2107-23530 SRA Amended response - with conditions

Attached to the e-mail MCU21/0110 - SRA application correspondence - Changed referral agency response—with conditions.

of 9

Page text shows just the words. Original shows the document exactly as it was published.

RA29-N




SARA reference:        2107-23530 SRA
Council reference:     MCU21/0110
Applicant reference:   16022

17 March 2023

The Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin Qld 4565
[email protected]

Attention:       Mr Patrick Murphy


Dear Mr Murphy

Changed referral agency response—with conditions
(Given under section 28 of the Development Assessment Rules)

On 15 February 2023 the State Assessment Referral Agency (SARA) received representations from the
applicant requesting the department change its referral agency response. The department has
considered the representations and now provides this changed referral agency response which replaces
the response dated 5 May 2022.


Applicant details
 Applicant name:                  Noosa Springs Real Estate Pty Ltd
 Applicant contact details:       c/- Adamson Town Planning
                                  PO Box 894
                                  Cooroy QLD 4563
                                  [email protected]

Location details
 Street address:                   61 Noosa Springs Drive, Noosa Heads
 Real property description:        Lot 4 on SP178340
 Local government area:            Noosa Shire Council

Application details
 Development permit                Material Change of Use - Resort complex (112 units 106 units), Bar,
                                   Food and drink outlet, Outdoor sport and recreation (3 4 x tennis courts)


                                                                      South East Queensland (North) regional
                                                                      office
                                                                      Level 4, Foundation Place 3 South Sea
                                                                      Islander Way, Maroochydore
 Page 1 of 9                                                          PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

2107-23530 SRA Amended response - with conditions.pdf · 455 KB (small file)

Full text of the other 8 pages

Page 2

                                                                                             2107-23530 SRA



Referral triggers
The development application was referred to the department under the following provisions of the
Planning Regulation 2017:
         10.10.3.3.1.1                 Koala habitat area in SEQ region
         10.9.4.1.1.1                  Infrastructure - state transport infrastructure

Conditions
Under section 56(1)(b)(i) of Planning Act 2016, the conditions set out in Attachment 1 must be attached
to any development approval.

Reasons for decision to impose conditions
The department must provide reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.

Advice to the assessment manager
Under section 56(3) of the Act, the department offers advice about the application to the assessment
manager—see Attachment 3.

Approved plans and specifications
The department requires that the plans and specifications set out below and enclosed must be attached
to any development approval.

 Drawing/report title              Prepared by              Date             Reference no.   Version/issue
 Aspect of development: Material change of use
 Noosa Springs – Koala             Gondwana Ecology         9 March          -               2
 Habitat Area Tree                 Group                    2023
 Schedule
                                   Marches Partners         8 March          Drawing SK.01   Rev 2
 Proposed Site Plan with                                    2023
 Koala Habitat Overlay
 Entry Link Level Plan             Marchese Partners        9 February       Drawing         Rev 13
                                                            2023             20079 DA1.01
 Site Plan                         Marchese Partners        9 February       20079 DA1.00    Rev 13
                                                            2023

A copy of this response has been sent to the applicant for their information.

For further information please contact Jodie Wilson, Senior Planning Officer, on 5352 9778 or via email
[email protected] who will be pleased to assist.

Yours sincerely




Garth Nolan
Manager (Planning)


 State Assessment and Referral Agency                                                            Page 2 of 9

Page 3

                                                                              2107-23530 SRA




cc      Noosa Springs Real Estate Pty Ltd, [email protected]

enc     Attachment 1—Changed conditions to be imposed
        Attachment 2—Changed reasons for decision to impose conditions
        Attachment 3—Changed advice to the assessment manager
        Approved plans and specifications




 State Assessment and Referral Agency                                            Page 3 of 9

Page 4

                                                                                              2107-23530 SRA



Attachment 1—Changed conditions to be imposed


 No.     Conditions                                                                    Condition timing
 Material change of use
 Schedule 10, Part 10, Division 3, Subdivision 3, Table 1, Item 1—Koala habitat area in SEQ region—
 The chief executive administering the Planning Act 2016 nominates the Director-General of the
 Department of Environment and Science to be the enforcement authority for the development to which
 this development approval relates for the administration and enforcement of any matter relating to the
 following conditions:
 1.      The development must be carried out generally in accordance with the          At all times
         following documents:
          Proposed Site Plan with Koala Habitat Overlay, prepared by Marchese
            Partners International Pty Ltd, dated 12/11/2020 8/03/2023, Dwg. No.
            SK.01, Revision 1 2.

