Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2508-47877 SRA - SARA response with conditions

Attached to the e-mail SARA response with conditions - MCU25/0090 and OPW25/0136.

of 7

Page text shows just the words. Original shows the document exactly as it was published.

RA6-N




SARA reference:        2508-47877 SRA
Council reference:     MCU25/0090 and OPW25/0136
Applicant reference:   20250996



10 November 2025

Chief Executive Officer
Noosa Shire Council
PO Box 141
Tewantin QLD 4565
[email protected]


Dear Sir/Madam


SARA referral agency response — 15 and 17 Myall Street, Cooroy
(Referral agency response given under section 56 of the Planning Act 2016)

The development application described below was confirmed as properly referred by the State
Assessment and Referral Agency (SARA) on 27 August 2025.


Response
Outcome:                            Referral agency response – with conditions
Date of response:                   10 November 2025
Conditions:                         The conditions in Attachment 1 must be attached to any
                                    development approval
Advice:                             Advice to the applicant is in Attachment 2
Reasons:                            The reasons for the referral agency response are in Attachment 3


Development details
Description:                       Development permit for material change of use – multiple dwelling (2 x
                                   dwellings, 11 x small dwellings)
                                   Development permit for operational work – road work, drainage work,
                                   stormwater, earthworks, landscaping and access
SARA role:                         Referral agency
SARA trigger:                      Schedule 10, Part 9, Division 4, Subdivision 2, Table 4, Item 1 -
                                   Material change of use of premises near a state transport corridor or
                                   that is a future state transport corridor (Planning Regulation 2017)
SARA reference:                    2508-47877 SRA

                                                                             SEQ (North) regional office
                                                                             Level 4, Foundation Place 3 South Sea
                                                                             Islander Way, Maroochydore
 Page 1 of 7                                                                 PO Box 1129, Maroochydore QLD 4558
Log in to download the original file

2508-47877 SRA - SARA response with conditions.pdf · 350 KB (small file)

Full text of the other 6 pages

Page 2

                                                                                                   2508-47877 SRA




Assessment manager:                     Noosa Shire Council
Street address:                         15 and 17 Myall Street, Cooroy
Real property description:              Lot 22 on C5605 and Lot 21 on C5605
Applicant name:                         The Macky Group Pty Ltd
Applicant contact details:              PO Box 7618
                                        Sippy Downs QLD 4556
                                        [email protected]
State-controlled road access            This referral included an application for a road access location, under
permit:                                 section 62A(2) of Transport Infrastructure Act 1994. Below are the
                                        details of the decision:
                                         Approved
                                         Reference: TMR25-047409
                                         Date: 4 November 2025
                                        If you are seeking further information on the road access permit,
                                        please contact the Department of Transport and Main Roads at
                                        [email protected]
Human Rights Act 2019                   A consideration of the 23 fundamental human rights protected under
considerations:                         the Human Rights Act 2019 has been undertaken as part of this
                                        decision. It has been determined that this decision does not limit
                                        human rights.


Representations
An applicant may make representations to a concurrence agency, at any time before the application is
decided, about changing a matter in the referral agency response (s.30 Development Assessment
Rules). Copies of the relevant provisions are in Attachment 4.

A copy of this response has been sent to the applicant for their information.

For further information please contact Celeste Bownds, Senior Planning Officer, on (07) 5352 9708 or via
email [email protected] who will be pleased to assist.

Yours sincerely




Jamaica Hewston
Manager

cc      The Macky Group Pty Ltd, [email protected]

enc     Attachment 1 - Referral agency conditions
        Attachment 2 - Advice to the applicant
        Attachment 3 - Reasons for referral agency response
        Attachment 4 - Representations about a referral agency response provisions
        Attachment 5 - Documents referenced in conditions




 State Assessment and Referral Agency                                                                  Page 2 of 7

Page 3

                                                                                                     2508-47877 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.    Conditions                                                                       Condition timing
 Material change of use
 10.9.4.2.4.1 — The chief executive administering the Planning Act 2016 nominates the Director-
 General of the Department of Transport and Main Roads (DTMR) to be the enforcement authority for
 the development to which this development approval relates for the administration and enforcement of
 any matter relating to the following conditions:
 1.     Utilities, infrastructure and services are to be relocated generally in          Prior to
        accordance with Proposed Site Layout sheet C04, prepared by Ingeniir             commencement of use
        Pty Ltd, dated 20/10/2025, with reference 251502, and Issue 3, as                and to be maintained
        amended in red by SARA on 10 November 2025 to show the works.                    at all times.
 2.     (a)    Carry out the stormwater management of the development                    (a) At all times.
               generally in accordance with:
                i.  Stormwater Management Plan, prepared by Ingeniir Pty                 (b) Within 20 business
                    Ltd, dated 24/07/2025, with reference 251502-SMP, and                days of the completion
                    Revision 01, specifically: section 4: Stormwater Strategy            of works.
                    and section 6: Stormwater Quantity; and
               ii.  Proposed Stormwater and Site Level Layout sheet C05,
                    prepared by Ingeniir Pty Ltd, dated 20/10/2025, with
                    reference 251502, and Issue 3.

