Our Ref: N13078CL01.AW.mm.docx Contact: Anthony Wright 17 October 2014 Noosa Council PO Box 141 TEWANTIN QLD 4565 Attention: Mr Monkeith Kadhum Dear Monkeith Doonella Noosa Stage C - Roadworks, Stormwater, Water & Sewer Infrastructure, Landscaping Sea Eagle Drive, Noosaville Operational Works Approval No. OPW14/0197 Submission of Amended Plans We refer to the Decision Notice provided by Council dated 7 October 2014 in relation to the above project and submit amended civil and landscape plans in accordance with council’s requests. In regards to Condition 38, AECOM wish to request that council change the condition to read: Landscape plans for the areas surrounding the bioretention basin filter media footprint must be arranged to minimise shading to the filter media footprint are. Suitable plants include the following: (a) Carex appressa (b) Carex fascicularis. (c) Ficinia nodosa. (d) Juncus usitatis. (e) Lomandra longifolia. (f) Ghania sieberiana. (g) Banksia robur. (h) Dianella brevipendunculata. (i) Themada triandra. (j) Cymbopogan refractus. (k) Melaleuca thymifolia, (l) Casuarina glauca Please contact Suzanne Crawford from AECOM on (07) 3553 4085 or [email protected] should you wish to discuss the above proposed change. As discussed with Cherie, in order to maintain the bioretention area within the Northern swale we have included local widening where possible. The widening is gradual to avoid scouring issues. K1 Building, Level 3, 16 Innovation Parkway, Birtinya QLD 4575 Brown Consulting (QLD) Pty Ltd PO Box 997, Buddina QLD 4575 Australia ABN 38 109 428 506 Telephone +61 7 5314 2520 Facsimile +61 7 5314 2522 brownconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
We would also request that council assess the electrical plans provided as part of the RFI response dated 7 July
2014 under the above approval as agreed with Mark Lewis.
Should you have any questions regarding the revised civil plans please contact Anthony Wright on 0448 165 114
or [email protected]. We look forward to receiving approved plans in the near future.
Yours sincerely
Brown Consulting (QLD) Pty Ltd
Shaun Pilcher
Senior Engineer - Urban Development
ATTACHMENTS
1. Amended Civil Drawings
2. Amended Landscape Drawings
COPIES:
1. Greg Mackney, QM Properties
2