 2.      Clearing is limited to the removal of 19 non-juvenile koala habitat trees     At all times
         identified with a red ‘X’ on Proposed Site Plan with Koala Habitat
         Overlay, prepared by Marchese Partners International Pty Ltd, dated
         12/11/2020, Dwg. No. SK.01, Revision 1.
         Retention of native vegetation within the Koala Habitat Area,
         identified within following documents, is to be maintained:
              Proposed Site Plan with Koala Habitat Overlay, prepared by
                  Marchese Partners International Pty Ltd, dated 8/03/2023,
                  Dwg. No. SK.01, Revision 2
              Noosa Springs – Koala Habitat Area Tree Schedule,
                  prepared by Gondwana Ecology Group, dated 9/03/2023
 3.      Prior to any building or operational works being undertaken, prepare a        (a) to (e) Prior to
         Koala Management Plan, which must:                                            any clearing,
             (a) Identify the clearing and construction activities that may increase   building or
                  the risk of stress, injury or death of koalas; and                   operational works
                                                                                       being undertaken
         (b) Detail the management measures that will be implemented during
             clearing works to prevent the risks identified in part (a) of this
             condition, including but not limited to all of the following:
             i.       Details of pre-clearing inspections of the vegetation to be
                      cleared;
             ii.      Measures required under the Nature Conservation (Koala)
                      Conservation Plan 2017, including the staging and
                      sequencing of clearing and provisions for a koala spotter
                      during clearing operations;
             iii.     Procedures for the recovery of koalas;
             iv.      Measures for dealing with trapped, injured, orphaned and
                      deceased koalas;
             v.       Contact details for the contractor for reports of at risk or
                      injured koalas;
             vi.      Procedures for checking machinery for koalas; and
             vii.     Measures to protect retained koala habitat and vegetation
                      (including open land) in accordance with Australian Standard
                      AS4970-2009;

         (c) Detail the management measures that will be implemented during
             construction works to prevent the risks identified in part (a) of this
             condition, including but not limited to all of the following:
             i.        Procedures for dealing with trapped, injured, orphaned and
                       deceased koalas;
             ii.       Contact details for the contractor for reports of trapped or


 State Assessment and Referral Agency                                                             Page 4 of 9

Page 5

                                                                                            2107-23530 SRA




                      injured koalas;
             iii.     The use of fauna exclusion fencing;
             iv.      Measures to minimise the impact of construction related dust
                      on adjacent koala habitat;
             v.       Signage in areas of vehicular traffic on site;
             vi.      Procedures for checking machinery for fauna;
             vii.     Measures to manage the risks posed by dogs (e.g., guard
                      dogs) on site;
             viii.    Measures to protect retained koala habitat and vegetation
                      (including open land) in accordance with Australian Standard
                      AS4970-2009;
             ix.      Requirements for sequential clearing and koala spotter in
                      accordance with Nature Conservation (Koala) Conservation
                      Plan 2017;
             x.       Measures to raise awareness amongst construction workers
                      of koalas on and near the construction activities; and

        (d) Be certified by a suitably qualified and experienced person.
        AND

        (e) Submit the Koala Management Plan to the Department of
            Environment and Science at [email protected]

        (f) Implement the management measures contained in the Koala
           Management Plan.
4.      Deliver an environmental offset in accordance with the Environmental         Prior to
        Offsets Act 2014 to counterbalance the significant residual impacts on       commencing any
        the matter of state environmental significance being 19 non-juvenile         clearing works.
        koala habitat trees.

        Note: Section 16 of the Environmental Offsets Act 2014 provides that
        when an offset condition is imposed on an authority, a number of
        deemed conditions are taken to apply. These deemed conditions are
        detailed in sections 19B, 22, 24 and 25 of the Environmental Offsets Act
        2014. Contravention of a deemed condition is taken to be contravention
        of an imposed condition.

        More information on offset delivery can be found online.

        Please send the notice of election to [email protected].      Prior to the commencement of clearing activities, notify the Department      72 hours prior to
        of Environment and Science at [email protected] of:            commencement
                                                                                     of vegetation
             the expected date the clearing activity will commence;                 clearing.
             the expected duration of the clearing activity;
             the name and contact details of the koala spotter that has been
               contracted for the clearing activity; and
             the name, contact details and authority number of the spotter
               catcher that has been contracted for the clearing activity.
6. 3.   The existing fencing around the perimeter of the property is to be           At all times
        maintained as koala exclusion fencing in accordance with the Koala
        Sensitive Design Guideline (Version 2), prepared by the Department of
        Environment and Science and dated 01/02/2020.
Schedule 10, Part 9, Division 4, Subdivision 1, Table 1, Item 1—Development impacting on State
transport infrastructure—The chief executive administering the Planning Act 2016 nominates the
Director-General of the Department of Transport and Main Roads to be the enforcement authority for


State Assessment and Referral Agency                                                            Page 5 of 9

