Council archive · source document
Extension to Currency Period Report 132005.1137.06
Author Development Planner, Wilhelm Koschade APPLICATION DETAILS Application No. 132005.1062.06 Development Approval Material Change of Use - Extension to Currency Period Applicant P & M Kelly Superannuation Pty Ltd Request Received On 12 March 2018 Report Completed Date 19 March 2018 PROPERTY DETAILS Property Address 7 Park Cres Sunshine Beach QLD 4567 RP Description Lot 1 & 2 GTP 574 Land Area 522m2 Existing Use of Land Vacant STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Eastern Beaches Zone Attached Housing Zone Assessment Type Extension to Currency Period PROPOSAL The application seeks approval to extend the relevant period by 6 years. The applicant suggests the reason for the extension relates to the accumulation of capital in order to develop the land. background Two separate applications for a Development Permit for Material Change of Use (Duplex Dwelling) & Operational Works were issued on 23 March 2006 over 5 and 7 Park Crescent. A Negotiated Decision Notice which made amendments to Conditions 8, 29 & 39 was issued on 4 August 2006. An approval to extend the relevant period was issued on 21 April 2010 which extended the period by 2 years until 23 March 2012. On the 25 June 2012, Council further extended the approval for 2 years, until 23 March 2014 On 4 February 2016 Council approved an extension to the relevant period until 23 March 2018. assessment The applicant has requested an extension to the currency period to the development approval under section 86 of the Planning Act 2016. Current Planning Scheme State Planning Policy The site is not affected by any of the mapped State Interests within the State Planning Policy. The Noosa Plan The application was approved as an impact assessable application under The Superseded Planning Scheme. As indicated in the previous extension to currency period reports, the proposal does not comply with The Noosa Plan’s probable solutions and specific outcomes relating to building height in storeys, roof form and setbacks. Building Height in Storeys The proposed basement no longer complies with the definitions within The Noosa Plan, making the development 4 storeys in height. Notwithstanding this non-compliance, the development is consistent with the character of the street, with the surrounding buildings all being 4 storeys in height. Given the non compliance, it is also noted that that the development complies with the maximum height of the planning scheme in metres. Roof Form – Roof Top Terrace The development includes a roof top terrace for the western unit. Although roof top terraces are generally not encouraged under The Noosa Plan, the proposal is considered acceptable as the proposed terrace will not present any opportunity to overlook the private open space of the existing residences to the north and east. While there is no development on the adjoining property to the west (5 Park Cres), the proposed design allows for sufficient vegetation along the western side setback, so as to reduce the opportunity to overlook the neighbouring private open space. The design is also compatible with the roof form of other developments along Park Crescent and the nearby locality, with a number of the buildings having roof top terraces and low pitched roofs (notably the adjoining development to the east of the site). Setbacks The proposed 3rd storey of the development has a 500mm encroachment on the northwest side setback. The encroachment is considered to comply with The Noosa Plan outcomes, as the encroachment is only 3.1m of the internal stairwell and would not interfere with the privacy or visual amenity of the adjoining allotment. Community’s Current Awareness of the Development The proposal is not impact assessable under the current Noosa Plan. RECOMMENDATION That Council note the report regarding Application No. 132005.1137.05, for a Development Permit for Material Change of Use - Extension to Currency Period situated at 7 Park Cres Sunshine Beach Qld 4567 described as Lot 1 & 2 GTP574, and approve the extension to the currency period and amend condition 10 to read as follows: 10. The Development Permit for a material change of use of premises and operational works lapses if the use has not happened by 23 March 2020, unless an application to extend the currency is approved by Council. [word/footer1.xml] Page 2 of 2 [word/header1.xml] 3 [word/header2.xml] EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Extension to Currency Period Report 132005.1137.06Related documentApplication case desk ↗
About this file
- File size
- 29 KB (small file)
- File type
- DOCX
No other editions are linked here.