160105 NSC Change to MCU Approval 111016 · MCU13/0251
Attached to the e-mail Request for change to approval MCU13/0251.03.
MCU13/0251.01
(a) a 2.5 metre wide concrete shared pathway within the road verge for the entire
length of the site’s frontage to David Low Way
(b) a 2 metre wide concrete pathway within the road verge for the length of the site’s
frontage to the unnamed road (Road 151) extending from the intersection with
David Low Way to the entrance to the site
(c) reinstatement of road cycle lanes (minimum of 1.5m in width) and green pavement
treatments to delineate bike land and neatly integrate with existing bike land
treatments.
Stormwater Drainage
51. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular a detailed Stormwater Management Plan
(including MUSIC modeling and reporting) for the construction and operational phases of
the development that:
(a) demonstrates that there is no net increase in stormwater runoff (volume and
frequency) from the site
(b) includes stormwater quality improvement devices that achieve the current “best
practice” water quality objectives
(c) Sediment and Erosion Control Plan during the construction phases
(d) Provision to cater for the stormwater runoff from the adjoining properties and roads
that drain through the site, including registration of drainage easements
(e) All structures including infiltration pits, level spreaders etc, located within the
developable area of the site and clear of the area to be dedicated as Park.
52. All buildings proposed on site must be constructed to comply with Council’s Minimum
Floor Height requirements at the time of issue of the Building Permit.
Electricity and Telecommunication Services
53. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
54. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
55. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
56. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
57. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
58. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council. All earthworks must be
undertaken in accordance with the provisions of Australian Standard AS3798:
Guidelines on Earthworks for Commercial and Residential Developments.
Page 9 of 16
Document Set ID: 20182356
Version: 1, Version Date: 11/10/2016
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
160105 NSC Change to MCU Approval 111016.pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.