, signed by the Inspector for each stage, is returned with a letter requesting that it go 'on maintenance'.

It is Council policy that a maintenance bond be imposed on construction works during the maintenance period.  The maintenance bond shall be 5% of the agreed value of the development obligations, or $1,500 whichever is the greater amount.  This bond must be lodged by (and shall only be accepted from) the Developer for the works.

Construction work and other associated activities are permitted only during the hours of 7:00am and 6:00pm Monday to Saturday.  No work is permitted on Sundays or public holidays, except where extended hours are approved by the Assessment Manager or his nominee.

Cut-ins to existing live sewer are to be performed by Approved Contractor.  Noosa Council Works Inspector shall be present during any work on live sewer undertaken by contractor.  An additional fee of $160.00 (included below) is required to cover costs associated with these live sewer works.

Fees applicable to the above project are listed below and are to be paid within fourteen (14) days of the date of this Decision Notice.
Plan Examination		$ 3145
Inspection Fee			$ 2805
Checking as-constructed data	$ 135.00
CCTV fee			$ 2865
SCADA 			$  -
BALANCE OWING		$ PAID 15 April 08 RN 396438

Council will provide all fittings and valves for the cut-in to the existing water supply as well as labour to perform the cut-in.  The Developer shall bear the actual cost of this work, and payment shall be made before the cut-in is done. Costs to be advised.

All water connection fees are to be paid prior to the pre-start meeting.
The water main must be commissioned prior to installing the water services and water meters.
The water service tappings on the new water main/s within the development must be undertaken by an approved subcontractor under direct Council supervision.  Tappings on water mains not constructed as part of the development works are to be carried out by Noosa Shire Council at developer’s cost.
The water & sewerage plans listed below are satisfactory:
Water
06583 – 21 A – Water Supply Layout Plan
Sewer
06583 – 18 A – Sewerage Reticulation Layout Plan 06583 – 19 A – Sewerage Reticulation Longitudinal Sections 06583 – 20 A – Sewerage Reticulation Notes
To be read in conjunction with Retaining Wall & Retention and Bio-rentention Basin Layout Plans 06583 – 15 A and 06583 – 16 A.

Additional Conditions 20 May 2011
The operational works may be undertaken in two stages generally in accordance with the drawing titled Allotment Layout Plan, numbered Fig 1b prepared by Project Strategy dated 5 April 2011. All operational works associated with the relevant stage must be complete prior to Council sealing the Plan of Survey for the stage.

Bioretention Basins
Bioretention devices must be constructed and landscaped in accordance with the document Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). Option 1 of the staged construction and establishment methods is to be followed as documented in the guidelines.

During construction of the bioretention devices, the supervising RPEQ must ensure that the Bioretention Construction and Establishment Sign-Off Forms contained in Section 3.15 of the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009) are completed and the supporting information and data required by the forms attached. These forms must be submitted to Council prior to On Maintenance in conjunction with certification from the RPEQ that the device has been constructed in accordance with the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), all conditions of approval, and the approved engineering drawings.

A construction hold point shall be established once the bioretention device underdrainage pipe work is installed. At this time an inspection shall be arranged with Council’s delegate. At the time of inspection, a sample of the drainage layer, transition layer, and filtration media materials must be stockpiled on-site, and certification that the filtration media complies with the specifications of the Guidelines Specifications for Soil Media in Bioretention Systems Version 2.01 (produced by the Facility for Advancing Water Biofiltration) must be available.

A construction hold point shall be established when the temporary cover is to be removed from the bioretention device an inspection shall be arranged with Council’s delegate.

Prior to each bioretention basin being accepted either On or Off maintenance and when the temporary cover is to be removed, the results of in-situ hydraulic conductivity testing conducted in accordance with FAWB PRACTICE NOTE 1: In Situ Measurement of Hydraulic Conductivity Belinda Hatt, Sebastien Le Coustumer April 2008 are to be provided for the bioretention filter media. The filter media is to achieve the design hydraulic conductivity prior to acceptance of the basins as either On or Off Maintenance, unless it can be demonstrated that the resulting hydraulic conductivity will not result in a significant reduction in the basins performance.

