                                                                                                  MCU13/0251.01

                      (a)     a 2.5 metre wide concrete shared pathway within the road verge for the entire
                              length of the site’s frontage to David Low Way
                      (b)     a 2 metre wide concrete pathway within the road verge for the length of the site’s
                              frontage to the unnamed road (Road 151) extending from the intersection with
                              David Low Way to the entrance to the site
                      (c)     reinstatement of road cycle lanes (minimum of 1.5m in width) and green pavement
                              treatments to delineate bike land and neatly integrate with existing bike land
                              treatments.
                      Stormwater Drainage
               51.    The site must be provided with a stormwater drainage system connecting to a lawful
                      point of discharge. The works must be undertaken in accordance with an Operational
                      Works approval and must include in particular a detailed Stormwater Management Plan
                      (including MUSIC modeling and reporting) for the construction and operational phases of
                      the development that:
                      (a)     demonstrates that there is no net increase in stormwater runoff (volume and
                              frequency) from the site
                      (b)     includes stormwater quality improvement devices that achieve the current “best
                              practice” water quality objectives
                      (c)     Sediment and Erosion Control Plan during the construction phases
                      (d)     Provision to cater for the stormwater runoff from the adjoining properties and roads
                              that drain through the site, including registration of drainage easements
                      (e)     All structures including infiltration pits, level spreaders etc, located within the
                              developable area of the site and clear of the area to be dedicated as Park.
               52.    All buildings proposed on site must be constructed to comply with Council’s Minimum
                      Floor Height requirements at the time of issue of the Building Permit.
                      Electricity and Telecommunication Services
               53.    Unless otherwise stipulated by telecommunications legislation at the time of
                      construction, the development must be provided with all necessary conduits, pits and
                      pipes to accommodate the future connection of optic fibre technology
                      telecommunications.
               54.    Certification must be submitted to Council from all relevant service providers which
                      certifies that the development has met the requirements of this Decision Notice and all
                      applicable legislation at the time of construction.
                      Easements
               55.    Unless otherwise agreed in writing by the relevant service provider, any public or third
                      party infrastructure located on the subject site must be placed within an easement
                      registered against the title of the property.
               56.    All easements must be designed in accordance with the planning scheme and granted
                      at no cost to the Grantee. Where the Grantee is Council or a service authority, the
                      easement documentation must be in accordance with the Grantee’s standard easement
                      terms. Draft easement documentation must be submitted to Council for endorsement.
               57.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               58.    All fill and associated batters must be undertaken in accordance with an Operational
                      Works approval, and contained entirely within the subject site unless written permission
                      from the respective landowner(s) is provided to Council. All earthworks must be
                      undertaken in accordance with the provisions of Australian Standard AS3798:
                      Guidelines on Earthworks for Commercial and Residential Developments.


                                                                                                   Page 9 of 16


Document Set ID: 20182356
Version: 1, Version Date: 11/10/2016

Used in these records

About this file

File size
148 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

160105 NSC Change to MCU Approval 111016.pdf · 148 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.