        (b)    Submit RPEQ certification (with supporting documentation) to
               the North Coast Regional Corridor Management team within the
               DTMR, via [email protected] confirming that
               the development has been constructed in accordance with part
               (a) of this condition.
 3.     (a)    Road access is located generally in accordance with Proposed
                                                                                         (a) At all times.
               Site Layout sheet C04, prepared by Ingeniir Pty Ltd, dated
               20/10/2025, with reference 251502, and Issue 3, as amended in
               red by SARA on 10 November 2025 to show the road access                   (b) and (c):
               location.                                                                 Prior to the
                                                                                         commencement of
        (b)    Provide road access works comprising of a Vehicle Crossing,               use.
               Heavy Duty, General Wide with a W1 value of 6m at the road
               access location referred to in part (a) of this condition.

        (c)    Design and construct the road access works, referred to in part
               (b) of this condition, in accordance with:
                i.    the Institute of Public Works Engineering Australasia
                      (IPWEA) drawing number RSD-102 Revision A;
               ii.    DTMR Road Planning and Design Manual, 2nd Edition;
              iii.    DTMR Policies and Technical Specifications;
              iv.     DTMR Standard Drawings Roads; and
               v.     relevant local government requirements.
 4.     (a)    Close and remove the existing vehicular property access located           (a) and (b):
               between Lots 21 & 22 C5605 and Myall Street.                              Prior to the
                                                                                         commencement of
        (b)    The road works to close and remove access, referred to in part            use.
               (a) of this condition, must be in accordance with DTMR Road
               Planning and Design Manual, 2nd Edition. The road works must:
                i.    remove the driveway crossovers and any drainage
                      structure/s beneath the driveway;


 State Assessment and Referral Agency                                                                    Page 3 of 7

Page 4

                                                                                          2508-47877 SRA




              ii.   reinstate the kerb and channel;
             iii.   reinstate road pavement after closure and removal; and
             iv.    re-establish the pedestrian pathway.
5.     (a)    Provide a 2 metre noise barrier in the locations shown in the      Prior to the
              Acoustic Report, prepared by Acoustic Works, dated                 commencement of use
              18/07/2025, with reference 2025219, and Revision R01A,             and to be maintained
              specifically within Figure 7: TMR Acoustic barrier – Level 1 and   at all times.
              Table 12: Recommended Acoustic Barrier Height.

       (b)    Design the noise barrier generally in accordance with Section 8.
              Recommendations of the Acoustic Report, prepared by Acoustic
              Works, dated 18/07/2025, with reference 2025219, and Revision
              R01A and the following standards:
               i.  DTMR Traffic Noise Management Code of Practice,
                   Volume 1, Chapter 7 and technical Specifications
                   MRTS15;
              ii.  DTMR technical Specifications MRTS15 Noise Fences (as
                   amended by QR-CTS-Part 41);
             iii.  Queensland Rail Civil Engineering Standard Specification
                   QR-CTS-Part 41 – Design and Construction of Noise
                   Fences / Barriers; and
             iv.   DTMR Standard Drawings.

       (c)    Submit RPEQ certification to the North Coast Regional Corridor
              Management team within the DTMR, via
              [email protected] confirming that the
              development has been designed and constructed in accordance
              with part (a) and (b) of this condition.




State Assessment and Referral Agency                                                         Page 4 of 7

Page 5

                                                                                             2508-47877 SRA




Attachment 2—Advice to the applicant

General advice
1.      Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
        or the State Development Assessment Provisions (SDAP) (version 3.3). If a word remains
        undefined it has its ordinary meaning.
2.      Public utility works and connection approval
        The applicant is advised that if any works and/or connections are required to public utility
        services within a state-controlled road reserve, approval must be given by the DTMR under the
        relevant public utility legislation (electricity, water/sewer, telecommunication), and in
        accordance with DTMR technical standards (Non-Transport Utility Management and Design
        Manual) available at https://www.tmr.qld.gov.au/business-industry/technical-standards-
        publications/non-transport-utility-management-and-design-manual
        Approvals must be obtained prior to commencing any utility works within the state-controlled
        road reserve. Please contact the public utility team via [email protected] for further
        information on the application and approval process.
3.      Road works approval
        Under section 33 of the Transport Infrastructure Act 1994, written approval is required from the
        DTMR to carry out road works on a state-controlled road prior to the works commencing.
        Please contact DTMR on [email protected] with the completed application
        form and supporting information to make an application for road works approval.

        To ensure that gaining approval does not delay construction please contact DTMR as soon as
        possible. Further information on applying for road works approval is available here:
        www.tmr.qld.gov.au/Community-and-environment/Planning-and-development/Other-matters-
        requiring-approval#roadworks




State Assessment and Referral Agency                                                             Page 5 of 7

Page 6

                                                                                            2508-47877 SRA




Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)

The reasons for the SARA’s decision are:
 SARA assessed the development against the following code(s) of the State Development
   Assessment Provisions (SDAP), version 3.3:
       o State code 1: Development in a state-controlled road environment.
 The development complies with the assessment benchmarks of State code 1 of SDAP in that the
   development:
       o does not adversely impact the structural integrity or physical condition of the state controlled
          road
       o does not adversely impact the function and efficiency of the state controlled road
       o maintains access to active transport infrastructure.

Material used in the assessment of the application:

      the development application material and submitted plans
      Planning Act 2016
      Planning Regulation 2017
      the SDAP (version 3.3), as published by SARA
      the Development Assessment Rules
      SARA DA Mapping system
      section 58 of the Human Rights Act 2019



Attachment 4—Representations about a referral agency response
provisions
(page left intentionally blank)




    State Assessment and Referral Agency                                                       Page 6 of 7

Page 7

                                                  2508-47877 SRA




Attachment 5—Documents referenced in conditions
(page left intentionally blank)




 State Assessment and Referral Agency                Page 7 of 7

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.