A licensed surveyor must undertake ‘as constructed’ survey of the bioretention device elements as required by the Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). The survey data must demonstrate that design grades and levels have been achieved to the required tolerances. The data must be submitted to Council for their records prior to On Maintenance.

Bioretention Basin Landscaping
The filter media area within the bioretention basin must be landscaped with functional plantings at a density of 8 plants per metre square.

At least 80% of the landscaping within the bioretention basin filter media area must consist of a mixture of at least 3 functional species including:Carex appressa; Ficinia nodosa; and  Juncus amabilis.

Bioretention Basin Maintenance
The bioretention devices are subject to the following maintenance period provisions which are separate from the maintenance period provisions specified for the remainder of the civil works. Following installation of the filter media for the bioretention devices, a temporary cover consisting of a suitable geotextile covered with soil and turfed is to be immediately installed. This temporary cover is to be provided to protect the filter media from clogging while building works occur on-site and is to be maintained in place for a minimum period of 24 months following acceptance of the bioretention devices On Maintenance or until 80% of building works has been completed whichever occurs first). Following this period the temporary cover is to be removed, and the approved plantings installed. The bioretention devices are then to be appropriately maintained for a minimum period of 12 months prior to being accepted as Off Maintenance by Council’s delegate.

Subsoil drains are to be cleaned out and accumulated sediment manually removed from the surface of basin and coarse sediment forebays at Off Maintenance and as required during the maintenance period.

All stormwater quality treatment devices shall be maintained by the development in accordance with the endorsed maintenance plan until they are accepted as Off Maintenance by Council.

If any WSUD device implemented within the development is found to be defective during the maintenance period, the design of the WSUD device shall be reviewed and a report recommending required rectification works submitted to Council and endorsed by Council’s delegate. Works to repair the device and prevent the problem occurring in the future shall be completed and the device maintained for a minimum period of 12 months prior to the WSUD device being accepted as Off Maintenance.

Prior to council accepting the bioretention devices Off Maintenance, maintenance checklists including associated operating costs for each WSUD measure implemented within the development must be submitted to Council in accordance with the latest version of the Healthy Waterways document; Water Sensitive Urban Design Technical Design Guidelines for South East Queensland.

Prior to the sealing of the plan of survey for the development, all site surfaces must be effectively stabilised using methods which have achieved effective short-term stabilisation and which will continue to achieve effective stabilisation in the medium to long-term (refer to E&SC Advice Note 5). For the purpose of this condition, an effectively stabilised surface is defined as one that does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water contamination.

REFERRAL AGENCY CONDITIONS

Not Applicable

APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following tables:

Approved Plans

Plan No.	Rev.	Plan Name	Date
06583-1	T1A	Cover Sheet & Locality Plan	27/05/08
06583-2	T1A	Roadworks Alignment Plan	27/05/08
06583-3	T1A	Earthworks Layout Plan	27/05/08
06583-4	T1A	Earthworks Cross Sections	27/05/08
06583-5	T1A	Roadworks & Stormwater Drainage Plan	27/05/08
06583-6	T1A	Longitudinal Section Venture Drive	27/05/08
06583-7	T1A	Cross Sections Venture Drive	27/05/08
06583-8	T1A	Long Section Road 1	27/05/08
06583-9	T1A	Cross Sections Road 1	27/05/08
06583-10	T1A	Cross Sections Road 1	27/05/08
06583-11	T1A	Intersection & Cul de sac details	27/05/08
06583-12	T1A	Stormwater Dge Long Sections A to K	27/05/08
06583-13	T1A	S/W Dge Long Sectns G to M & MH details	27/05/08
06583-14	T1A	Retaining Wall details	27/05/08
06583-15	T1A	Retaining Wall details	27/05/08
06583-16	T1A	Retention & Bio-retention Basin Plans	27/05/08
06583-17	T1A	Retention Basin Details & Sections	27/05/08
06583-18	T1A	Sewerage Reticulation Layout Plan	27/05/08
06583-19	T1A	Sewerage Reticulation Long Sections	27/05/08
06583-20	T1A	Sewerage Reticulation Notes	27/05/08
06583-21	T1A	Water Supply & Prelim Services Plan	27/05/08

ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of approval:
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees

Additional Advisory Notes 20 May 2011
Council has undertaken an audit check of the Operational works drawings in relation to the proposed works. A detailed design check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date, should design errors become apparent.

Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.

E&SC Advice notes
In this document, an effectively stabilised surface is defined as one that does not
have visible evidence of soil loss caused by sheet, rill or gully erosion  or
lead to sedimentation, or
lead to water contamination

Diverting clean stormwater runoff into a sediment basin is an inferior option to diverting clean stormwater around or through the site because it will cause an increase in the volume and frequency of contaminated releases from the sediment basin. For this reason, diverting clean stormwater into a sediment basin is not acceptable unless the proponent demonstrates that diverting clean stormwater around or through the site is not feasible.

Compensatory controls are erosion controls, flow controls and sediment controls which compensate for the lack of sediment basin and must be focussed on controlling turbidity and not just coarse sediment. The controls are applied such that the type, timing, placement and management of controls minimise the potential for water contamination and environmental harm. This is primarily achieved by reducing the risk of erosion and subsequent sediment release, for example by turfing or mulching and managing concentrated flows in the area.

Research has shown that sediment basins designed on a “batch” or total storm capture approach are only capable of treating a small percentage of the annual runoff volume without basin size becoming excessive. Innovation in sediment basin design to incorporate continuous flow treatment is likely to occur in the future and as this technology becomes available in best practice guidelines it is required that this technology be adopted where a better water quality outcome will result. In the interim the minimum basin size is as specified in the condition.

A site is determined to have achieved effective short-term stabilisation if at the time of the plan sealing inspection:
Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management practices such as in the Manual for Erosion and Sediment Control or the IECA Manual; and
Stormwater runoff from the site is not currently, and is not likely to result in visible evidence of sedimentation or erosion, or lead to water contamination.
If at the time of request for plan sealing, the method of short-term stabilisation has not achieved a stability that has a high probability of enduring in the long term (i.e. until house construction has occurred on all lots) the following will be taken into consideration in determining whether the site is capable of achieving medium to long-term stability:
Evidence that the site has been effectively stabilised in the short term:
Evidence that soil has been adequately ameliorated
Evidence that seed of annual and perennial grass species has been applied at an adequate rate; and
That grass seed has germinated at a density that is likely to achieve an effective grass cover; and
That the germinated grass is healthy and at least 40mm high

For example, while hydromulch can provide an immediate and effective stabilising cover to soils, the protective cover can be relatively short-lived if vegetation fails to establish before the thin layer of mulch decomposes. So if hydromulch is selected as the method of temporary short term stabilisation, it is important that perennial as well as annual grasses are well established at the time of plan sealing to reduce the risk of instability of the site in the medium to long term.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act.

PROPERTY NOTES

Not Applicable

PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

Not Applicable

FURTHER DEVELOPMENT PERMITS REQUIRED

Not Applicable

SELF ASSESSABLE CODES

Not Applicable

SUBMISSIONS

Not Applicable

REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not Applicable

RIGHTS OF APPEAL

You are entitled to appeal against this decision.  A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.

OTHER DETAILS

If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.noosa.qld.gov.au, or at Council offices.

DECISION NOTICE HISTORY 2008.658.2- Original Decision Notice. 23 June 2010 2008.658.3 - Changes to an Existing Approval & Extension to Relevant Period 20 May 2011 142008.658.4 – Extension to Relevant Period 12 August 2015

Yours faithfully

Mark Lewis
COORDINATOR ENGINEERING

Encl. 	Appeal Rights

cc	Unitywater

	Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009

The following is an extract from the Sustainable Planning Act 2009 (Chapter 7)

466 	Appeals about decisions relating to permissible changes
(1) 	For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval—
(a) 	if the responsible entity for making the change is the assessment manager for the application—
(i) 	the person who made the request; or
(ii) 	an entity that gave a notice under section 373 or a pre-request response notice about the request;
(b) 	if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.
(2) 	The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376.
(3) 	Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

[word/footer1.xml]
Page 3 of 15

[word/footer2.xml]
Page 1 of 15
			
		
					PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au

[word/header3.xml]
142008.658.4

[Attachment: image4.png (image text)]
 
 
 

 
 
 

a
mm

  

NOOSA
COUNCIL

Used in these records

About this file

File size
116 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

142008.658.4 Compiled Decision Notice.docx · 116 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.