Page 6

                                                                                             2107-23530 SRA




the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
7. 4.   The development must provide a dedicated pedestrian pathway from the          Prior to the
        porte cochere to the hotel reception generally in accordance with the         commencement
        following:                                                                    of use, and
              Entry Link Level Plan, prepared by Marchese Partners, dated            where on site, to
                12/11/2021 9/02/2023, drawing number 20079 DA1.01, revision           be maintained at
                8 13; and                                                             all times
        Site Plan, prepared by Marchese Partners, dated 12/11/2021 9/02/2023,
        drawing number 20079 DA1.00, revision 9 13.
8. 5.   (a) The development must provide a bus setdown facility as part of the        (a) – (b)
            porte cochere at the location shown as numbers 11 and 13 on the           Prior to the
            Entry Link Level Plan, prepared by Marchese Partners, dated               commencement
            12/11/2021 9/02/2023, drawing number 20079 DA1.01, revision 8             of use and to be
            13.                                                                       maintained at all
                                                                                      times
        (b) The bus setdown facility required in part (a) of this condition must be
            in accordance with the Disability Standards for Accessible Public         (c)
            Transport 2002 made under subsection 31(1) of the Disability              Prior to the
            Discrimination Act 1992 and include the following:                        commencement of
             capacity for one (1) single unit rigid bus of 14.5m in length to        use
                traverse the porte cochere as well as provision for the parking of
                one (1) single unit rigid bus of 14.5m within the porte cochere;
             kerb modifications in accordance with Swept Path – 14.5, Coach,
                prepared by Traffic Transport Plus, dated 01/02/22, Figure 2,
                revision 1;
             provision for the parking of one (1) mini-bus of 8m in length with
                8x5 trailer within the porte cochere whilst another mini-bus with
                trailer traverses the porte cochere in accordance with Swept
                Path – Mini Bus With Trailer, prepared by Traffic Transport Plus,
                dated 01/02/2022, Figure 5, revision 1;
             lighting in accordance with AS/NZS 1158.3.1 – Lighting for
                Roads and Public Spaces, Part 3.1: Pedestrian Area (Category
                P) Lighting – Performance and Design Requirements; and
             access and hardstand, and shelter with seats, for waiting and
                boarding/alighting passengers.

        RPEQ certification, with supporting documentation, must be provided to
        the Program Delivery and Operations Unit, North Coast Region
        ([email protected]) within the Department of Transport
        and Main Roads confirming that the development has been designed
        and constructed in accordance with parts (a) and (b) of this condition.
9. 6.   (a) The development must provide a dedicated passenger loading zone           (a) - (b)
            within the porte cochere at the location shown as number 11 on the        Prior to the
            Entry Link Level Plan, prepared by Marchese Partners, dated               commencement of
            12/11/2021 9/02/2023, drawing number 20079 DA1.01, revision 8             use and to be
            13.                                                                       maintained at all
                                                                                      times
        (b) The passenger loading zone required in part (a) of this condition
            must be designed and constructed to:                                      (c)
            (i)    Be suitable for use by a taxi catering for people with             Prior to the
                   disabilities in accordance with:                                   commencement of
                    AS1428.1 - Design for access and mobility;                       use
                    AS2890.6 – Parking Facilities, Part 6: Off-street parking
                       for people with disabilities;
                    Chapter 7 – Taxi Facilities of the Public Transport
                       Infrastructure Manual 2015; and



State Assessment and Referral Agency                                                            Page 6 of 9

Page 7

                                                                                             2107-23530 SRA




                          the Disability Standards for Accessible Public Transport
                           2002 - subsection 31(1) of the Disability Discrimination
                           Act 1992;
             (ii)     include lighting in accordance with AS/NZS 1158.3.1 –
                      Lighting for Roads and Public Spaces, Part 3.1: Pedestrian
                      Area (Category P) Lighting – Performance and Design
                      Requirements; and
             (iii)    provide access and hardstand, and shelter with seats, for
                      waiting and boarding/alighting passengers.

        RPEQ certification, with supporting documentation, must be provided to
        the Program Delivery and Operations Unit, North Coast Region
        ([email protected]) within the Department of Transport
        and Main Roads confirming that the development has been designed
        and constructed in accordance with parts (a) and (b) of this condition.
10.     (a) A RPEQ certified Traffic Management Plan must be prepared and             (a) & (b)
7.      given to the Program Delivery and Operations Unit, North Coast Region         Prior to the
        (via [email protected]) within the Department of                commencement of
        Transport and Main Roads.                                                     use, and where on
                                                                                      site, to be
        (b) The Traffic Management Plan must demonstrate how operation of the         maintained at all
        porte cochere will be monitored and managed to ensure safe movement           times
        of vehicle and pedestrians, in particular when a 14.5m coach is
        traversing the porte cochere when other vehicles are utilising the same.      (c) At all times
                                                                                      during operation.
        (c) The operation of the development must be undertaken in accordance
        with the Traffic Management Plan.




State Assessment and Referral Agency                                                            Page 7 of 9

Page 8

                                                                                           2107-23530 SRA



Attachment 2—Changed reasons for decision to impose conditions

The reasons for this decision are:
The development complies with State code 25: Development in South East Queensland koala habitat
areas. Specifically, the proposed changes to the development:
     minimises the amount of interference with a Koala Habitat Area.
        Note: Interfering with koala habitat is defined under Schedule 24 of the Planning regulation 2017
        as:
        (a) means removing, cutting down, ringbarking, pushing over, poisoning or destroying in any way,
            including by burning, flooding or draining, native vegetation in a koala habitat area; but
        (b) does not include destroying standing vegetation by stock, or lopping a tree
     no longer involves the removal of Non- Juvenille Koala Habitat Trees within a Koala Habitat Area,
        requiring an environmental offset.
     through conditioning, will ensure that future exempted development clearing does not occur
        within the mapped Koala Habitat Area and suitable canopy species for koala habitat and
        essential habitat is retained

The development complies with State code 6: Protection of state transport networks. Specifically, the
proposed changes to development:
     continues to provide safe and direct access to public passenger transport infrastructure, including
       access by cycling and walking
     does not compromise existing safe and direct access to public passenger transport infrastructure,
       including access by cycling and walking

Findings on material questions of fact
The subject site is mapped as containing koala habitat area (core koala habitat area, based on DES
technical agency assessment the core koala habitat area is 0.19ha of the site).

With regards to regulated vegetation, the site is mapped as containing:

       0.19ha of Category B (remnant vegetation) area comprising of least concern RE 12.2.5 (Figure 3)
        (Vegetation Management Property Report);
       3.62ha of non-remnant area (Figure 3) (Vegetation Management Property Report);
       0.19ha of essential habitat for the following species (Figure 4) (Vegetation Management Property
        Report):
                      Crinia tinnula wallum froglet V;
                      Litoria freycineti wallum rocketfrog V;
                              Litoria olongburensis wallum sedgefrog V;
                      Calyptorhynchus lathami glossy black-cockatoo V;
                      Phascolarctos cinereus koala V; and
                      Acacia attenuate V;
       High risk area on the protected plants flora survey trigger map (Figure 5) (Vegetation
        Management Property Report).

Evidence or other material on which the findings were based
 development application material and submitted plans
 State Development Assessment Provisions (version 3.0)
 The Development Assessment Rules
 Planning Act 2016
 Planning Regulation 2017
 SARA DA Mapping system
 State Planning Policy mapping system


 State Assessment and Referral Agency                                                         Page 8 of 9

Page 9

                                                                                                2107-23530 SRA



Attachment 3—Changed advice to assessment manager


 General advice
 1.      Terms and phrases used in this document are defined in the Planning Act 2016 its regulation or
         the State Development Assessment Provisions (SDAP) v2.63.0. If a word remains undefined it
         has its ordinary meaning.
 2.      Terms defined in the Glossary of Terms found within the state code 25: Development in South
         East Queensland koala habitat areas are taken to have the same meaning in these conditions.
 3.      A reference to state code 25 is a reference to the version of the state code 25: Development in
         South East Queensland koala habitat areas in effect as at the date of this development
         approval.
 4.      The Nature Conservation (Koala) Conservation Plan 2017 includes mandatory requirements
         that applies to all persons undertaking the clearing of koala habitat trees, including that clearing
         be undertaken sequentially and in the presence of a koala spotter. Penalties for non-
         compliance apply.
         For further information please contact the Department of Environment and Science at
         [email protected].      Despite this development approval, other permits or approvals may be required for the clearing
         of koala habitat. To determine if the proposed clearing requires other approvals under other
         local, State or federals laws go to www.qld.gov.au (search ‘vegetation clearing requirements’).
 6. 4.   The development contains areas mapped as containing a high-risk area on the protected plant
         flora survey trigger map. Where clearing is proposed within a high-risk area, it is a requirement
         under the Nature Conservation Act 1992 to conduct a flora survey in accordance with the Flora
         Survey Guidelines to determine if there are any protected plants on the clearing site. If
         protected plants are found on the clearing site, a clearing permit under the Nature Conservation
         Act 1992 may be required.
 7. 5.   The development contains habitat for threatened and special least concern fauna species. If
         the development requires tampering with a protected animal breeding place, a species
         management program may be required.

         More information on protected animal breeding places and species management programs can
         be found here: https://environment.des.qld.gov.au/licences-permits/plants-animals/species-
         management-program




State Assessment and Referral Agency                                                               Page 9 of 9

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.